Permit Application Status

PRCTI20231318


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20231318
Commercial - Tenant Improvement/Remodel
Closed
CASCADE CHRISTIAN SCHOOLS
Alteration/Remodel
Cascade Christian School - Jr. High School 2nd floor tenant improvement
09/11/2023
01/22/2024
02/25/2025
08/23/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 12/01/2023 12/01/2023
Engineering Review Approved 12/01/2023 11/27/2023
Fire Review Approved 12/01/2023 11/27/2023
Planning Review Approved 12/01/2023 11/21/2023
Building Review Failed 10/11/2023 10/12/2023
Fire Review Approved 10/11/2023 10/11/2023
Planning Review Approved 10/11/2023 10/02/2023
Engineering Review Approved 10/11/2023 09/18/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 01/22/2024
Air Handling Unit (Up to 10,000 cfm) Fee $141.00 $141.00 Paid 01/22/2024
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $35.95 $35.95 Paid 01/22/2024
Exhaust Hood/Range Hood - Residential Fee $14.10 $14.10 Paid 01/22/2024
Gas Piping (Mechanical) Fee $6.30 $6.30 Paid 09/13/2023
Mechanical Duct Work Fee $24.00 $24.00 Paid 01/22/2024
Unclassified Appliance or Equipment Fee $14.10 $14.10 Paid 01/22/2024
Building Permit Fee $9,174.80 $9,174.80 Paid 01/22/2024
Mechanical Permit Fee $40.00 $40.00 Paid 01/22/2024
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 01/22/2024
Plumbing Permit Fee $40.00 $40.00 Paid 01/22/2024
Garbage Disposal Fee $13.00 $13.00 Paid 01/22/2024
Building Plan Review Fee $5,963.62 $5,963.62 Paid 09/13/2023
Mechanical Plan Review Fee $179.04 $179.04 Paid 09/13/2023
Plumbing Plan Review Fee $60.61 $60.61 Paid 09/13/2023
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 01/22/2024
Sewer System Development Charge Fee - Tenant Improvment/Addition $45,480.35 $45,480.35 Paid 01/22/2024
Water System Development Charge Fee - Tenant Improvment/Addition $26,395.56 $26,395.56 Paid 01/22/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 10/25/2023
Traffic Impact Fee (Commercial) $149,040.00 $149,040.00 Paid 08/13/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Not Ready 2/13/2024 2/13/2024 02/13/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/13/2024
1. provide city approved plans on site at time of next inspection

Frame Inspection Not Ready 2/20/2024 2/20/2024 02/20/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/20/2024
1 ; nobody on-site at time of inspection. (1:00-1:15 pm)

Plumbing Rough In Inspection Failed 3/27/2024 3/27/2024 03/27/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/27/2024
1 ; nobody on-site at time of inspection (11:27 am) 2 ; provide city approved plans on-site at time of inspection. not ready

Plumbing Rough In Inspection Partial Pass 4/2/2024 4/2/2024 04/02/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
04/02/2024
1 ; nobody on-site at time of inspection (11:27 am) 2 ; provide city approved plans on-site at time of inspection. not ready

Mechanical Rough In Inspection Partial Pass 4/3/2024 4/3/2024 04/03/2024
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Failed 4/9/2024 4/9/2024 04/09/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/09/2024
1 ; nobody on-site at time of inspection (12:30 pm) 2 ; plumber not on site at time of inspection. (not sure what plumbing was on test for inspection) not ready

Frame Inspection Failed 4/11/2024 4/11/2024 04/11/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
04/11/2024
1 ; nobody on-site at time of inspection. (1:00-1:15 pm)

Other/Miscellaneous
Carried Forward
04/11/2024
1 ; complete exit sign at top of stairs as per city approved plans at s.w. stairwell of 2nd floor. 2 ; complete nail plates at electrical penetration at south wall. 3 ; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall of restroom,and center wall of restroom. 4 ; remove abandoned vent of d.w.v. in restroom. ok to insulate

Energy (Insulation) Inspection Not Ready 4/19/2024 4/19/2024 04/19/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
04/19/2024
1.cancelled by contractor

Frame Inspection Partial Pass 4/22/2024 4/22/2024 04/22/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
04/22/2024
1 ; complete exit sign at top of stairs as per city approved plans at s.w. stairwell of 2nd floor. 2 ; complete nail plates at electrical penetration at south wall. 3 ; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall of restroom,and center wall of restroom. 4 ; remove abandoned vent of d.w.v. in restroom. ok to insulate

Other/Miscellaneous
Carried Forward
04/22/2024
1; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall

Energy (Insulation) Inspection Partial Pass 4/22/2024 4/22/2024 04/22/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/22/2024
1.cancelled by contractor

Frame Inspection Passed 4/25/2024 4/25/2024 04/25/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
04/25/2024
1; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall

Wallboard / Drywall Inspection Partial Pass 5/7/2024 5/7/2024 05/07/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Passed 5/10/2024 5/10/2024 05/10/2024
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 6/18/2024 6/18/2024 06/18/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Not Ready 6/18/2024 6/18/2024 06/18/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
06/18/2024
complete all ceiling grid requirements as discussed with contractor. not ready

