Summary

PRCTI20221484
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
MACYS:INTERIOR TI ON 1ST FLOOR, DEMO OF NON-STRUCTURAL ELEMENTS, CONSTRUCTION OF NON-LOADBEARING PARTITIONS, AND MODIFICATIONS TO AFFECTED CEILINGS. NO CHANGE TO BUILDING ENVELOPE. BLDG/MECH ONLY 03/09/2023 - REVISION (1) ADD PARTITION AT EXISTING MEZZANINE
09/28/2022
02/06/2023
11/26/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 03/23/2023 03/22/2023
Fire Review VOID 11/19/2022 11/21/2022
Planning Review Approved 11/19/2022 11/17/2022
Building Review Approved 11/19/2022 11/16/2022
Engineering Review Approved 11/19/2022 11/14/2022
Engineering Traffic Review VOID 11/19/2022 11/09/2022
Fire Review Approved 11/01/2022 11/03/2022
Building Review Failed 11/01/2022 11/01/2022
Engineering Review Approved 11/01/2022 10/26/2022
Planning Review Approved 11/01/2022 10/21/2022
Engineering Traffic Review VOID 11/01/2022 10/13/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/06/2023
Mechanical Duct Work Fee $14.10 $14.10 Paid 02/06/2023
Building Permit Fee $1,273.75 $1,273.75 Paid 02/06/2023
Mechanical Permit Fee $40.00 $40.00 Paid 02/06/2023
Building Plan Review Fee $827.94 $827.94 Paid 10/12/2022
Mechanical Plan Review Fee $35.17 $35.17 Paid 10/12/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/06/2023
Resubmittal Fee $130.00 $130.00 Paid 11/09/2022
Resubmittal Fee $130.00 $130.00 Paid 03/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Not Ready 3/2/2023 3/2/2023 03/02/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/02/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Mechanical Final Inspection Not Ready 3/2/2023 3/2/2023 03/02/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/02/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Frame Inspection Not Ready 3/15/2023 3/15/2023 03/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/15/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Carried Forward
03/15/2023
1 ; provide complete set of City approved plans with revision for added framing as discussed with contractor. not ready

Mechanical Final Inspection Not Ready 3/15/2023 3/15/2023 03/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/15/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Carried Forward
03/15/2023
1 ; complete mechanical rough-in as discussed with contractor.

Ceiling Grid/T-Bar Inspection Not Ready 3/15/2023 3/15/2023 03/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/15/2023
1 ; complete all ceiling grid requirements as per city approved plans,

Frame Inspection Partial Pass 3/16/2023 3/16/2023 03/16/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/16/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Carried Forward
03/16/2023
1 ; provide complete set of City approved plans with revision for added framing as discussed with contractor. not ready

Ceiling Grid/T-Bar Inspection Partial Pass 3/24/2023 3/24/2023 03/24/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/24/2023
1 ; complete all ceiling grid requirements as per city approved plans,

Other/Miscellaneous
Carried Forward
03/24/2023
1. approved for cover in area covered up with out inspections only

Mechanical Final Inspection Not Ready 3/28/2023 3/28/2023 03/28/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/28/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Carried Forward
03/28/2023
1 ; complete mechanical rough-in as discussed with contractor.

Frame Inspection Not Ready 3/28/2023 3/28/2023 03/28/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/28/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Carried Forward
03/28/2023
1 ; provide complete set of City approved plans with revision for added framing as discussed with contractor. not ready

Mechanical Final Inspection Partial Pass 3/29/2023 3/29/2023 03/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
03/29/2023
1 ; complete all framing. mechanical rough-in,& electrical cover approval from L&I prior to next frame inspection. ( not ready)

Other/Miscellaneous
Resolved
03/29/2023
1 ; complete mechanical rough-in as discussed with contractor.

Mechanical Final Inspection Not Ready 4/7/2023 4/7/2023 04/07/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/07/2023
1. cancelled by contractor

Ceiling Grid/T-Bar Inspection Not Ready 4/7/2023 4/7/2023 04/07/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/07/2023
1 ; complete all ceiling grid requirements as per city approved plans,

Other/Miscellaneous
Carried Forward
04/07/2023
1. approved for cover in area covered up with out inspections only

Other/Miscellaneous
Carried Forward
04/07/2023
1. cancelled by contractor

Mechanical Final Inspection Not Ready 4/12/2023 4/12/2023 04/12/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/12/2023
1. cancelled by contractor

Other/Miscellaneous
Carried Forward
04/12/2023
1.complete mono coat as discussed with contractor 2. complete drywall penetration's as discussed with contractor 3. not ready

Ceiling Grid/T-Bar Inspection Not Ready 4/12/2023 4/12/2023 04/12/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/12/2023
1 ; complete all ceiling grid requirements as per city approved plans,

Other/Miscellaneous
Carried Forward
04/12/2023
1. approved for cover in area covered up with out inspections only

Other/Miscellaneous
Carried Forward
04/12/2023
1. cancelled by contractor

Other/Miscellaneous
Carried Forward
04/12/2023
1. complete perimeter wires as discussed with contractor 2. provide tie wires at all wires that exceed 1 and 6 3. provide positive attachment at light fixtures as discussed with contractor 4 complete drywall at wall in shoe storage area as per city approved plans 5.not ready

