Summary

PRCTI20240063
Commercial - Tenant Improvement/Remodel
Permit(s) Issued
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
TI: retail tenant improvement project, designated as Group M (Mercantile). Work to include but not limited to:Demolition of existing non-structural tenant improvements and storefront; New interior partition walls, ceilings, finishes; New storefront, new illuminated channel; New electrical distribution and lighting; Existing HVAC unit with new distribution as required; (1) one new restroom location using existing plumbing fixtures; (1) one new sink in Staff Room. - JD SPORTS UNIT #530 * REV (1) - 5/17/2024 - FLOOR PLAN CHANGES, EXITS, EGRESS PATHWAYS, WALLS AND MULTIPLE OTHER CHANGES FROM ORIGINAL PLANS
01/12/2024
04/02/2024
01/22/2025

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
06/06/2024 CONSTRUCTION PLAN SET - REV (1) (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/03/2024 06/03/2024
Fire Review Approved 06/03/2024 05/20/2024
Building Review Approved 02/20/2024 02/16/2024
Engineering Review Approved 02/20/2024 02/16/2024
Planning Review VOID 02/20/2024 02/13/2024
Fire Review Approved 02/20/2024 02/09/2024
Engineering Traffic Review Approved 02/20/2024 01/24/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/02/2024
Building Permit Fee $4,231.25 $4,231.25 Paid 04/02/2024
Mechanical Permit Fee $40.00 $40.00 Paid 04/02/2024
Plumbing Permit Fee $40.00 $40.00 Paid 04/02/2024
Plumbing Fixtures Fee $13.00 $13.00 Paid 04/02/2024
Building Plan Review Fee $2,750.31 $2,750.31 Paid 01/12/2024
Mechanical Plan Review Fee $26.00 $26.00 Paid 01/12/2024
Plumbing Plan Review Fee $34.45 $34.45 Paid 01/12/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 04/02/2024
Resubmittal Fee $180.00 $180.00 Paid 05/31/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Pending
Comment Building Div Inspection Pending
Monty Johnson ((253) 770-3326)
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Pending
Monty Johnson ((253) 770-3326)
Underfloor Inspection Pending
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Pending
Monty Johnson ((253) 770-3326)
Block Wall Rebar Inspection Pending
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection Pending
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Pending
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection Pending
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Pending
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Pending
Monty Johnson ((253) 770-3326)
Re-Roof Inspection Pending
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection Pending
Monty Johnson ((253) 770-3326)
Gas Test Inspection Pending
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection Pending
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection Pending
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection Pending
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection Pending
Monty Johnson ((253) 770-3326)
Medical Gas Inspection Pending
Monty Johnson ((253) 770-3326)
Cover Inspection/Thrust Blocks Inspection Pending
Engineering Final Inspection Pending
Floodproof Certification Inspection Pending
Elevation Verification Inspection Pending
Plumbing Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
05/06/2024
1 ; provide plumbing test on D.W.V. as discussed with contractor. not ready

Mechanical Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Frame Inspection Pending
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
06/20/2024
1 ; provide engineers fix or approval of no continuous special inspection of welding as required per plans. 2 ; approved new framing wall at staff break room.

Plumbing Final Inspection Pending
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection Pending
Monty Johnson ((253) 770-3326)
Building Final Inspection Pending
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
07/26/2024
1 ; provide fire final prior to building final inspection approval. 2 ; complete install of vert. grab bar 39''-41'' from to center line of grab bar as discussed with contractor. 3 ; complete accessible signage at fitting room as per city approved plans. 4 ; provide balance report at time of mechanical final inspection. 5 ; provide city approved plans for racking in storage room with special inspection report for anchor bolts. 6 ; complete install of ceiling tile in break room. 7 ; complete seismic wire on t.v. as discussed with contractor. 8 ; will need to check mechanical equipment on roof at time of next inspection. 9 ; complete accessible path as per city approved plans prior to next inspection.

Other/Miscellaneous
Outstanding
07/26/2024
date of inspection 7/12/2024 1.complete all outstanding permits 2. provide electrical approval for added emergency lighting 3.complete accessible signage at dressing room 4.TCO granted for 10 business days from todays date

Plumbing Rough In Inspection Not Ready 5/6/2024 5/6/2024 05/06/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/06/2024
1 ; provide plumbing test on D.W.V. as discussed with contractor. not ready

Frame Inspection Not Ready 5/6/2024 5/6/2024 05/06/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/06/2024
1 ; complete all framing rough-in ,plumbing on test ,and electrical cover approval prior to next inspection. not ready

Combination Frame And Rough In Inspection Not Ready 5/6/2024 5/6/2024 05/06/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/06/2024
1 ; complete all framing rough-in ,plumbing on test ,and electrical cover approval prior to next inspection. not ready

Mechanical Rough In Inspection Not Ready 5/7/2024 5/7/2024 05/07/2024
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Failed 5/8/2024 5/8/2024 05/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/08/2024
1 ; complete all framing rough-in ,plumbing on test ,and electrical cover approval prior to next inspection. not ready

Other/Miscellaneous
Carried Forward
05/08/2024
1 ; complete bottom track attachment as per city approved plans. 2 ; complete lateral bracing CR as per plans. 3 ; complete angle clips as per plans. 4 ; inspection of framing at sales floor only.

