Summary

PRCTI20221802
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
Mercantile
TI - remodel of (E) retail space including doors, partitions, ceilings, lighting fixtures, etc - (Occupant load of 68) - BATH & BODY WORKS * REVISION (1) - 04/06/2023 - MINOR BLDG REVISIONS, ANCHORING CHANGES
11/22/2022
02/02/2023
11/28/2023

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
04/12/2023 00116082REV2summary (Flattened)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 04/20/2023 04/12/2023
Planning Review VOID 04/20/2023 04/06/2023
Fire Review VOID 04/20/2023 04/06/2023
Engineering Traffic Review VOID 04/20/2023 04/06/2023
Building Review Approved 01/31/2023 01/31/2023
Engineering Review Approved 01/31/2023 01/25/2023
Planning Review VOID 01/31/2023 01/24/2023
Fire Review Approved 01/31/2023 01/24/2023
Engineering Traffic Review VOID 01/31/2023 01/12/2023
Fire Review Approved 12/12/2022 12/12/2022
Building Review Failed 12/12/2022 12/12/2022
Planning Review VOID 12/12/2022 12/02/2022
Engineering Review Approved 12/12/2022 11/28/2022
Engineering Traffic Review VOID 12/12/2022 11/23/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/01/2023
Air Handling Unit (Up to 10,000 cfm) Fee $14.10 $14.10 Paid 02/01/2023
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $58.20 $58.20 Paid 02/01/2023
Exhaust Vent Fan (Bath) Fee $14.10 $14.10 Paid 02/01/2023
Mechanical Duct Work Fee $14.10 $14.10 Paid 02/01/2023
Building Permit Fee $2,102.55 $2,102.55 Paid 02/01/2023
Mechanical Permit Fee $40.00 $40.00 Paid 02/01/2023
Plumbing Fixtures Fee $78.00 $78.00 Paid 02/01/2023
Plumbing Permit Fee $40.00 $40.00 Paid 02/01/2023
Water Heater Fee $13.00 $13.00 Paid 02/01/2023
Building Plan Review Fee $1,366.66 $1,366.66 Paid 11/22/2022
Mechanical Plan Review Fee $91.33 $91.33 Paid 11/22/2022
Plumbing Plan Review Fee $85.15 $85.15 Paid 11/22/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/01/2023
Resubmittal Fee $130.00 $130.00 Paid 01/11/2023
Resubmittal Fee $180.00 $180.00 Paid 04/06/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Mechanical Rough In Inspection Partial Pass 3/3/2023 3/3/2023 03/03/2023
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Passed w/ Conditions 3/7/2023 3/7/2023 03/07/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/07/2023
1 ; provide as-built plumbing plans to owner of building prior to building final.

Foundation/Rebar Inspection Partial Pass 3/9/2023 3/9/2023 03/09/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 3/9/2023 3/9/2023 03/09/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/09/2023
1 ; complete all framing, plumbing rough-in with plumbing on test, electrical cover approval at time of frame inspection. not ready

Frame Inspection Partial Pass 3/17/2023 3/17/2023 03/17/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
03/17/2023
1 ; complete all framing, plumbing rough-in with plumbing on test, electrical cover approval at time of frame inspection. not ready

Other/Miscellaneous
Carried Forward
03/17/2023
1. complete angle braces at soffits per city approved plans 2.complete rated door with lintel at cmu wall 3.OK TO DRYWALL WALLS ONLY no lids or soffits

Wallboard / Drywall Inspection Partial Pass 3/21/2023 3/21/2023 03/21/2023
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/23/2023 3/23/2023 03/23/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
03/23/2023
1. complete angle braces at soffits per city approved plans 2.complete rated door with lintel at cmu wall 3.OK TO DRYWALL WALLS ONLY no lids or soffits

Other/Miscellaneous
Carried Forward
03/23/2023
1. complete angle braces at soffits per city approved plans,

Mechanical Rough In Inspection Partial Pass 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 4/4/2023 4/4/2023 04/04/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/04/2023
1. complete angle braces at soffits per city approved plans,

Other/Miscellaneous
Carried Forward
04/04/2023
1.complete framing of ceiling per city approved plans 2.not ready

Ceiling Grid/T-Bar Inspection Not Ready 4/5/2023 4/5/2023 04/05/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/05/2023
1. complete ceiling per city approved plans 2. not ready

Frame Inspection Passed w/ Conditions 4/6/2023 4/6/2023 04/06/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/06/2023
1. complete angle braces at soffits per city approved plans,

Other/Miscellaneous
Resolved
04/06/2023
1.complete framing of ceiling per city approved plans 2.not ready

Other/Miscellaneous
Outstanding
04/06/2023
1. complete tie wires at seismic joint as per city approved plans 2. check at time of next inspection

Wallboard / Drywall Inspection Partial Pass 4/10/2023 4/10/2023 04/10/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Not Ready 4/11/2023 4/11/2023 04/11/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/11/2023
1. complete ceiling per city approved plans 2. not ready

