CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-20-0504


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-20-0504
Civil Construction Permit
Closed
CPSRTA
Other
DP2 SOUND TRANSIT SITEWORK & UTILITIES **9.17.21 PCR**
10/14/2020
02/19/2021
03/30/2024
10/02/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 02/17/2021
Planning Review In Progress 02/17/2021
Public Works Water Review Approved 02/16/2021
Engineering Civil Review Approved 02/11/2021
Fire Review Approved 02/10/2021
Planning Review Approved 02/08/2021
Engineering Traffic Review Approved 01/28/2021
Public Works Water Review Approved 01/28/2021
Engineering Traffic Review Approved 12/11/2020
Engineering Civil Review Approved 12/11/2020
Fire Review Approved 12/10/2020
Planning Review Approved 12/01/2020
Public Works Collection Review Approved 11/02/2020
Public Works Water Review Approved 10/29/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 02/19/2021
No
Engineering Permit Fee $300.00 $300.00 Paid 02/19/2021
No
Traffic Control Permit Fee $50.00 $50.00 Paid 02/19/2021
No
Planning Landscape Review Fee $300.00 $300.00 Paid 02/19/2021
No
Civil Review Additional Fee $6,890.00 $6,890.00 Paid 02/19/2021
No
Storm System Development Charge $127,680.00 $127,680.00 Paid 02/19/2021
No
Engineering Inspection Fee (3%) $18,683.75 $18,683.75 Paid 02/19/2021
No
Record Drawing Review Fee $200.00 $200.00 Paid 10/26/2020
No
Civil Review Fee $470.00 $470.00 Paid 10/26/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Partial Pass 1/26/2022 01/26/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/27/2022 01/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/14/2021 12/14/2021 02/07/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/7/2022 02/07/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/8/2022 02/09/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/9/2022 02/09/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/10/2022 02/10/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/11/2022 02/11/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/14/2022 02/14/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/15/2022 02/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/16/2022 02/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/17/2022 02/17/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/18/2022 02/18/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/21/2022 02/22/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/22/2022 02/23/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/23/2022 02/24/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/24/2022 2/24/2022 02/24/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/25/2022 02/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 02/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/28/2022 02/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/10/2022 03/10/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/11/2022 03/14/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/14/2022 03/14/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/15/2022 03/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/16/2022 03/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/17/2022 03/17/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/18/2022 03/18/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/21/2022 03/22/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/22/2022 03/23/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/23/2022 03/24/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/24/2022 03/24/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/25/2022 03/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/28/2022 03/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/29/2022 03/30/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/30/2022 03/30/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/31/2022 04/01/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/4/2022 04/05/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/5/2022 04/05/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/6/2022 04/06/2022
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 4/6/2022 04/07/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/7/2022 04/08/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/8/2022 04/08/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/11/2022 04/11/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/12/2022 04/13/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/13/2022 04/13/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/14/2022 04/14/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/15/2022 04/15/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/18/2022 04/18/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/19/2022 04/20/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/20/2022 04/21/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection VOID 04/21/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection VOID 04/21/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection VOID 04/21/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/21/2022 04/22/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/22/2022 04/22/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/26/2022 05/27/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/27/2022 05/31/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/31/2022 05/31/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/1/2022 06/01/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/8/2022 06/09/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/9/2022 06/09/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/10/2022 06/13/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/14/2022 06/14/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/15/2022 06/15/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 6/16/2022 06/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/06/2022
Michael Rosenau ((253) 344-6753)
Engineering Punchlist Inspection Failed 02/21/2023
Mark Higginson ((253) 841-5559)
Engineering Punchlist Inspection Failed 02/22/2023
Mark Higginson ((253) 841-5559)
Engineering Punchlist Inspection Failed 02/22/2023
Mark Higginson ((253) 841-5559)
Engineering Daily Inspection VOID 09/28/2023
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Punchlist: Provide DCVA Test Results Resolved Engineering Division Water Punchlist Section A
: Provide the City with the test results for the irrigation Double Check Valve Assembly (DCVA).
Punchlist: Miscellaneous Water B Item Resolved Engineering Division Water Punchlist Section B
: Remove soil inside the domestic water DCVA vault.
Punchlist: Provide DCVA Test Results Resolved Engineering Division Water Punchlist Section A
: Provide the City with the test results for the domestic Double Check Valve Assembly (DCVA).
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Install threaded cap and adaptor on the 2nd Ave NW sewer C.O. # 3.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Install threaded cap and adaptor on the 2nd Ave NW sewer C.O. # 4 (Sampling Tee).
