CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20230247


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20230247
Commercial - Tenant Improvement/Remodel
Closed
SOUND PROPERTIES LLC
Alteration/Remodel
TI PREVISOUS EXISTING BLDG OF DMV ~ ENTERPRISE RENT-A-CAR * REV (1) - 11/8/2023 - REVISED LOCATION OF ADA RAMP & STRIPPING TO HC STALL
02/27/2023
09/07/2023
08/18/2024
02/02/2024

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
11/17/2023 SITE PLAN (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 11/27/2023 11/16/2023
Fire Review Approved 11/27/2023 11/15/2023
Planning Review Approved 11/27/2023 11/13/2023
Engineering Review Approved 11/27/2023 11/08/2023
Building Review Approved 08/02/2023 08/01/2023
Fire Review Approved 08/02/2023 08/01/2023
Planning Review Approved 08/02/2023 08/01/2023
Engineering Review Approved 08/02/2023 07/25/2023
Planning Review Failed 04/04/2023 04/20/2023
Building Review Failed 04/04/2023 04/06/2023
Fire Review Approved 04/04/2023 04/05/2023
Engineering Review Failed 04/04/2023 03/15/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 08/04/2023
Building Permit Fee $1,553.75 $1,553.75 Paid 08/04/2023
Mechanical Permit Fee $40.00 $40.00 Paid 08/04/2023
Plumbing Permit Fee $40.00 $40.00 Paid 08/04/2023
Building Plan Review Fee $1,009.94 $1,009.94 Paid 03/07/2023
Mechanical Plan Review Fee $59.93 $59.93 Paid 03/07/2023
Plumbing Plan Review Fee $26.00 $26.00 Paid 03/07/2023
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 08/04/2023
Exhaust Vent Fan (Bath) Fee $28.20 $28.20 Paid 08/04/2023
Mechanical Duct Work Fee $24.00 $24.00 Paid 08/04/2023
Resubmittal Fee $180.00 $180.00 Paid 07/17/2023
Resubmittal Fee $180.00 $180.00 Paid 12/03/2023
Building Re-Inspection Fee $180.00 $180.00 Paid 12/03/2023
Inspection Fee - Outside Of Business Hours $360.00 $360.00 Paid 01/18/2024
Building Re-Inspection Fee $180.00 $180.00 Paid 01/26/2024
Building Inspection Fee $360.00 $360.00 Paid 01/26/2024
Building Division Fee (Hourly) $180.00 $180.00 Paid 01/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Not Ready 10/3/2023 10/3/2023 10/04/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. cancelled on site by contractor

Plumbing Rough In Inspection Partial Pass 10/3/2023 10/3/2023 10/04/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Plumbing Rough In Inspection Failed 10/13/2023 10/13/2023 10/13/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Other/Miscellaneous
Resolved
02/05/2024
provide 10 ft head test. have engineering dept approval on interceptor

Foundation/Rebar Inspection Partial Pass 10/17/2023 10/17/2023 10/17/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. bar at footing approved pending letter from EOR not requiring special inspection 2. complete vapor barrier at slab infill's as discussed with contractor

Plumbing Rough In Inspection Partial Pass 10/17/2023 10/17/2023 10/17/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Other/Miscellaneous
Resolved
02/05/2024
1. trench drains under slab approved inside building 2. provide approval from engineering for outside the building

Footing/Setback Inspection Partial Pass 10/20/2023 10/20/2023 10/20/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. cancelled on site by contractor

Other/Miscellaneous
Resolved
02/05/2024
thickened edge footing south wall ok

Foundation/Rebar Inspection Not Ready 10/20/2023 10/20/2023 10/20/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. bar at footing approved pending letter from EOR not requiring special inspection 2. complete vapor barrier at slab infill's as discussed with contractor

Comment Engineering Div Inspection Partial Pass 10/30/2023 10/30/2023
Jeff Hill ((253) 204-5633)
Combination Frame And Rough In Inspection Not Ready 10/30/2023 10/30/2023 10/30/2023
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection Not Ready 10/30/2023 10/30/2023 10/30/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. bar at footing approved pending letter from EOR not requiring special inspection 2. complete vapor barrier at slab infill's as discussed with contractor

