Engineering Permit Application Status

E-21-0412


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-21-0412
Right-of-Way Vacation
Canceled
GOOD SAMARITAN COMM HEALTHCARE
Other
OVERSIZED LOAD DELIVERY TO GSH MOB ON 4/28/11 8.6.21 APPLICATION INCOMPLETE;SENT EMAIL/CANX AT THIS TIME
08/06/2021
10/05/2021
08/11/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review VOID 12/09/2021
Engineering Traffic Review VOID 12/09/2021

Fees

There are no fees for this engineering permit application, or you are not authorized to view them.

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: Follow approved Traffic Control Plan (TCP) Work between the hours of 9am & 3pm Call Comm Center day(s) of lane closure at 253-287-4456. Inspection time performed during a regular 8 hour day Monday - Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three hour minimum. A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. 1. Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection at Inspection Request Line: 1-877-232-6456 or https://secure.puyallupwa.gov. 2. I agree to have the approved permit on site at all times. 3. The Applicant is responsible to call the Engineering inspection line at 253-435-3650 to schedule a utility inspection prior to backfilling. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. Enter Action Code 6910 to schedule an inspection using the automated inspection line. 11. To schedule inspections, check permit status, or to make payments on the City website, please visit https://secure.cityofpuyallup.org/ Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.