CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20230139
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 01/03/2024 |
| Building Permit Fee | $713.75 | $713.75 | Paid | 01/03/2024 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 01/03/2024 |
| Plumbing Fixtures Fee | $52.00 | $52.00 | Paid | 01/03/2024 |
| Building Plan Review Fee | $274.01 | $274.01 | Paid | 02/07/2023 |
| Plumbing Plan Review Fee | $59.80 | $59.80 | Paid | 02/07/2023 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 01/03/2024 |
| Building Plan Review Fee | $189.93 | $189.93 | Paid | 01/03/2024 |
|
$463.94
|
||||
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $4,250.50 | $4,250.50 | Paid | 01/03/2024 |
| Water System Development Charge Fee - Tenant Improvment/Addition | $1,922.86 | $1,922.86 | Paid | 01/03/2024 |
| Resubmittal/Revision Fee | $130.00 | $130.00 | Paid | 03/23/2023 |
| Building Division Fee (Hourly) | $540.00 | $540.00 | Paid | 07/24/2024 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $8,462.85 | $8,462.85 | $0.00 | |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Not Ready | 2/8/2024 | 2/8/2024 | 02/08/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/08/2024
1:talked about plan changes and frame requirments
|
||||
| Plumbing Rough In Inspection | Partial Pass | 2/8/2024 | 2/8/2024 | 02/08/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/08/2024
below slab plumbing approved to include interceptor.
|
||||
| Slab/Insulation Inspection | Passed | 2/13/2024 | 2/13/2024 | 02/13/2024 |
| Monty Johnson ((253) 770-3326) | ||||
| Plumbing Rough In Inspection | Partial Pass | 3/7/2024 | 3/7/2024 | 03/07/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/07/2024
1:supply ok
2:provide test on dwv
|
||||
| Frame Inspection | Not Ready | 5/16/2024 | 5/16/2024 | 05/16/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
05/16/2024
1. provide test on DWV at time of next inspection
2.complete positive attachment at all single top plates as discussed with contractor
3.complete all fire stop as discussed with contractor
4. provide fastener and plates at bottom plates per city approved plans
5. complete hangers at rafters in entry as discussed with contractor
6.complete duct seal
7. remove insulation from mechanical in attic to verify sealing of ducts
8.complete all seismic bracing on duct work
9.not a complete list
|
||||
| Frame Inspection | Passed | 5/22/2024 | 5/22/2024 | 05/22/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
05/22/2024
1. provide test on DWV at time of next inspection
2.complete positive attachment at all single top plates as discussed with contractor
3.complete all fire stop as discussed with contractor
4. provide fastener and plates at bottom plates per city approved plans
5. complete hangers at rafters in entry as discussed with contractor
6.complete duct seal
7. remove insulation from mechanical in attic to verify sealing of ducts
8.complete all seismic bracing on duct work
9.not a complete list
|
||||
| Energy (Insulation) Inspection | Passed | 5/29/2024 | 5/29/2024 | 05/29/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
| Comment Building Div Inspection | Partial Pass | 5/30/2024 | 5/30/2024 | 05/30/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Passed | 6/5/2024 | 6/5/2024 | 06/05/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
| Planning Final Inspection | VOID | 07/05/2024 | ||
| Nabila Comstock ((253) 770-3361) | ||||
| Comment Building Div Inspection | Not Ready | 7/8/2024 | 7/8/2024 | 07/08/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/08/2024
1. discussed requirements for building final
|
||||
| Fire Final Inspection | Not Ready | 7/8/2024 | 7/8/2024 | 07/09/2024 |
| David Drake ((253) 864-4171) | ||||
| Erosion And Sediment Inspection | Passed | 07/09/2024 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Comment Engineering Div Inspection | Passed | 07/09/2024 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Cover Inspection/Thrust Blocks Inspection | Passed | 07/09/2024 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Comment Engineering Div Inspection | Failed | 7/9/2024 | 07/09/2024 | |
| Jeff Hill ((253) 204-5633) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/09/2024
certify RPBA's
|
||||
| Comment Engineering Div Inspection | VOID | 07/11/2024 | ||
| Jeff Hill ((253) 204-5633) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
07/09/2024
certify RPBA's
|
||||
| Engineering Final Inspection | Passed | 7/11/2024 | 07/11/2024 | |
| Jeff Hill ((253) 204-5633) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
07/11/2024
Certify RPBA's
|
||||
| Exit Lighting Test Inspection | VOID | 07/11/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Or Smoke Damper Inspection | VOID | 07/11/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Hydrostatic Test 200Lbs 2Hrs | VOID | 07/11/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Emergency Radio Test Review Inspection | VOID | 07/11/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Final Inspection | Passed w/ Conditions | 7/11/2024 | 07/11/2024 | |
| Ray Cockerham ((253) 841-5585) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/11/2024
Approved pending cleanup of the space and building final inspections.
