CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-20-0387


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-20-0387
Right-of-Way Vacation
Closed
CPSRTA
Other
ROW ~ DP7 JOINT TRENCH
08/25/2020
10/23/2020
02/21/2023
08/25/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 10/22/2020
Engineering Traffic Review Approved 10/22/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 08/25/2020
No
Traffic Control Permit Fee $50.00 $50.00 Paid 08/25/2020
No
Engineering Permit Fee $80.00 $80.00 Paid 08/25/2020
No
General Engineering Inspection Fee $130.00 $130.00 Paid 08/25/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: * Prior to starting work, coordinate with city inspector, Michael Rosenau, at 253-344-6753 * ** The use of a steel trench plate is required if left open outside of work hours. STEEL PLATE AHEAD and MOTORCYCLISTS USE EXTREME CAUTION advanced warning signs are required for steel plates installed in the public right-of-way. ** *** See City of Puyallup Minimum Requirements for Night Traffic Control TE-007 attached *** **** The use of reflective drums with flashing lights must start and end each line of channeling. Additional lights, cones or signage may be required by the City Inspector **** *****The trench and surrounding work area shall be fenced at night.***** ******Permit E-20-0389 must be approved and issued within two weeks of this permit's work commencement. The 5th St NW crosswalk at 3rd Ave NW may be temporarily closed for a maximum of two weeks under this permit. The crosswalk shall be barricaded and painted black. Crosswalk signs and RRFBs shall be bagged. Railroad crossing markings shall remain visible at all times.****** *******Device spacing 1/2 distance for opposing traffic devices.******* ********The applicant is responsible to coordinate redundant traffic control signs with other traffic control plans authorized for this site.******** *********Coordinate with City Inspector, Michael Rosenau, prior to starting work by calling him at 253-344-6753.********* Follow approved Traffic Control Plan (TCP) CLOSURE ALLOWED: Monday -Friday All hours for five consecutive days Call Comm Center day(s) of lane closure at 253-841-5431 Schedule an inspection by calling the Engineering Inspectors' line at 253-435-3650. 48-hour advance notice of start date is required for coordination purposes. The applicant shall notify all residents and businesses within 300 feet of the work area 48 hours in advance of work commencement. The notification shall be distributed on informational door hangers, displayed on message boards, or on signs posted visibly along the right-of-way. Place a ROAD WORK AHEAD sign for westbound traffic on W Stewart Ave. Inspection time performed during a regular 8 hour day Monday - Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three hour minimum. A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. 1. Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection at Inspection Request Line: 1-877-232-6456 or https://secure.puyallupwa.gov. 2. I agree to have the approved permit on site at all times. 3. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. Enter Action Code 6910 to schedule an inspection using the automated inspection line. 11. TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.