Summary

PRCTI20231574
Commercial - Tenant Improvement/Remodel
Closed
PUYALLUP SCHOOL DISTRICT #3
Alteration/Remodel
Small Tenant Improvements at PHS, BLDG -01. At existing third floor existing chemistry classroom 3 new student lab stations will be added, along with a relocated fume hood and refrigerator from building-02. Existing third floor storage room near chemistry classroom will be converted to Science Prep room which includes relocated a fume hood, small refrigerator, hazardous materials storage cabinets, science utility sink, emergency eyewash, fire blanket, fire extinguisher, spill kits, neutralized chemical barrel, and installing a new emergency shower. No exterior work is building done except roof penetrations for fume hood exhaust. The existing building is currently in use, connected to public water and sewer. Work planned to take place over winter break, after contractor has been selected. - REV (1) - 5.31.2024 - ADDED SCOPE FOR HEALTH DEPT REQUIRED SCIENCE CLASSROOM 325 PURGE FAN, MOTORIZED DAMPER, AND EMERGENCY 100% VENTILATION BUTTON
11/07/2023
02/14/2024
03/24/2025
09/24/2024

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
06/11/2024 REVISED MECH DRAWING - REV (1) (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/14/2024 06/07/2024
Planning Review Approved 01/18/2024 01/22/2024
Fire Review Approved 01/18/2024 01/10/2024
Building Review Approved 01/18/2024 01/09/2024
Engineering Review Approved 01/18/2024 01/05/2024
Engineering Traffic Review Approved 01/18/2024 01/04/2024
Planning Review Approved 12/18/2023 12/21/2023
Engineering Review Approved 12/18/2023 12/19/2023
Fire Review Failed 12/18/2023 12/18/2023
Building Review Approved 12/18/2023 12/15/2023
Engineering Traffic Review Approved 12/18/2023 11/21/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/14/2024
Exhaust Vent Fan (Bath) Fee $28.20 $28.20 Paid 02/14/2024
Building Permit Fee $251.25 $251.25 Paid 02/14/2024
Mechanical Permit Fee $40.00 $40.00 Paid 02/14/2024
Plumbing Fixtures Fee $65.00 $65.00 Paid 02/14/2024
Plumbing Permit Fee $40.00 $40.00 Paid 02/14/2024
Building Plan Review Fee $163.31 $163.31 Paid 11/08/2023
Mechanical Plan Review Fee $44.33 $44.33 Paid 11/08/2023
Plumbing Plan Review Fee $68.25 $68.25 Paid 11/08/2023
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/14/2024
Water System Development ChargeFee - Tenant Improvment/Addition $2,847.20 $2,847.20 Paid 02/14/2024
Sewer System Development ChargeFee - Tenant Improvment/Addition $3,461.60 $3,461.60 Paid 02/14/2024
Resubmittal Fee $180.00 $180.00 Paid 01/01/2024
Resubmittal Fee $180.00 $180.00 Paid 06/03/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Not Ready 4/12/2024 4/12/2024 04/12/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/12/2024
1 ; provide city approved plans on-site at time of inspection as discussed with contractor. ( not ready)

Mechanical Rough In Inspection Failed 4/15/2024 4/15/2024 04/15/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/15/2024
1 ; test failed on d.w.v. test in room 225

Plumbing Rough In Inspection Partial Pass 4/18/2024 4/18/2024 04/19/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/19/2024
1 ; provide city approved plans on-site at time of inspection as discussed with contractor. ( not ready)

Other/Miscellaneous
Carried Forward
04/19/2024
SCIENCE PREP AREA 1. provide 10' ft head test on DWV at time of next inspection 2. supply approved at 100 PSI 3.no eye wash valve was installed at time of inspection ROOM 325 science class room 1. supply approved at 100 PSI 2. provide correct grade on DWV per code 3. fix all leaks on DWV 4. provide test on DWV at time of next inspection

Plumbing Rough In Inspection Not Ready 4/22/2024 4/22/2024 04/22/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/22/2024
SCIENCE PREP AREA 1. provide 10' ft head test on DWV at time of next inspection 2. supply approved at 100 PSI 3.no eye wash valve was installed at time of inspection ROOM 325 science class room 1. supply approved at 100 PSI 2. provide correct grade on DWV per code 3. fix all leaks on DWV 4. provide test on DWV at time of next inspection

Other/Miscellaneous
Carried Forward
04/22/2024
NO ONE ON SITE AT TIME OF INSPECTION 2:15 pm

Energy (Insulation) Inspection Partial Pass 4/23/2024 4/23/2024 04/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/24/2024
1. exterior wall at room 325 approved

Frame Inspection Failed 4/23/2024 4/23/2024 04/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/24/2024
SCIENCE PREP ROOM 1.seal penetration's at floor 2. insulate water lines 3.provide nail plates 4.provide header detail from architect for new door opening as discussed with contractor 5.not a complete list

Mechanical Rough In Inspection Partial Pass 4/23/2024 4/23/2024 04/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/24/2024
1 ; test failed on d.w.v. test in room 225

Other/Miscellaneous
Carried Forward
04/24/2024
1.room 325 and science prep room DWV approved 2. room 225 seal penetrations at ceiling as discussed with contractor

Wallboard / Drywall Inspection Partial Pass 4/26/2024 4/26/2024 04/26/2024
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 4/30/2024 4/30/2024 04/30/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/30/2024
1.room 325 and science prep room DWV approved 2. room 225 seal penetrations at ceiling as discussed with contractor

Other/Miscellaneous
Carried Forward
04/30/2024
1. duct work at fume hoods approved ok to cover

Ceiling Grid/T-Bar Inspection Partial Pass 5/23/2024 5/23/2024 05/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/24/2024
1. this was a partial inspection for room 325 approved

Plumbing Final Inspection Partial Pass 5/23/2024 5/23/2024 05/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/24/2024
1. this was partial inspection for room 325 2.provide insulation at hot water lines at sinks as discussed with contractor

Mechanical Final Inspection Partial Pass 5/23/2024 5/23/2024 05/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/24/2024
1. this was partial inspection for room 325

Building Final Inspection Partial Pass 5/23/2024 5/23/2024 05/24/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/24/2024
1. this was partial inspection for room 325 2. ok to occupy pending electrical final approval

Ceiling Grid/T-Bar Inspection Not Ready 6/27/2024 6/27/2024 06/27/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/27/2024
1. this was a partial inspection for room 325 approved

Other/Miscellaneous
Carried Forward
06/27/2024
see notes on final inspection today date

Building Final Inspection Not Ready 6/27/2024 6/27/2024 06/27/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/27/2024
1. this was partial inspection for room 325 2. ok to occupy pending electrical final approval

Other/Miscellaneous
Carried Forward
06/27/2024
1.complete items from department of health inspection 2.provide department of health approval at time of next inspection 3.provide fire final approval at time of next inspection 4.not ready

Mechanical Final Inspection Not Ready 7/22/2024 7/22/2024 07/22/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/22/2024
1. this was partial inspection for room 325

Other/Miscellaneous
Carried Forward
07/22/2024
1 ; complete Department of Health requirements for changes to hood duct and final prior to mechanical final inspection. not ready

Comment Engineering Div Inspection Partial Pass 9/23/2024 9/23/2024 09/23/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection VOID 09/24/2024
Jeff Hill ((253) 204-5633)
Cover Inspection/Thrust Blocks Inspection VOID 09/25/2024
Jeff Hill ((253) 204-5633)
Comment Building Div Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Footing/Setback Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Foundation/Rebar Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Underfloor Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Slab/Insulation Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Block Wall Rebar Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Firewall/Firestop Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Re-Roof Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Refrigeration Line Test Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Exhaust/Vent Fans Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Fire Or Smoke Damper Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Hydrostatic Test 200Lbs 2Hrs VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Emergency Radio Test Review Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Planning Final Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Energy (Insulation) Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Other/Miscellaneous
Outstanding
04/24/2024
1. exterior wall at room 325 approved

Frame Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Other/Miscellaneous
Outstanding
04/24/2024
SCIENCE PREP ROOM 1.seal penetration's at floor 2. insulate water lines 3.provide nail plates 4.provide header detail from architect for new door opening as discussed with contractor 5.not a complete list

Wallboard / Drywall Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Mechanical Rough In Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Other/Miscellaneous
Outstanding
04/30/2024
1. duct work at fume hoods approved ok to cover

Ceiling Grid/T-Bar Inspection VOID 10/24/2024
Joyce Kennedy ((253) 841-5405)
Other/Miscellaneous
Outstanding
06/27/2024
1. this was a partial inspection for room 325 approved

Other/Miscellaneous
Outstanding
06/27/2024
see notes on final inspection today date

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Backflow Protection Device - Commercial RPBA Resolved Engineering Division Prior to Occupancy
: An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. The applicant shall apply for a Utility Service Repair Permit through the CityView portal, replace the backflow device, and receive approval from the City inspector prior to occupancy. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/01/2024 Receipt Receipt for transaction:2024-000001
01/23/2024 Plans CONSTRUCTION PLAN SET (Stamped)
01/23/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
01/23/2024 Plans PRODUCT SPECIFICATIONS (Stamped)
01/23/2024 Form WESC (Stamped)
02/14/2024 Letter Permit - Detailed
02/14/2024 Receipt Receipt for transaction:2024-000275
02/15/2024 Letter Permit Job Card
04/12/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/15/2024 Report Inspection Report (Mechanical Rough In Inspection)
04/19/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/24/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/24/2024 Report Inspection Report (Frame Inspection)
04/24/2024 Report Inspection Report (Mechanical Rough In Inspection)
04/25/2024 Report Inspection Report (Plumbing Rough In Inspection)
04/25/2024 Report Inspection Report (Shear Wall Inspection)
04/26/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/30/2024 Report Inspection Report (Mechanical Rough In Inspection)
05/24/2024 Report Inspection Report (Building Final Inspection)
05/24/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/24/2024 Report Inspection Report (Mechanical Final Inspection)
05/24/2024 Report Inspection Report (Plumbing Final Inspection)
05/31/2024 Form REVISION FORM - REV (1)
06/03/2024 Receipt Receipt for transaction:2024-001160
06/11/2024 Plans REVISED MECH DRAWING - REV (1) (Stamped)
06/27/2024 Report Inspection Report (Building Final Inspection)
06/27/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/22/2024 Report Inspection Report (Mechanical Final Inspection)
08/01/2024 Report Inspection Report (Building Final Inspection)
08/01/2024 Report Inspection Report (Mechanical Final Inspection)
08/06/2024 Report Inspection Report (Building Final Inspection)
09/25/2024 Report Inspection Report (Comment Engineering Div Inspection)
09/25/2024 Report Inspection Report (Engineering Final Inspection)
11/08/2023 Receipt Receipt for transaction:2023-002127


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.