Frame Inspection Partial Pass 5/10/2024 5/10/2024 05/10/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/10/2024
1 ; complete all framing rough-in ,plumbing on test ,and electrical cover approval prior to next inspection. not ready

Wallboard / Drywall Inspection Failed 5/14/2024 5/14/2024 05/14/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/14/2024
1. complete drywall fasteners as discussed with contractor 2. provide correct space at top of demising wall for deflection per city approved plans

Combination Frame And Rough In Inspection Partial Pass 5/15/2024 5/15/2024 05/15/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/15/2024
1 ; complete bottom track attachment as per city approved plans. 2 ; complete lateral bracing CR as per plans. 3 ; complete angle clips as per plans. 4 ; inspection of framing at sales floor only.

Combination Frame And Rough In Inspection Not Ready 5/22/2024 5/22/2024 05/22/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/22/2024
1 ; complete bottom track attachment as per city approved plans. 2 ; complete lateral bracing CR as per plans. 3 ; complete angle clips as per plans. 4 ; inspection of framing at sales floor only.

Other/Miscellaneous
Carried Forward
05/22/2024
1. complete all framing,nailplates,and electrical cover approval as discussed with contractor. not ready

Combination Frame And Rough In Inspection Not Ready 5/29/2024 5/29/2024 05/29/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/29/2024
1. complete all framing,nailplates,and electrical cover approval as discussed with contractor. not ready

Other/Miscellaneous
Carried Forward
05/29/2024
1 ; complete all framing as per city approved plans . 2 ; provide special inspection approval report for welding and anchor bolts as discussed with contractor.

Combination Frame And Rough In Inspection Partial Pass 5/31/2024 5/31/2024 06/01/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/01/2024
1. complete all framing,nailplates,and electrical cover approval as discussed with contractor. not ready

Other/Miscellaneous
Carried Forward
06/01/2024
1 ; complete all framing as per city approved plans . 2 ; provide special inspection approval report for welding and anchor bolts as discussed with contractor.

Other/Miscellaneous
Carried Forward
06/01/2024
INSPECTION DATE 5/31/2024 1.managers office approved for cover 2.fur out wall at demising wall sales side approved 3.provide special inspection reports on site for front area on site at time of next inspection 4.complete framing at front area per city approved plans

Frame Inspection Failed 6/3/2024 6/3/2024 06/03/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/03/2024
1 ; complete all framing rough-in ,plumbing on test ,and electrical cover approval prior to next inspection. not ready

Other/Miscellaneous
Carried Forward
06/03/2024
1 ; provide engineers fix or approval of no continuous special inspection of welding as required per plans. 2 ; approved new framing wall at staff break room.

Wallboard / Drywall Inspection Failed 6/3/2024 6/3/2024 06/03/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/03/2024
1. complete drywall fasteners as discussed with contractor 2. provide correct space at top of demising wall for deflection per city approved plans

Other/Miscellaneous
Carried Forward
06/03/2024
1 ; complete drywall nailing at all overdriven screws as discussed with contractor.

Wallboard / Drywall Inspection Partial Pass 6/4/2024 6/4/2024 06/04/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/04/2024
1 ; complete drywall nailing at all overdriven screws as discussed with contractor.

Wallboard / Drywall Inspection Partial Pass 6/20/2024 6/20/2024 06/20/2024
Shannon King ((253) 840-6684)
Frame Inspection Failed 6/20/2024 6/20/2024 06/20/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/20/2024
1 ; provide engineers fix or approval of no continuous special inspection of welding as required per plans. 2 ; approved new framing wall at staff break room.

Plumbing Final Inspection Not Ready 7/1/2024 7/1/2024 07/01/2024
Shannon King ((253) 840-6684)
Mechanical Final Inspection Not Ready 7/1/2024 7/1/2024 07/01/2024
Shannon King ((253) 840-6684)
Building Final Inspection Not Ready 7/5/2024 7/5/2024 07/05/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2024
provide fire sign off prior to building

Fire Or Smoke Damper Inspection VOID 07/08/2024
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 07/08/2024
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 07/08/2024
David Drake ((253) 864-4171)
Exit Lighting Test Inspection Failed 7/11/2024 07/11/2024
David Drake ((253) 864-4171)
Exit Light Test
Carried Forward
07/11/2024
Provide illuminated path for egress.