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Install threaded cap and adaptor on the 2nd Ave NW sewer C.O. # 6.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Install threaded cap, adaptor, and boxes on the two Vancouver Door sewer cleanouts in the landscape area north of Vancouver Door’s building.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Install threaded cap, adaptor, and box on cast iron sewer C.O. directly upstream of the East lot OWS.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Grout risers on the Vancouver Door glue trap vault castings (2ea.) located in the East lot drive isle.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Provide adequate clearance in casting to remove/install threaded cap on sewer C.O. at R.O.W. line in the East lot approach.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Provide any startup/manufacturer inspection for both OWS's.
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Provide access to SSMH # 1 (pump wet well), 2nd Ave OWS, and the East lot OWS for inspection. SSMH # 1 requires a square drive T-handle. Both OWS appear to require a proprietary tool to operate the lock assembly. These will need to be provided to the owner for future access.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Grout casting to risers on interior of LOT SDMH #2 and put a concrete collar around the exterior of the casting.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Install threaded cap and adaptor on storm drain C.O. # 17.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Repair grout on Lot CB #’s 4, 3, 1A, 1.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Install concrete collars on storm drain C.O. #’s 2, 3, & 6 or replace castings with Carson (or equal) yard boxes marked C.O..
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Adjust box on the west bioretention unit C.O. # 12 so lid will close properly on yard box.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Bolt down bee hive grate on CB # 10 in the west bioretention unit.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Install concrete collar around exterior of casting on East Lot SDMH # 1.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Install concrete collar or river rock ring around East Lot CB # 4 to prevent landscaping bark from entering the open grate.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Install threaded cap and adaptor on the roof drain C.O. (relocated C.O. # 16) located in the landscaping area on the south side of the elevator entrance in the East Lot.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Repair grout in East Lot CB # 3.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Provide inspection reports from manufacturer on all Water Quality Vaults and Storm Filters.
Punchlist: Miscellaneous Stormwater B Item Resolved Engineering Division Storm Punchlist Section B
: Install City provided Catch Basin Markers on all open grated storm structures within paved areas.
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: Secure removable sections of the S.S. handrail along 5th St NW.
Punchlist: Miscellaneous A Item Resolved Engineering Division Misc. Punchlist Section A
: Contact the Planning Department project reviewer, Chris Beale at cbeale@puyallupwa.gov to request landscape inspection and final approval. Landscape items may be added to the punchlist subject to Planning's walkthrough.
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s Resolved Engineering Division Storm Punchlist Section A
: Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Punchlist: Provide the City a signed letter for the GI/OWS that it was installed correctly Resolved Engineering Division Sewer Punchlist Section A
: Provide the City with a letter from the design engineer certifying that the installation of both oil-water separators was performed in accordance with all regulations and the approved plans.
Punchlist: Miscellaneous Stormwater B Item Resolved Engineering Division Storm Punchlist Section B
: Provide the City with a DRAFT copy of the "Stormwater Management & BMP Facilities Agreement" associated with the project. The agreement can be obtained on the City’s website under Development Engineering, Additional Forms. The agreement shall include an operation and maintenance manual that is consistent with the provisions in the City's "Stormwater Maintenance Manual for Private Facilities" for all stormwater facilities and BMP’s associated with this project. Once approved, provide a recorded copy of the agreement.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Engineering Division Misc. Punchlist Section B
: Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Miscellaneous B Item Resolved Engineering Division Misc. Punchlist Section B
: NOTE: Please be aware that Occupancy of the Garage cannot be granted until such time that work associated with the DP3 permit, E21-0022, have been completed and/or mutually agreed between the applicant, owner, and City.
Punchlist: Miscellaneous Sewer B Item Resolved Engineering Division Sewer Punchlist Section B
: Provide access to SSMH # 1 (pump wet well), 2nd Ave OWS, and the East lot OWS for inspection. SSMH # 1 requires a square drive T-handle. Both OWS appear to require a proprietary tool to operate the lock assembly. These will need to be provided to the owner for future access.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
12/07/2022 Letter Inspection Punch List
02/07/2023 Report DCVA C Test Fire
02/07/2023 Report Puyallup Station Parking Backflow Test
02/07/2023 Report DCVA Test Report Domestic Water
02/13/2023 Plans E-20-0504 APPROVED PLANS
02/16/2023 Report Oil Water Separators Test-Cert.
02/21/2023 Letter Inspection Punchlist (Engineering Punchlist Inspection)
02/22/2023 Letter Inspection Punchlist (Engineering Punchlist Inspection)
05/04/2023 Agreement RECORDED SWA
06/15/2023 Letter Inspection Punchlist
10/03/2023 Plans Final As-Builts_REV 1


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.