CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-20-0393


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-20-0393
Civil Construction Permit
Closed
PUYALLUP SCHOOL DIST NO 3
Other
TRANSPORTATION RESTROOM PORTABLES ~ PSD **ON-SITE PRECON** **B-20-0761**
08/26/2020
01/25/2021
01/25/2023
03/01/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Public Works Water Review VOID 12/09/2021
Engineering Review Approved 03/01/2021
Engineering Civil Review Approved 12/07/2020
Public Works Streets Review Approved 12/07/2020
Engineering Storm Review Approved 12/07/2020
Engineering Civil Review Approved 10/19/2020
Engineering Traffic Review Approved 10/14/2020
Fire Review Approved 10/07/2020
Public Works Collection Review Approved 09/09/2020
Planning Review In Progress 08/27/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Civil Review Additional Fee $715.00 $715.00 Paid 01/14/2021
No
Storm System Development Charge $3,312.00 $3,312.00 Paid 01/14/2021
No
Engineering Inspection Fee (3%) $304.42 $304.42 Paid 01/14/2021
No
Engineering Permit Fee $300.00 $300.00 Paid 01/14/2021
No
Civil Review Fee $470.00 $470.00 Paid 10/06/2020
No
Record Drawing Review Fee $200.00 $200.00 Paid 10/06/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
08/26/2020 Plans E-20-0393 APPROVED PLANS.pdf
08/26/2020 Plans e-20-0393 approved plans-f.pdf
08/26/2020 Plans e-20-0393 resub 1 storm drainage with response.pdf
08/26/2020 Plans e-20-0393 resub 1 storm drainage with response.pdf
08/26/2020 Plans E-20-0393 STORM LETTER-f.pdf
08/26/2020 Plans psd trns restroomsl as-builts.pdf


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.