Fire Final Inspection Not Ready 7/1/2024 7/11/2024 07/11/2024
David Drake ((253) 864-4171)
Building Final Inspection Failed 7/11/2024 7/11/2024 07/11/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/11/2024
1 ; provide fire final prior to building final inspection approval. 2 ; complete install of vert. grab bar 39''-41'' from to center line of grab bar as discussed with contractor. 3 ; complete accessible signage at fitting room as per city approved plans. 4 ; provide balance report at time of mechanical final inspection. 5 ; provide city approved plans for racking in storage room with special inspection report for anchor bolts. 6 ; complete install of ceiling tile in break room. 7 ; complete seismic wire on t.v. as discussed with contractor. 8 ; will need to check mechanical equipment on roof at time of next inspection. 9 ; complete accessible path as per city approved plans prior to next inspection.

Fire Final Inspection Passed w/ Conditions 7/12/2024 (9:00 to 10:00) 7/12/2024 07/12/2024
Ray Cockerham ((253) 841-5585)
Building Final Inspection Partial Pass 7/12/2024 7/12/2024 07/13/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
07/13/2024
1 ; provide fire final prior to building final inspection approval. 2 ; complete install of vert. grab bar 39''-41'' from to center line of grab bar as discussed with contractor. 3 ; complete accessible signage at fitting room as per city approved plans. 4 ; provide balance report at time of mechanical final inspection. 5 ; provide city approved plans for racking in storage room with special inspection report for anchor bolts. 6 ; complete install of ceiling tile in break room. 7 ; complete seismic wire on t.v. as discussed with contractor. 8 ; will need to check mechanical equipment on roof at time of next inspection. 9 ; complete accessible path as per city approved plans prior to next inspection.

Other/Miscellaneous
Carried Forward
07/13/2024
date of inspection 7/12/2024 1.complete all outstanding permits 2. provide electrical approval for added emergency lighting 3.complete accessible signage at dressing room 4.TCO granted for 10 business days from todays date

Building Final Inspection Failed 7/26/2024 7/26/2024 07/26/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/26/2024
1 ; provide fire final prior to building final inspection approval. 2 ; complete install of vert. grab bar 39''-41'' from to center line of grab bar as discussed with contractor. 3 ; complete accessible signage at fitting room as per city approved plans. 4 ; provide balance report at time of mechanical final inspection. 5 ; provide city approved plans for racking in storage room with special inspection report for anchor bolts. 6 ; complete install of ceiling tile in break room. 7 ; complete seismic wire on t.v. as discussed with contractor. 8 ; will need to check mechanical equipment on roof at time of next inspection. 9 ; complete accessible path as per city approved plans prior to next inspection.

Other/Miscellaneous
Carried Forward
07/26/2024
date of inspection 7/12/2024 1.complete all outstanding permits 2. provide electrical approval for added emergency lighting 3.complete accessible signage at dressing room 4.TCO granted for 10 business days from todays date

Other/Miscellaneous
Carried Forward
07/26/2024
nobody onsite, 11:45 am

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Plumbing FUW Utility Service Credit Open Engineering Division Standard Conditions
: Upon demolition of the existing structures, utility service credits become available for the subject site. It is the property owner’s responsibility to retain a copy of available utility service credits and to submit them to the City for future utility development credit. Utility service credits are only valid for a period of six years from the date of permit issuance for which the credits are granted. Three sewer FUW credits are hereby granted for the demolished or removed plumbing fixtures. If you or the property owner would like to redeem a portion or all of the credits on this permit, please provide the property owner’s written approval to do so.
Ready to Issue - Need Contractor Info Resolved Development & Permitting Services Prior to Issuance
: Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. received 3.27.24

Related Permit & Planning Applications

Reference Number Status Type
PRFS20240693 Permit(s) Issued Fire Sprinklers
PRCTI20240722 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRSG20241142 In Plan Check Sign/Awning

Documents & Images

Date Uploaded File Type Name
02/20/2024 Report CalculationsStructural (Stamped)
01/12/2024 Receipt Receipt for transaction:2024-000072
02/20/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
02/20/2024 Form ENERGY CODE (Stamped)
02/20/2024 Plans CONSTRUCTION PLAN SET (Stamped)
04/02/2024 Receipt Receipt for transaction:2024-000631
04/02/2024 Permit Permit - Detailed
04/02/2024 Letter Permit Job Card
05/06/2024 Report Inspection Report (Plumbing Rough In Inspection)
05/06/2024 Report Inspection Report (Frame Inspection)
05/06/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
05/07/2024 Report Inspection Report (Mechanical Rough In Inspection)
05/08/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
05/10/2024 Report Inspection Report (Frame Inspection)
05/14/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/15/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
06/06/2024 Plans CONSTRUCTION PLAN SET - REV (1) (Stamped)
05/22/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
05/29/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
05/31/2024 Receipt Receipt for transaction:2024-001142
06/01/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
06/03/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/03/2024 Report Inspection Report (Frame Inspection)
06/04/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/20/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/20/2024 Report Inspection Report (Frame Inspection)
06/21/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
07/01/2024 Report Inspection Report (Plumbing Final Inspection)
07/01/2024 Report Inspection Report (Mechanical Final Inspection)
07/11/2024 Report Inspection Report (Building Final Inspection)
07/13/2024 Report Inspection Report (Building Final Inspection)