CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20231318
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 01/22/2024 |
| Air Handling Unit (Up to 10,000 cfm) Fee | $141.00 | $141.00 | Paid | 01/22/2024 |
| Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $35.95 | $35.95 | Paid | 01/22/2024 |
| Exhaust Hood/Range Hood - Residential Fee | $14.10 | $14.10 | Paid | 01/22/2024 |
| Gas Piping (Mechanical) Fee | $6.30 | $6.30 | Paid | 09/13/2023 |
| Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 01/22/2024 |
| Unclassified Appliance or Equipment Fee | $14.10 | $14.10 | Paid | 01/22/2024 |
| Building Permit Fee | $9,174.80 | $9,174.80 | Paid | 01/22/2024 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 01/22/2024 |
| Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $40.25 | Paid | 01/22/2024 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 01/22/2024 |
| Garbage Disposal Fee | $13.00 | $13.00 | Paid | 01/22/2024 |
| Building Plan Review Fee | $5,963.62 | $5,963.62 | Paid | 09/13/2023 |
| Mechanical Plan Review Fee | $179.04 | $179.04 | Paid | 09/13/2023 |
| Plumbing Plan Review Fee | $60.61 | $60.61 | Paid | 09/13/2023 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 01/22/2024 |
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $45,480.35 | $45,480.35 | Paid | 01/22/2024 |
| Water System Development Charge Fee - Tenant Improvment/Addition | $26,395.56 | $26,395.56 | Paid | 01/22/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 10/25/2023 |
| Traffic Impact Fee (Commercial) | $149,040.00 | $149,040.00 | Paid | 08/13/2024 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $237,132.68 | $237,132.68 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Not Ready | 2/13/2024 | 2/13/2024 | 02/13/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/13/2024
1. provide city approved plans on site at time of next inspection
|
||||
| Frame Inspection | Not Ready | 2/20/2024 | 2/20/2024 | 02/20/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/20/2024
1 ; nobody on-site at time of inspection. (1:00-1:15 pm)
|
||||
| Plumbing Rough In Inspection | Failed | 3/27/2024 | 3/27/2024 | 03/27/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/27/2024
1 ; nobody on-site at time of inspection (11:27 am)
2 ; provide city approved plans on-site at time of inspection.
not ready
|
||||
| Plumbing Rough In Inspection | Partial Pass | 4/2/2024 | 4/2/2024 | 04/02/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
04/02/2024
1 ; nobody on-site at time of inspection (11:27 am)
2 ; provide city approved plans on-site at time of inspection.
not ready
|
||||
| Mechanical Rough In Inspection | Partial Pass | 4/3/2024 | 4/3/2024 | 04/03/2024 |
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | Failed | 4/9/2024 | 4/9/2024 | 04/09/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/09/2024
1 ; nobody on-site at time of inspection (12:30 pm)
2 ; plumber not on site at time of inspection. (not sure what plumbing was on test for inspection) not ready
|
||||
| Frame Inspection | Failed | 4/11/2024 | 4/11/2024 | 04/11/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
04/11/2024
1 ; nobody on-site at time of inspection. (1:00-1:15 pm)
|
||||
|
Other/Miscellaneous
Carried Forward
04/11/2024
1 ; complete exit sign at top of stairs as per city approved plans at s.w. stairwell of 2nd floor.
2 ; complete nail plates at electrical penetration at south wall.
3 ; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall of restroom,and center wall of restroom.
4 ; remove abandoned vent of d.w.v. in restroom.
ok to insulate
|
||||
| Energy (Insulation) Inspection | Not Ready | 4/19/2024 | 4/19/2024 | 04/19/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/19/2024
1.cancelled by contractor
|
||||
| Frame Inspection | Partial Pass | 4/22/2024 | 4/22/2024 | 04/22/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
04/22/2024
1 ; complete exit sign at top of stairs as per city approved plans at s.w. stairwell of 2nd floor.
2 ; complete nail plates at electrical penetration at south wall.
3 ; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall of restroom,and center wall of restroom.
4 ; remove abandoned vent of d.w.v. in restroom.
ok to insulate
|
||||
|
Other/Miscellaneous
Carried Forward
04/22/2024
1; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall
|
||||
| Energy (Insulation) Inspection | Partial Pass | 4/22/2024 | 4/22/2024 | 04/22/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/22/2024
1.cancelled by contractor
|
||||
| Frame Inspection | Passed | 4/25/2024 | 4/25/2024 | 04/25/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
04/25/2024
1; complete draftstop at 10' o.c. at south wall as marked on floor with paint per contractor,south wall
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 5/7/2024 | 5/7/2024 | 05/07/2024 |
| Shannon King ((253) 840-6684) | ||||
| Wallboard / Drywall Inspection | Passed | 5/10/2024 | 5/10/2024 | 05/10/2024 |
| Shannon King ((253) 840-6684) | ||||
| Mechanical Rough In Inspection | Partial Pass | 6/18/2024 | 6/18/2024 | 06/18/2024 |
| Shannon King ((253) 840-6684) | ||||
| Ceiling Grid/T-Bar Inspection | Not Ready | 6/18/2024 | 6/18/2024 | 06/18/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
06/18/2024
complete all ceiling grid requirements as discussed with contractor.
