Summary

PRCTI20240158
Commercial - Tenant Improvement/Remodel
Ready for Issuance
CITY OF PUYALLUP
Alteration/Remodel
Library tenant improvement of "Teen Zone" on Level 2. Remodel of existing teen lounge to include new shelving wall, new lighting, new study cubbies, and new study room. - LIBRARY TEEN ZONE
01/30/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 03/25/2024 03/18/2024
Building Review Approved 03/25/2024 03/12/2024
Engineering Review Approved 03/25/2024 03/12/2024
Planning Review Approved 03/25/2024 03/12/2024
Building Review Failed 02/29/2024 02/28/2024
Fire Review Approved 02/29/2024 02/22/2024
Planning Review Approved 02/29/2024 02/15/2024
Engineering Review Approved 02/29/2024 02/01/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/19/2024
Mechanical Duct Work Fee $19.55 $19.55 Paid 03/19/2024
Building Permit Fee $2,180.95 $2,180.95 Paid 03/19/2024
Mechanical Permit Fee $40.00 $40.00 Paid 03/19/2024
Building Plan Review Fee $1,417.62 $1,417.62 Paid 01/31/2024
Mechanical Plan Review Fee $38.71 $38.71 Paid 01/31/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 03/19/2024
Resubmittal Fee $180.00 $180.00 Paid 03/07/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Ready to Issue - Need Business License Endorsement Open Development & Permitting Services Prior to Issuance
: Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Contractor Info Open Development & Permitting Services Prior to Issuance
: Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.