Ceiling Grid/T-Bar Inspection Failed 4/26/2023 4/26/2023 04/26/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2023
1 ; complete all ceiling grid requirements as per city approved plans,

Other/Miscellaneous
Resolved
04/26/2023
1. approved for cover in area covered up with out inspections only

Other/Miscellaneous
Resolved
04/26/2023
1. cancelled by contractor

Other/Miscellaneous
Carried Forward
04/26/2023
1. complete perimeter wires as discussed with contractor 2. provide tie wires at all wires that exceed 1 and 6 3. provide positive attachment at light fixtures as discussed with contractor 4 complete drywall at wall in shoe storage area as per city approved plans 5.not ready

Other/Miscellaneous
Carried Forward
04/26/2023
1. complete perimeter wires as discussed with contractor 2. provide tie wires at all wires that exceed 1 and 6 3. provide positive attachment at light fixtures as discussed with contractor 4 complete drywall at wall in shoe storage area as per city approved plans 5.not ready

Mechanical Final Inspection Not Ready 4/26/2023 4/26/2023 04/26/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2023
1. cancelled by contractor

Other/Miscellaneous
Carried Forward
04/26/2023
1.complete mono coat as discussed with contractor 2. complete drywall penetration's as discussed with contractor 3. not ready

Other/Miscellaneous
Carried Forward
04/26/2023
1.complete mono coat as discussed with contractor 2. complete drywall penetration's as discussed with contractor 3. not ready

Fire Or Smoke Damper Inspection VOID 5/16/2023 5/17/2023 05/17/2023
David Drake ((253) 864-4171)
Building Final Inspection Not Ready 5/19/2023 5/19/2023 05/19/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/19/2023
1. complete guard rail at mezzanine as discussed with contractor 2.provide duct report at time of next inspection 3. not ready

Building Final Inspection Failed 5/25/2023 5/25/2023 05/25/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/25/2023
1. complete guard rail at mezzanine as discussed with contractor 2.provide duct report at time of next inspection 3. not ready

Other/Miscellaneous
Carried Forward
05/25/2023
1. complete min. 42'' guard rail at mezzanine as discussed with contractor.

Erosion And Sediment Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Comment Building Div Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Comment Engineering Div Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Footing/Setback Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Underfloor Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Slab/Insulation Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Block Wall Rebar Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Shear Wall Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Firewall/Firestop Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Re-Roof Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Refrigeration Line Test Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Exhaust/Vent Fans Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Cover Inspection/Thrust Blocks Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Hydrostatic Test 200Lbs 2Hrs VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Emergency Radio Test Review Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Engineering Final Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Floodproof Certification Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Elevation Verification Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Planning Final Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Mechanical Final Inspection VOID 05/30/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
04/26/2023
1. cancelled by contractor

Other/Miscellaneous
Outstanding
04/26/2023
1.complete mono coat as discussed with contractor 2. complete drywall penetration's as discussed with contractor 3. not ready

Other/Miscellaneous
Outstanding
04/26/2023
1.complete mono coat as discussed with contractor 2. complete drywall penetration's as discussed with contractor 3. not ready

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
09/28/2022 Other Macys Puyallup - Owner Leter 62-985 Stockroom Expansion Review Ltr
09/28/2022 Form W/A
11/21/2022 Plans Construction Plan Set - Dock Alt_rev1 (Stamped)
11/04/2022 Form Macys Puyallup - Building Permit App1 (Flattened)
09/30/2022 Letter Incomplete Application Notice
10/12/2022 Receipt Receipt for transaction:2022-002031
11/04/2022 Letter Permit Review Comment Notice
11/09/2022 Other ltr_PRCTI20221484_response - 2022-11-07
11/21/2022 Form PRCTI20221484 - Revisions to Existing Residential or Commercial Applications (Flattened)
11/09/2022 Receipt Receipt for transaction:2022-002234
02/06/2023 Letter Permit - Detailed
02/06/2023 Receipt Receipt for transaction:2023-000176
03/02/2023 Report Inspection Report (Frame Inspection)
03/02/2023 Report Inspection Report (Mechanical Final Inspection)
03/27/2023 Form PRCTI20221484 - Revisions to Existing Residential or Commercial Applications (Flattened)
03/27/2023 Plans 2023-03-07 - Macys Puyallup - Dock Alt_rev2 (Stamped)
03/09/2023 Receipt Receipt for transaction:2023-000375
03/15/2023 Report Inspection Report (Frame Inspection)
03/15/2023 Report Inspection Report (Mechanical Final Inspection)
03/16/2023 Report Inspection Report (Frame Inspection)
03/24/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
03/28/2023 Report Inspection Report (Mechanical Final Inspection)
03/28/2023 Report Inspection Report (Frame Inspection)
03/29/2023 Report Inspection Report (Frame Inspection)
03/29/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
03/29/2023 Report Inspection Report (Mechanical Final Inspection)
03/31/2023 Report Inspection Report (Wallboard / Drywall Inspection)
04/07/2023 Report Inspection Report (Mechanical Final Inspection)
04/07/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
04/12/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
04/26/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
04/26/2023 Report Inspection Report (Mechanical Final Inspection)
05/02/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/17/2023 Report Inspection Report (Fire Final Inspection)
05/19/2023 Report Inspection Report (Building Final Inspection)
05/30/2023 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.