Frame Inspection Not Ready 10/31/2023 10/31/2023 11/01/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1.provide attachment details for demising wall as discussed with contractor 2. complete all framing requirements as discussed with contractor prior to next inspection 3.not ready

Plumbing Rough In Inspection Not Ready 11/8/2023 11/8/2023 11/08/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Other/Miscellaneous
Resolved
02/05/2024
1. trench drains under slab approved inside building 2. provide approval from engineering for outside the building

Other/Miscellaneous
Resolved
02/05/2024
1. NO ONE ON SITE AT TIME OF INSPECTION 10:55 AM

Plumbing Rough In Inspection Not Ready 11/13/2023 11/13/2023 11/13/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Other/Miscellaneous
Resolved
02/05/2024
1. trench drains under slab approved inside building 2. provide approval from engineering for outside the building

Other/Miscellaneous
Resolved
02/05/2024
1. NO ONE ON SITE AT TIME OF INSPECTION 10:55 AM

Other/Miscellaneous
Resolved
02/05/2024
1. provide test on dwv as discussed with contractor 2.provide city approved plans on site at time of next inspection

Combination Frame And Rough In Inspection Not Ready 11/13/2023 11/13/2023 11/13/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete all requirements for framing inspection as discussed with contractor 2, not ready

Energy (Insulation) Inspection Failed 11/22/2023 11/22/2023 11/22/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
unable to find frame approval

Mechanical Rough In Inspection Partial Pass 11/22/2023 11/22/2023 11/22/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
exhaust fans in bathrooms ok

Combination Frame And Rough In Inspection Failed 11/22/2023 11/22/2023 11/22/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete all requirements for framing inspection as discussed with contractor 2, not ready

Other/Miscellaneous
Resolved
02/05/2024
most walls insulated, no test on dwv, not ready

Fire Or Smoke Damper Inspection Not Ready 11/28/2023 11/28/2023 11/28/2023
David Drake ((253) 864-4171)
Combination Frame And Rough In Inspection Not Ready 11/27/2023 11/27/2023 11/28/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete all requirements for framing inspection as discussed with contractor 2, not ready

Other/Miscellaneous
Resolved
02/05/2024
1.provide fire blocking at ceiling in bathroom as discussed with contractor 2. complete duct work on mech system 3.complete duct seal 4. remove insulation from ducts to verify duct seal as discussed with contractor 5. provide clarification from MECH engineer of record on duct supports from ceiling to include seismic restraint 6.provide fire cover approval at time of next framing inspection 7. plumbing approved 8.due not insulate

Foundation/Rebar Inspection Not Ready 11/28/2023 11/28/2023 11/28/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
11/28/2023
1. bar at footing approved pending letter from EOR not requiring special inspection 2. complete vapor barrier at slab infill's as discussed with contractor

Other/Miscellaneous
Resolved
02/05/2024
1. provide all special inspection reports pertaining to wall at time of next inspection as discussed with contractor

Energy (Insulation) Inspection Failed 11/30/2023 11/30/2023 11/30/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete insulation at corners as discussed with contractor 2.complete insulation at hot water lines as discussed with contractor 3.complete duct work above bathrooms as discussed with contractor

Mechanical Rough In Inspection Failed 12/1/2023 12/1/2023 12/01/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete items from previous list

Energy (Insulation) Inspection Failed with Fee 12/1/2023 12/1/2023 12/01/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete insulation at corners as discussed with contractor 2.complete insulation at hot water lines as discussed with contractor 3.complete duct work above bathrooms as discussed with contractor

Other/Miscellaneous
Resolved
02/05/2024
1. compete items from previous list 2. pay 180.00 reinspection fee prior to scheduling next inspection

Mechanical Rough In Inspection Not Ready 12/5/2023 12/5/2023 12/05/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete items from previous list

Other/Miscellaneous
Resolved
02/05/2024
1. complete items from previous list as discussed with contractor

Energy (Insulation) Inspection Passed 12/5/2023 12/5/2023 12/05/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
12/01/2023
1. complete insulation at corners as discussed with contractor 2.complete insulation at hot water lines as discussed with contractor 3.complete duct work above bathrooms as discussed with contractor