not ready
|
||||
| Comment Building Div Inspection | Passed | 6/20/2024 | 6/20/2024 | 06/20/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
06/20/2024
1. provide city approved plans on site at time of next inspection
|
||||
| Refrigeration Line Test Inspection | Passed | 6/20/2024 | 6/20/2024 | 06/20/2024 |
| Shannon King ((253) 840-6684) | ||||
| Gas Test Inspection | Not Ready | 6/20/2024 | 6/20/2024 | 06/20/2024 |
| Shannon King ((253) 840-6684) | ||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 6/25/2024 | 6/25/2024 | 06/25/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
06/25/2024
complete all ceiling grid requirements as discussed with contractor.
not ready
|
||||
| Gas Test Inspection | Passed | 6/26/2024 | 6/26/2024 | 06/26/2024 |
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | Not Ready | 7/19/2024 | 7/19/2024 | 07/19/2024 |
| Shannon King ((253) 840-6684) | ||||
| Mechanical Final Inspection | Not Ready | 7/19/2024 | 7/19/2024 | 07/19/2024 |
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | Failed | 7/22/2024 | 7/22/2024 | 07/22/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/22/2024
1 ; complete sure seals at floor drains in restrooms.
2 ; complete install of toilets and urinals in restrooms as discussed with contractor.
|
||||
| Mechanical Final Inspection | Failed | 7/22/2024 | 7/22/2024 | 07/22/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/22/2024
1 ; provide balance report from 3rd party balance company as required per city approved plans.
|
||||
| Exit Lighting Test Inspection | Passed | 07/26/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Or Smoke Damper Inspection | VOID | 07/26/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Hydrostatic Test 200Lbs 2Hrs | VOID | 07/26/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Emergency Radio Test Review Inspection | VOID | 07/26/2024 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Final Inspection | Passed | 7/26/2024 | 7/26/2024 | 07/26/2024 |
| David Drake ((253) 864-4171) | ||||
| Plumbing Final Inspection | Passed | 7/26/2024 | 7/26/2024 | 07/26/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
07/22/2024
1 ; complete sure seals at floor drains in restrooms.
2 ; complete install of toilets and urinals in restrooms as discussed with contractor.
|
||||
| Mechanical Final Inspection | Passed | 7/26/2024 | 7/26/2024 | 07/26/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
07/22/2024
1 ; provide balance report from 3rd party balance company as required per city approved plans.
|
||||
| Building Final Inspection | Partial Pass | 8/16/2024 | 8/16/2024 | 08/16/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/16/2024
1 ; provide accessible microwave at break room as discussed with contractor.
2 ; t.c.o. approved for 10 working days from 8/16/2024.
|
||||
| Building Final Inspection | Passed | 8/23/2024 | 8/23/2024 | 08/23/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
08/23/2024
1 ; provide accessible microwave at break room as discussed with contractor.
2 ; t.c.o. approved for 10 working days from 8/16/2024.
|
||||
| Plumbing Below Slab Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Firewall/Firestop Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Shear Wall Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Roof Sheathing Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Slab/Insulation Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Foundation/Rebar Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Footing/Setback Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Comment Engineering Div Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Hydronic Piping Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Combination Frame And Rough In Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Exhaust Hood Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Light Test For Grease Duct Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Exhaust/Vent Fans Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Medical Gas Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Cover Inspection/Thrust Blocks Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
04/09/2024
1 ; nobody on-site at time of inspection (12:30 pm)
2 ; plumber not on site at time of inspection. (not sure what plumbing was on test for inspection) not ready
|
||||
| Engineering Final Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Planning Final Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Energy (Insulation) Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
04/22/2024
1.cancelled by contractor
|
||||
| Mechanical Rough In Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Ceiling Grid/T-Bar Inspection | VOID | 08/23/2024 | ||
| Shannon King ((253) 840-6684) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
| Miscellaneous Condition | Resolved | Prior to Completion |
|
Traffic Division
TIF
The city has adopted a City-Wide Traffic Impact Fee of $4500 per PM peak hour trip. The $4,500 traffic impact fee per PM peak hour trip shall be paid prior to building permit issuance. The City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition.
The project’s proportionate share to this fee program is based on the previous CUP for the this location. 0.2208 trips/student * 150 students = * $4500/trip = $149,040 TIF
[Mieco Hutchens @ 04/26/2024 11:12 AM]
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.