Comment Building Div Inspection Passed 6/20/2024 6/20/2024 06/20/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
06/20/2024
1. provide city approved plans on site at time of next inspection

Refrigeration Line Test Inspection Passed 6/20/2024 6/20/2024 06/20/2024
Shannon King ((253) 840-6684)
Gas Test Inspection Not Ready 6/20/2024 6/20/2024 06/20/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 6/25/2024 6/25/2024 06/25/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
06/25/2024
complete all ceiling grid requirements as discussed with contractor. not ready

Gas Test Inspection Passed 6/26/2024 6/26/2024 06/26/2024
Shannon King ((253) 840-6684)
Plumbing Final Inspection Not Ready 7/19/2024 7/19/2024 07/19/2024
Shannon King ((253) 840-6684)
Mechanical Final Inspection Not Ready 7/19/2024 7/19/2024 07/19/2024
Shannon King ((253) 840-6684)
Plumbing Final Inspection Failed 7/22/2024 7/22/2024 07/22/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
07/22/2024
1 ; complete sure seals at floor drains in restrooms. 2 ; complete install of toilets and urinals in restrooms as discussed with contractor.

Mechanical Final Inspection Failed 7/22/2024 7/22/2024 07/22/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
07/22/2024
1 ; provide balance report from 3rd party balance company as required per city approved plans.

Exit Lighting Test Inspection Passed 07/26/2024
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection VOID 07/26/2024
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 07/26/2024
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 07/26/2024
David Drake ((253) 864-4171)
Fire Final Inspection Passed 7/26/2024 7/26/2024 07/26/2024
David Drake ((253) 864-4171)
Plumbing Final Inspection Passed 7/26/2024 7/26/2024 07/26/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
07/22/2024
1 ; complete sure seals at floor drains in restrooms. 2 ; complete install of toilets and urinals in restrooms as discussed with contractor.

Mechanical Final Inspection Passed 7/26/2024 7/26/2024 07/26/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
07/22/2024
1 ; provide balance report from 3rd party balance company as required per city approved plans.

Building Final Inspection Partial Pass 8/16/2024 8/16/2024 08/16/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/16/2024
1 ; provide accessible microwave at break room as discussed with contractor. 2 ; t.c.o. approved for 10 working days from 8/16/2024.

Building Final Inspection Passed 8/23/2024 8/23/2024 08/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
08/23/2024
1 ; provide accessible microwave at break room as discussed with contractor. 2 ; t.c.o. approved for 10 working days from 8/16/2024.

Plumbing Below Slab Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Hydronic Piping Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Medical Gas Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
04/09/2024
1 ; nobody on-site at time of inspection (12:30 pm) 2 ; plumber not on site at time of inspection. (not sure what plumbing was on test for inspection) not ready

Engineering Final Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
04/22/2024
1.cancelled by contractor

Mechanical Rough In Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 08/23/2024
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Miscellaneous Condition Resolved Prior to Completion
Traffic Division
TIF The city has adopted a City-Wide Traffic Impact Fee of $4500 per PM peak hour trip. The $4,500 traffic impact fee per PM peak hour trip shall be paid prior to building permit issuance. The City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. The project’s proportionate share to this fee program is based on the previous CUP for the this location. 0.2208 trips/student * 150 students = * $4500/trip = $149,040 TIF [Mieco Hutchens @ 04/26/2024 11:12 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRFA20231557 Closed Fire Alarms
PRFS20240441 Closed Fire Sprinklers

Documents & Images

Date Uploaded File Type Name
12/04/2023 Plans CONSTRUCTION PLAN SET (Stamped)
12/04/2023 Form CCS-Energy_Req List (Stamped)
12/04/2023 Form CCS-Energy_Mech Compliance Summary (Stamped)
12/04/2023 Form PLUMBING FIXTURE WORKSHEET (Stamped)
01/22/2024 Letter Permit - Detailed
01/22/2024 Receipt Receipt for transaction:2024-000123
02/13/2024 Report Inspection Report (Comment Building Div Inspection)
02/20/2024 Report Inspection Report (Frame Inspection)
03/27/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/02/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/03/2024 Report Inspection Report (Mechanical Rough In Inspection)
04/09/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/11/2024 Report Inspection Report (Frame Inspection)
04/19/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/22/2024 Report Inspection Report (Frame Inspection)
04/22/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/25/2024 Report Inspection Report (Frame Inspection)
05/07/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/10/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/18/2024 Report Inspection Report (Mechanical Rough In Inspection)
06/18/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/20/2024 Report Inspection Report (Comment Building Div Inspection)
06/20/2024 Report Inspection Report (Gas Test Inspection)
06/25/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/26/2024 Report Inspection Report (Gas Test Inspection)
07/19/2024 Report Inspection Report (Plumbing Final Inspection)
07/19/2024 Report Inspection Report (Mechanical Final Inspection)
07/22/2024 Report Inspection Report (Plumbing Final Inspection)
07/22/2024 Report Inspection Report (Refrigeration Line Test Inspection)
07/22/2024 Report Inspection Report (Mechanical Final Inspection)
08/13/2024 Receipt Receipt for transaction: 2024-001671
08/16/2024 Report Inspection Report (Building Final Inspection)
08/23/2024 Report Inspection Report (Building Final Inspection)
10/15/2024 Other Certificate of Occupancy