CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20220840


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20220840
Commercial - Tenant Improvement/Remodel
Closed
MULTICARE HEALTH SYSTEM
Alteration/Remodel
Replacement of imaging equipment and required room finishes - CATH LAB EQUIPMENT UPGRADE
05/20/2022
09/29/2022
07/09/2023
01/10/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Planning Review VOID 06/29/2022 07/12/2022
Building Review Approved 06/29/2022 06/28/2022
Fire Review Approved 06/29/2022 06/26/2022
Engineering Review Approved 06/29/2022 06/23/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 09/29/2022
Building Permit Fee $2,740.95 $2,740.95 Paid 09/29/2022
Plumbing Fixtures Fee $13.00 $13.00 Paid 09/29/2022
Plumbing Permit Fee $40.00 $40.00 Paid 09/29/2022
Building Plan Review Fee $1,781.62 $1,781.62 Paid 06/09/2022
Plumbing Plan Review Fee $34.45 $34.45 Paid 06/09/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 09/29/2022
Sewer System Development ChargeFee - Tenant Improvment/Addition $789.26 $789.26 Paid 09/29/2022
Inspection Fee - Outside Of Business Hours $390.00 $390.00 Paid 11/10/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Hydronic Piping Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Exit Lighting Test Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Frame Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Fire Final Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 01/10/2023
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)
Medical Gas Inspection VOID 01/10/2023
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: 1.Separate permits are required for fire alarm and sprinkler system work. 2. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Engineering Commercial Standard Conditions Open Development & Permitting Services Standard Conditions
: Development Engineering standard commercial conditions: - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
05/23/2022 Letter Incomplete Application Notice
05/24/2022 Letter Incomplete Application Notice
06/09/2022 Receipt Receipt for transaction:2022-001073
07/13/2022 Form Building Permit Application 2020_202002121333134838_1 (Flattened)
07/13/2022 Plans MHS GSH Cath Lab 1 upgrade Permit Set (Stamped)
07/13/2022 Form Plumbing fixture worksheet_202012021825172385 (Stamped)
09/29/2022 Letter Permit - Detailed
09/29/2022 Receipt Receipt for transaction:2022-001934
11/10/2022 Receipt Receipt for transaction:2022-002248
11/14/2022 Report Inspection Report (Plumbing Rough In Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.