Ceiling Grid/T-Bar Inspection Failed 5/4/2023 5/4/2023 05/04/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/04/2023
1. complete ceiling per city approved plans 2. not ready

Other/Miscellaneous
Carried Forward
05/04/2023
1. complete ceiling grid requirements per city approved plans as discussed with contractor. 2 ; provide fire cover approval prior to ceiling grid inspection. 3 ; not ready

Mechanical Final Inspection Not Ready 5/19/2023 5/19/2023 05/19/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/19/2023
1. cancelled on site by contractor

Planning Final Inspection VOID 5/19/2023 05/19/2023
Chris Beale ((253) 841-5418)
Plumbing Final Inspection Not Ready 5/19/2023 5/19/2023 05/19/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/19/2023
1. cancelled on site by contractor

Building Final Inspection Not Ready 5/19/2023 5/19/2023 05/19/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/19/2023
1. cancelled on site by contractor

Fire Final Inspection Failed 5/18/2023 5/18/2023 05/22/2023
David Drake ((253) 864-4171)
Fire Final
Carried Forward
05/22/2023
Fire Alarm did not pass. L&i Permit required for Fire Alarm System.

Fire Or Smoke Damper Inspection VOID 05/26/2023
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 05/26/2023
David Drake ((253) 864-4171)
Building Final Inspection Partial Pass 5/26/2023 5/26/2023 05/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
05/26/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
05/26/2023
1. clean garbage off of roof as discussed with contractor 2. provide plumbing boots at sinks as discussed with contractor 3. seal dog house at MECH on roof 4.TCO 10 working days ok to stock

Erosion And Sediment Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Underfloor Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Re-Roof Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Medical Gas Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Gas Test Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Hydronic Piping Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Elevation Verification Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Floodproof Certification Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 4/11/2023 06/01/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 06/01/2023
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • A separate permit may be required if fire alarm or sprinkler system is altered • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Fire extinguishers required per code • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Development & Permitting Services Prior to Issuance
: NEED CONFIRMATION ON CONTRACTOR/CONTRACTOR INFO -JF 2.2.23 received -jf

Related Permit & Planning Applications

Reference Number Status Type
PRSG20230085 Permit(s) Issued Sign/Awning
PRCTI20230176 Closed Commercial - Tenant Improvement/Remodel
PRFS20230192 Closed Fire Sprinklers
PRFA20230308 Closed Fire Alarms
PRMH20230472 Canceled Mechanical - COMMERCIAL ONLY
PRMH20230873 Closed Mechanical - COMMERCIAL ONLY

Documents & Images

Date Uploaded File Type Name
02/01/2023 Form Water Availability Letter (Stamped)
02/01/2023 Form Plumbing fixture worksheet (Stamped)
11/22/2022 Receipt Receipt for transaction:2022-002330
02/01/2023 Other 00116082 Structural Calculations SS (Stamped)
01/11/2023 Receipt Receipt for transaction:2023-000047
01/24/2023 Plans CONSTRUCTION PLANS WITH 12.15 MARKUPS (Flattened)
02/01/2023 Plans CONSTRUCTION PLANS (Stamped)
02/01/2023 Receipt Receipt for transaction:2023-000147
02/02/2023 Letter Permit Job Card
02/02/2023 Permit Permit - Detailed
03/03/2023 Report Inspection Report (Mechanical Rough In Inspection)
03/07/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/09/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/09/2023 Report Inspection Report (Frame Inspection)
03/17/2023 Report Inspection Report (Frame Inspection)
03/17/2023 Report Inspection Report (Plumbing Rough In Inspection)
03/21/2023 Report Inspection Report (Wallboard / Drywall Inspection)
03/23/2023 Report Inspection Report (Frame Inspection)
03/30/2023 Report Inspection Report (Mechanical Rough In Inspection)
04/04/2023 Report Inspection Report (Frame Inspection)
04/05/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
04/12/2023 Plans 00116082REV2summary (Flattened)
04/06/2023 Plans Revisions to Existing Residential or Commercial Applications (PDF)-Revision form
04/06/2023 Receipt Receipt for transaction:2023-000574
04/06/2023 Report Inspection Report (Frame Inspection)
04/10/2023 Report Inspection Report (Wallboard / Drywall Inspection)
04/11/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/04/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/08/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/19/2023 Report Inspection Report (Plumbing Final Inspection)
05/19/2023 Report Inspection Report (Mechanical Final Inspection)
05/19/2023 Report Inspection Report (Building Final Inspection)
05/22/2023 Report Inspection Report (Fire Final Inspection)
05/26/2023 Report Inspection Report (Plumbing Final Inspection)
05/26/2023 Report Inspection Report (Mechanical Final Inspection)
05/26/2023 Report Inspection Report (Building Final Inspection)
06/01/2023 Report Inspection Report (Building Final Inspection)
10/25/2023 Other Certificate of Occupancy