Other/Miscellaneous
Resolved
12/05/2023
1. compete items from previous list 2. pay 180.00 reinspection fee prior to scheduling next inspection

Wallboard / Drywall Inspection Passed 12/11/2023 12/11/2023 12/11/2023
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Passed 12/12/2023 12/12/2023 12/12/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
12/12/2023
1. complete items from previous list

Other/Miscellaneous
Resolved
12/12/2023
1. complete items from previous list as discussed with contractor

Frame Inspection Passed 12/21/2023 12/21/2023 12/21/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
11/01/2023
1.provide attachment details for demising wall as discussed with contractor 2. complete all framing requirements as discussed with contractor prior to next inspection 3.not ready

Ceiling Grid/T-Bar Inspection Not Ready 1/3/2024 1/3/2024 01/03/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1.complete all ceiling requirements as discussed with contractor 2.not ready

Shear Wall Inspection Not Ready 1/9/2024 1/9/2024 01/09/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1.provide special inspection reports for welding and bolting at southwest corner of building as discussed with contractor

Ceiling Grid/T-Bar Inspection Failed 1/18/2024 1/18/2024 01/18/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/18/2024
1.complete all ceiling requirements as discussed with contractor 2.not ready

Other/Miscellaneous
Resolved
02/05/2024
1. provide birc clips at floating sides of ceiling as discussed with contractor 2.provide positive connection at diffusers 3. provide positive connection of perimeter wires that attach to wall 4. complete 3 turns at wire attachment at lights

Ceiling Grid/T-Bar Inspection Passed 1/22/2024 01/22/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/22/2024
1. provide birc clips at floating sides of ceiling as discussed with contractor 2.provide positive connection at diffusers 3. provide positive connection of perimeter wires that attach to wall 4. complete 3 turns at wire attachment at lights

Cover Inspection/Thrust Blocks Inspection VOID 01/22/2024
Jeff Hill ((253) 204-5633)
Comment Engineering Div Inspection Failed 1/22/2024 01/22/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/22/2024
Remove and replace the new wheelchair ramp to current ADA standards.

Exit Lighting Test Inspection Not Ready 1/24/2024 01/24/2024
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 01/24/2024
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 01/24/2024
David Drake ((253) 864-4171)
Fire Final Inspection Not Ready 1/24/2024 1/24/2024 01/24/2024
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection Not Ready 1/24/2024 1/24/2024 01/24/2024
David Drake ((253) 864-4171)
Exit Lighting Test Inspection Failed 1/25/2024 1/25/2024 01/25/2024
David Drake ((253) 864-4171)
Corrections:


Exit Light Test
Carried Forward
01/25/2024
Contractor to provide light meter to determine appropriate amount of emergency lighting needed in bays.

Fire Or Smoke Damper Inspection Not Ready 1/25/2024 1/25/2024 01/25/2024
David Drake ((253) 864-4171)
Fire Final Inspection Failed 1/25/2024 1/25/2024 01/25/2024
David Drake ((253) 864-4171)
Corrections:


Fire Final
Carried Forward
01/25/2024
1. Provide emergency lighting in garage bays. 2. NO/CO Test required prior to occupancy.

Plumbing Final Inspection Failed 1/25/2024 1/25/2024 01/25/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
01/25/2024
1. complete boots at plumbing valves in bath rooms 2.secure wires under sinks as discussed with contractor

Fire Final Inspection Failed with Fee 1/26/2024 01/26/2024
David Drake ((253) 864-4171)
Corrections:


Fire Final
Resolved
01/30/2024
1. Provide emergency lighting in garage bays. 2. NO/CO Test required prior to occupancy.

Fire Final Inspection Passed 1/26/2024 01/26/2024
David Drake ((253) 864-4171)
Corrections:


Fire Final
Resolved
01/30/2024
1. Provide emergency lighting in garage bays. 2. NO/CO Test required prior to occupancy.

Fire Or Smoke Damper Inspection Passed 1/26/2024 01/26/2024
David Drake ((253) 864-4171)
Exit Lighting Test Inspection Passed 1/26/2024 01/26/2024
David Drake ((253) 864-4171)
Corrections:


Exit Light Test
Resolved
01/26/2024
Contractor to provide light meter to determine appropriate amount of emergency lighting needed in bays.

Fire Or Smoke Damper Inspection Failed with Fee 1/26/2024 01/26/2024
David Drake ((253) 864-4171)
Plumbing Final Inspection Not Ready 1/26/2024 1/26/2024 01/26/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete boots at plumbing valves in bath rooms 2.secure wires under sinks as discussed with contractor

Other/Miscellaneous
Resolved
02/05/2024
1. talked about access at sink area at break area 2. this was a comment inspection

Comment Engineering Div Inspection Passed 01/26/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Resolved
01/26/2024
Remove and replace the new wheelchair ramp to current ADA standards.

Building Final Inspection Not Ready 1/29/2024 1/29/2024 01/29/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1.cancelled on site per contractor

Fire Final Inspection VOID 01/30/2024
David Drake ((253) 864-4171)
Engineering Final Inspection Passed 2/2/2024 01/30/2024
Robyn Buck ((253) 435-3617)
Building Final Inspection Failed 1/30/2024 1/30/2024 01/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/30/2024
1.cancelled on site per contractor

Other/Miscellaneous
Resolved
02/05/2024
LIFE SAFETY 1. complete install of garage roll-up door west side of building 2.provide landing at back door that does not exceed 2% 3. complete grab bars in employee bathroom 4. complete door hardware at offices 5.complete ada signage at parking stall as per city approved plans NON LIFE SAFETY 1.insulate main water line in unconditioned space 2.complete vapor barrier at ceiling in storage room 3.provide balance report 4. complete grill in ceiling in employee bathroom 5.complete threshold and door seal at employee bathroom 6.provide occupancy signage at front door 7. complete awnings at west side of building

Building Final Inspection Partial Pass 1/31/2024 1/31/2024 01/31/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/31/2024
LIFE SAFETY 1. complete install of garage roll-up door west side of building 2.provide landing at back door that does not exceed 2% 3. complete grab bars in employee bathroom 4. complete door hardware at offices 5.complete ada signage at parking stall as per city approved plans NON LIFE SAFETY 1.insulate main water line in unconditioned space 2.complete vapor barrier at ceiling in storage room 3.provide balance report 4. complete grill in ceiling in employee bathroom 5.complete threshold and door seal at employee bathroom 6.provide occupancy signage at front door 7. complete awnings at west side of building

Other/Miscellaneous
Resolved
02/05/2024
1.provide balance report 2.complete grill in employee bathroom 3.complete awnings on west and north side of building 4. TCO approved from today's date 10 working day's

Building Final Inspection Passed 2/1/2024 2/1/2024 02/02/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/02/2024
1.provide balance report 2.complete grill in employee bathroom 3.complete awnings on west and north side of building 4. TCO approved from today's date 10 working day's

Comment Building Div Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Slab/Insulation Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Roof Sheathing Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Firewall/Firestop Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Hydronic Piping Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Refrigeration Line Test Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Exhaust Hood Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Light Test For Grease Duct Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Exhaust/Vent Fans Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Medical Gas Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Planning Final Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Mechanical Final Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Footing/Setback Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
10/20/2023
1. cancelled on site by contractor

Plumbing Rough In Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
11/13/2023
1. no lines or floor drains installed at time of inspection that go in to grease interceptor 2.provide AS-built approval of under ground plumbing from EOR at time of slab inspection 3. DWV under slab approved pending as-built approval from EOR

Other/Miscellaneous
Outstanding
11/13/2023
1. trench drains under slab approved inside building 2. provide approval from engineering for outside the building

Other/Miscellaneous
Outstanding
11/13/2023
1. NO ONE ON SITE AT TIME OF INSPECTION 10:55 AM

Other/Miscellaneous
Outstanding
11/13/2023
1. provide test on dwv as discussed with contractor 2.provide city approved plans on site at time of next inspection

Combination Frame And Rough In Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
11/28/2023
1. complete all requirements for framing inspection as discussed with contractor 2, not ready

Other/Miscellaneous
Outstanding
11/28/2023
1.provide fire blocking at ceiling in bathroom as discussed with contractor 2. complete duct work on mech system 3.complete duct seal 4. remove insulation from ducts to verify duct seal as discussed with contractor 5. provide clarification from MECH engineer of record on duct supports from ceiling to include seismic restraint 6.provide fire cover approval at time of next framing inspection 7. plumbing approved 8.due not insulate

Foundation/Rebar Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
11/28/2023
1. provide all special inspection reports pertaining to wall at time of next inspection as discussed with contractor

Shear Wall Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
01/09/2024
1.provide special inspection reports for welding and bolting at southwest corner of building as discussed with contractor

Plumbing Final Inspection VOID 02/05/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
02/05/2024
1. complete boots at plumbing valves in bath rooms 2.secure wires under sinks as discussed with contractor

Other/Miscellaneous
Resolved
02/05/2024
1. talked about access at sink area at break area 2. this was a comment inspection

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCP20230248 has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCP20230248 for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
Miscellaneous Condition Open Prior to Occupancy
Engineering Division
All work associated with civil permit PRCCP20230248 must be completed and a final approval given. Including, but not limited to a sewer sampling tee and a RPBA backflow protection. LL 07/25/2023
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Civil permit PRCCP20230248 must be issued prior to this permit issued CIVIL PERMIT HAS BEEN ISSUED [Robyn Buck @ 09/07/2023 10:06 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20230248 Closed Civil Construction Permit
PRFS20231452 Closed Fire Sprinklers
PRSG20231517 Closed Sign/Awning
PLPRE20220043 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
03/07/2023 Receipt Receipt for transaction:2023-000361
07/17/2023 Receipt Receipt for transaction:2023-001352
08/02/2023 Plans Plan Set (Stamped)
08/02/2023 Other Mech Plan Set (Stamped)
08/02/2023 Other Plumb Plan Set(Stamped)
08/02/2023 Plans Structural Plan Set (Stamped)
08/02/2023 Other WSEC NREC (Stamped)
08/02/2023 Form WSEC (Stamped)
08/02/2023 Other WSEC Mech (Stamped)
08/03/2023 Form Plumbing Fixture Worksheet (Stamped)
08/04/2023 Receipt Receipt for transaction:2023-001502
09/07/2023 Report STRUCTURAL CALCS (Stamped)
09/20/2023 Permit Permit - Detailed
09/20/2023 Letter Permit Job Card
10/04/2023 Report Inspection Report (Footing/Setback Inspection)
10/04/2023 Report Inspection Report (Plumbing Rough In Inspection)
10/17/2023 New detail for slab tie in
10/17/2023 Report Inspection Report (Foundation/Rebar Inspection)
10/17/2023 Report Inspection Report (Plumbing Rough In Inspection)
10/30/2023 Report Inspection Report (Foundation/Rebar Inspection)
11/01/2023 Report Inspection Report (Frame Inspection)
11/08/2023 Plans CORRECTION RESPONSE LETTER
11/08/2023 Report Inspection Report (Plumbing Rough In Inspection)
11/13/2023 Report Inspection Report (Plumbing Rough In Inspection)
11/13/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
11/17/2023 Plans SITE PLAN (Stamped)
11/28/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
11/28/2023 Report Inspection Report (Foundation/Rebar Inspection)
11/30/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/01/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/01/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/03/2023 Receipt Receipt for transaction:2023-002280
12/05/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/05/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/11/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/12/2023 Engineering letter for mechanical
12/12/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/21/2023 Report Inspection Report (Frame Inspection)
01/03/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/09/2024 Report Inspection Report (Shear Wall Inspection)
01/18/2024 Receipt Receipt for transaction:2024-000109
01/18/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/22/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/22/2024 Report Inspection Report (Comment Engineering Div Inspection)
01/25/2024 Report Inspection Report (Plumbing Final Inspection)
01/26/2024 Report Inspection Report (Plumbing Final Inspection)
01/26/2024 Receipt Receipt for transaction:2024-000151
01/26/2024 Receipt Receipt for transaction:2024-000153
01/29/2024 Receipt Receipt for transaction: 2024-000157
01/29/2024 Report Inspection Report (Building Final Inspection)
01/30/2024 Report Inspection Report (Building Final Inspection)
01/31/2024 Report Inspection Report (Building Final Inspection)
02/02/2024 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.