|
||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 7/12/2024 | 7/12/2024 | 07/13/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/13/2024
date of inspection 7/12/2024
1.complete perimeter wires as discussed with contractor
2. complete tie wire at can light
3.ok to drop tiles as discussed with contractor
|
||||
| Building Final Inspection | Partial Pass | 7/12/2024 | 7/12/2024 | 07/16/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/16/2024
date of inspection 7/13/2024
1.seal line set house on roof
2.label equipment on roof for space it is servicing
3.remove debri from roof
4.provide access,service platform, service plug and light at duct heater in attic per mech code
5.provide plumbing boots at supply in storage room
6.provide and maintain clear access at corridor where bathrooms are
7.seal penetration's at mini split drain line
8.do not use ice maker untel air gap is verified or RPBA is installed and certified
9.see email from building official on back corridor future access
10. provide permanent roof access as discussed with contractor
11. pay after hours inspection fee for todays inspection prior to scheduling next inspection
12.TCO granted for 10 working days
13.all ceiling corrections approved
|
||||
| Comment Building Div Inspection | Partial Pass | 7/26/2024 | 7/26/2024 | 07/26/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/26/2024
1. discussed requirements for building final
|
||||
|
Other/Miscellaneous
Carried Forward
07/26/2024
received backflow cert for ice maker
|
||||
| Comment Building Div Inspection | Not Ready | 1/7/2025 | 1/7/2025 | 01/07/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/07/2025
1. discussed requirements for building final
|
||||
|
Other/Miscellaneous
Carried Forward
01/07/2025
talked about final requirements
|
||||
| Building Final Inspection | Passed | 1/17/2025 | 1/17/2025 | 01/17/2025 |
| Ray Cockerham ((253) 841-5585) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
01/17/2025
date of inspection 7/13/2024
1.seal line set house on roof
2.label equipment on roof for space it is servicing
3.remove debri from roof
4.provide access,service platform, service plug and light at duct heater in attic per mech code
5.provide plumbing boots at supply in storage room
6.provide and maintain clear access at corridor where bathrooms are
7.seal penetration's at mini split drain line
8.do not use ice maker untel air gap is verified or RPBA is installed and certified
9.see email from building official on back corridor future access
10. provide permanent roof access as discussed with contractor
11. pay after hours inspection fee for todays inspection prior to scheduling next inspection
12.TCO granted for 10 working days
13.all ceiling corrections approved
|
||||
| Footing/Setback Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Foundation/Rebar Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Underfloor Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Block Wall Rebar Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Roof Sheathing Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Shear Wall Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Firewall/Firestop Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Plumbing Below Slab Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Combination Frame And Rough In Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Re-Roof Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Hydronic Piping Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Refrigeration Line Test Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Exhaust Hood Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Light Test For Grease Duct Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Exhaust/Vent Fans Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Medical Gas Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Plumbing Final Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Plumbing Rough In Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Ceiling Grid/T-Bar Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
07/13/2024
date of inspection 7/12/2024
1.complete perimeter wires as discussed with contractor
2. complete tie wire at can light
3.ok to drop tiles as discussed with contractor
|
||||
| Comment Building Div Inspection | VOID | 04/02/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/07/2025
1. discussed requirements for building final
|
||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
• Comply with 2018 IFC and 2018 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• RTU’S will be required to be tested for shut down
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Building Division
CE20220037 - COMPLIANCE WILL NEED TO BE RESOLVED PRIOR TO ISSUANCE PER BLDG. OFFICIAL
|
||
| Side Sewer Sample Tee | Resolved | Prior to Issuance |
|
Engineering Division
The sampling tee requirement has bee waived by the Public Works Director, see attached email. LL 09/08/2023
A side sewer sampling connection and a new sewer cleanout cap is required to be installed on the commercial sanitary side sewer service in accordance with City policy ENG 21-03. See City Standard Detail 04.03.04.
|
||
| Miscellaneous Condition | Resolved | Prior to Occupancy |
|
Engineering Division
The sampling tee requirement has bee waived by the Public Works Director, see attached email. LL 09/08/2023
The installation of the required sewer sampling tee and cleanout cap must be competed and a final approval granted prior to occupancy.
|
||
| Engineering Commercial Standard Conditions | Resolved | Standard Conditions |
|
Engineering Division
Development Engineering standard commercial conditions:
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Traffic Division
N/A
|
||
| Backflow Protection Device - Commercial RPBA | Resolved | Prior to Completion |
|
Development & Permitting Services
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView