Permit Application Status
PRCTI20231772
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 05/06/2024 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 05/06/2024 |
Building Permit Fee | $6,294.95 | $6,294.95 | Paid | 05/06/2024 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 05/06/2024 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 05/06/2024 |
Plumbing Fixtures Fee | $117.00 | $117.00 | Paid | 05/06/2024 |
Building Plan Review Fee | $4,091.72 | $4,091.72 | Paid | 03/06/2024 |
Mechanical Plan Review Fee | $41.60 | $41.60 | Paid | 03/06/2024 |
Plumbing Plan Review Fee | $102.05 | $102.05 | Paid | 03/06/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 05/06/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/02/2024 |
Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 06/18/2024 |
Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 06/18/2024 |
Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 08/06/2024 |
Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 08/06/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $13,381.32 | $13,381.32 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Not Ready | 5/8/2024 | 5/8/2024 | 05/08/2024 |
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | Not Ready | 5/14/2024 | 5/14/2024 | 05/14/2024 |
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | Partial Pass | 6/3/2024 | 6/3/2024 | 06/03/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
06/03/2024
1.supply and return ducts approved for insulation
|
||||
Plumbing Rough In Inspection | Partial Pass | 6/11/2024 | 6/11/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/11/2024
1.DWV approved at 7 1/2 pounds air
2.supply approved at 80 psi
3. provide run test at DWV tie ins at time of next inspection
|
||||
Frame Inspection | Failed | 6/11/2024 | 6/11/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/11/2024
1.provide electrical cover approval
2.complete all fasteners at framing per city approved plans
3. complete putty packs at electrical boxes in rated wall
4.complete nail plates at plumbing
5. provide detail for head of wall
|
||||
Exhaust/Vent Fans Inspection | Partial Pass | 6/11/2024 | 6/11/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/11/2024
1. exhaust terminations at soffits approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 6/12/2024 | 6/12/2024 | 06/12/2024 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 6/13/2024 | 6/13/2024 | 06/13/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
06/13/2024
complete drywall at 1 hour wall from soffit to top of wall and storage room.
|
||||
Plumbing Rough In Inspection | Partial Pass | 6/20/2024 | 6/20/2024 | 06/20/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
06/20/2024
inspection date 6/11/2024
1.DWV approved at 7 1/2 pounds air
2.supply approved at 80 psi
3. provide run test at DWV tie ins at time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
06/20/2024
date of inspection 6/20/2024
1.run test on DWV tie in at level A approved
|
||||
Building Final Inspection | Not Ready | 7/5/2024 | 7/5/2024 | 07/05/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/05/2024
cancelled by russell
|
||||
Mechanical Final Inspection | Not Ready | 7/5/2024 | 7/5/2024 | 07/05/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/05/2024
cancelled by Russell
|
||||
Fire Final Inspection | Not Ready | 7/5/2024 | 7/5/2024 | 07/05/2024 |
Ray Cockerham ((253) 841-5585) | ||||
Building Final Inspection | Partial Pass | 7/8/2024 | 7/8/2024 | 07/08/2024 |
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | Not Ready | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Shannon King ((253) 840-6684) | ||||
Plumbing Final Inspection | Not Ready | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | Not Ready | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Shannon King ((253) 840-6684) | ||||
Fire Final Inspection | Partial Pass | 7/19/2024 | 7/22/2024 | 07/22/2024 |
David Drake ((253) 864-4171) | ||||
Building Final Inspection | Failed | 7/22/2024 | 7/22/2024 | 07/22/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/22/2024
1 ; provide department of health final prior to building final approval.
2 ; provide balance report prior to mechanical final.
|
||||
Mechanical Final Inspection | Failed | 7/22/2024 | 7/22/2024 | 07/22/2024 |
Shannon King ((253) 840-6684) | ||||
Plumbing Final Inspection | Failed | 7/22/2024 | 7/22/2024 | 07/22/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/22/2024
see Building final inspection dated 7/22/2024
|
||||
Frame Inspection | Partial Pass | 7/26/2024 | 7/26/2024 | 07/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/26/2024
inspection date 6/11/2024
1.provide electrical cover approval
2.complete all fasteners at framing per city approved plans
3. complete putty packs at electrical boxes in rated wall
4.complete nail plates at plumbing
5. provide detail for head of wall
|
||||
Other/Miscellaneous
Outstanding
07/26/2024
ok to top down phase 2 wall between 180.7b and c
|
||||
Plumbing Rough In Inspection | Partial Pass | 7/26/2024 | 7/26/2024 | 07/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/26/2024
inspection date 6/11/2024
1.DWV approved at 7 1/2 pounds air
2.supply approved at 80 psi
3. provide run test at DWV tie ins at time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
07/26/2024
date of inspection 6/20/2024
1.run test on DWV tie in at level A approved
|
||||
Other/Miscellaneous
Carried Forward
07/26/2024
sink at 1807 supply and drain ok
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 08/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/01/2024
1.supply and return ducts approved for insulation
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
phase two
1.duct ok to insulate area 180.7 rooms B and C
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 08/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/01/2024
complete drywall at 1 hour wall from soffit to top of wall and storage room.
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
phase 2
1. top out in area 180.7 rooms B and C approved
|
||||
Building Final Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 08/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
08/01/2024
1 ; provide department of health final prior to building final approval.
2 ; provide balance report prior to mechanical final.
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
phase 1 ok to occupy
|
||||
Firewall/Firestop Inspection | Not Ready | 8/6/2024 | 8/6/2024 | 08/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/07/2024
1.provide special inspection report for fire stopping at time of next inspection
|
||||
Frame Inspection | Failed | 8/6/2024 | 8/6/2024 | 08/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/07/2024
inspection date 6/11/2024
1.provide electrical cover approval
2.complete all fasteners at framing per city approved plans
3. complete putty packs at electrical boxes in rated wall
4.complete nail plates at plumbing
5. provide detail for head of wall
|
||||
Other/Miscellaneous
Carried Forward
08/07/2024
phase 2
1. complete fasteners at framing
2.complete framing at head outs
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/7/2024 | 8/7/2024 | 08/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/08/2024
complete drywall at 1 hour wall from soffit to top of wall and storage room.
|
||||
Other/Miscellaneous
Carried Forward
08/08/2024
phase 2
1. top out in area 180.7 rooms B and C approved
|
||||
Other/Miscellaneous
Carried Forward
08/08/2024
date of inspection 8/7/2024
2nd phase
1. rooms M180.7B and M180.7C framing and fire stopping above hard lids approved for cover walls in this area also approved for cover
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/9/2024 | 8/9/2024 | 08/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/09/2024
complete drywall at 1 hour wall from soffit to top of wall and storage room.
|
||||
Other/Miscellaneous
Carried Forward
08/09/2024
phase 2
1. top out in area 180.7 rooms B and C approved
|
||||
Other/Miscellaneous
Carried Forward
08/09/2024
date of inspection 8/7/2024
2nd phase
1. rooms M180.7B and M180.7C framing and fire stopping above hard lids approved for cover walls in this area also approved for cover
|
||||
Other/Miscellaneous
Carried Forward
08/09/2024
date of inspection 8/8/2024
1.drywall approved in rooms M180.7B and M180.7C and surrounding area
2.phase 2
|
||||
Mechanical Rough In Inspection | Partial Pass | 8/26/2024 | 8/26/2024 | 08/27/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/27/2024
1.supply and return ducts approved for insulation
|
||||
Other/Miscellaneous
Carried Forward
08/27/2024
phase two
1.duct ok to insulate area 180.7 rooms B and C
|
||||
Other/Miscellaneous
Carried Forward
08/27/2024
phase 2
ceiling grid cover inspection for area 180.7 approved for cover
|
||||
Emergency Radio Test Review Inspection | VOID | 09/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 09/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 09/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Mechanical Final Inspection | Failed | 9/20/2024 | 9/20/2024 | 09/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/20/2024
nobody onsite no contact in the morning.
|
||||
Plumbing Final Inspection | Failed | 9/20/2024 | 9/20/2024 | 09/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/20/2024
see Building final inspection dated 7/22/2024
|
||||
Other/Miscellaneous
Carried Forward
09/20/2024
nobody onsite no contact in the morning.
|
||||
Building Final Inspection | Failed | 9/20/2024 | 9/20/2024 | 09/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/20/2024
phase 1 ok to occupy
|
||||
Other/Miscellaneous
Carried Forward
09/20/2024
nobody onsite no contact in the morning.
|
||||
Erosion And Sediment Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Footing/Setback Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Underfloor Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Block Wall Rebar Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Gas Test Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Planning Final Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Engineering Final Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Exhaust/Vent Fans Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
06/11/2024
inspection date 6/11/2024
1. exhaust terminations at soffits approved
|
||||
Mechanical Rough In Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
08/27/2024
1.supply and return ducts approved for insulation
|
||||
Other/Miscellaneous
Outstanding
08/27/2024
phase two
1.duct ok to insulate area 180.7 rooms B and C
|
||||
Other/Miscellaneous
Outstanding
08/27/2024
phase 2
ceiling grid cover inspection for area 180.7 approved for cover
|
||||
Wallboard / Drywall Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
08/09/2024
complete drywall at 1 hour wall from soffit to top of wall and storage room.
|
||||
Other/Miscellaneous
Outstanding
08/09/2024
phase 2
1. top out in area 180.7 rooms B and C approved
|
||||
Other/Miscellaneous
Outstanding
08/09/2024
date of inspection 8/7/2024
2nd phase
1. rooms M180.7B and M180.7C framing and fire stopping above hard lids approved for cover walls in this area also approved for cover
|
||||
Other/Miscellaneous
Outstanding
08/09/2024
date of inspection 8/8/2024
1.drywall approved in rooms M180.7B and M180.7C and surrounding area
2.phase 2
|
||||
Frame Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
08/07/2024
inspection date 6/11/2024
1.provide electrical cover approval
2.complete all fasteners at framing per city approved plans
3. complete putty packs at electrical boxes in rated wall
4.complete nail plates at plumbing
5. provide detail for head of wall
|
||||
Other/Miscellaneous
Outstanding
08/07/2024
phase 2
1. complete fasteners at framing
2.complete framing at head outs
|
||||
Plumbing Rough In Inspection | VOID | 09/24/2024 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
07/26/2024
inspection date 6/11/2024
1.DWV approved at 7 1/2 pounds air
2.supply approved at 80 psi
3. provide run test at DWV tie ins at time of next inspection
|
||||
Other/Miscellaneous
Outstanding
07/26/2024
date of inspection 6/20/2024
1.run test on DWV tie in at level A approved
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2018 IFC and 2018 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|