CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-20-0014


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-20-0014
Right-of-Way Vacation
Closed
GOOD SAMARITIAN HOSPITAL
Other
ROW FOR CRANE PICK ~ GSH
01/09/2020
02/25/2020
04/12/2020
02/29/2020

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review VOID 01/09/2020 12/09/2021
Engineering Traffic Review Approved 01/09/2020 02/11/2020
Engineering Review Approved 01/15/2020 02/11/2020

Fees

Paid Fees Amount Paid Owing Date Paid
General Engineering Inspection Fee $130.00 $130.00 Paid 02/25/2020
No
Traffic Control Plan Review Fee $40.00 $40.00 Paid 02/25/2020
No
Traffic Control Permit Fee $50.00 $50.00 Paid 02/25/2020
No
Engineering Permit Fee $80.00 $80.00 Paid 02/25/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: * THE ENGINEERING INSPECTOR FOR THIS JOB IS MARCUS SEDLICKAS. MARCUS CAN BE REACHED AT 253-405-1707. * ** FULL STREET CLOSURE IS ALLOWED ON SATURDAY FEBRUARY 22, 2020 BETWEEN THE HOURS OF 6:30 A.M. AND 3:30 P.M. ONLY ** ** 72 HOURS PRIOR TO STREET CLOSURE THE USE OF FLASHING READER BOARDS IS REQUIRED AT BOTH ENDS OF PROPOSED CLOSURE (see attached notification map) Follow approved Traffic Control Plan (TCP) Work between the hours of 9am & 3pm Call Comm Center day(s) of lane closure at 253-841-5431 A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. 1. Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection at 253-405-1707. 2. I agree to have the approved permit on site at all times. 3. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. Enter Action Code 6910 to schedule an inspection using the automated inspection line. 11. TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.