Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 06/17/2024 |
AC Unit Fee | $97.75 | $97.75 | Paid | 06/17/2024 |
Gas Piping (Mechanical) Fee | $6.30 | $6.30 | Paid | 05/10/2024 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 06/17/2024 |
Ventilation System (apart from Heating/AC) Fee | $14.10 | $14.10 | Paid | 06/17/2024 |
Building Permit Fee | $5,133.75 | $5,133.75 | Paid | 06/17/2024 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 06/17/2024 |
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 05/10/2024 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 06/17/2024 |
Garbage Disposal Fee | $13.00 | $13.00 | Paid | 06/17/2024 |
Gas Piping (Plumbing) Fee | $46.50 | $46.50 | Paid | 06/17/2024 |
Water Heater Fee | $13.00 | $13.00 | Paid | 06/17/2024 |
Building Plan Review Fee | $3,336.94 | $3,336.94 | Paid | 05/10/2024 |
Mechanical Plan Review Fee | $118.40 | $118.40 | Paid | 05/10/2024 |
Plumbing Plan Review Fee | $90.03 | $90.03 | Paid | 05/10/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 06/17/2024 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $4,759.70 | $4,759.70 | Paid | 06/17/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $14,049.47 | $14,049.47 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Underfloor Inspection | Not Ready | 8/1/2024 | 8/1/2024 | 08/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/01/2024
cancelled by contractor
|
||||
Underfloor Inspection | Not Ready | 8/2/2024 | 8/2/2024 | 08/02/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/02/2024
no test on pipe several leaks
|
||||
Underfloor Inspection | Not Ready | 8/5/2024 | 8/5/2024 | 08/05/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Slab/Insulation Inspection | Passed w/ Conditions | 8/7/2024 | 8/7/2024 | 08/07/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/07/2024
approved slab pour back with poly fixed and no dirt showing as discussed with contractor
|
||||
Mechanical Rough In Inspection | Not Ready | 8/29/2024 | 8/29/2024 | 08/30/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/29/2024
1. remove insulation of duct work to perform inspection
|
||||
Mechanical Rough In Inspection | Partial Pass | 9/6/2024 | 9/6/2024 | 09/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/06/2024
date of inspection 8/29/2024
1. remove insulation of duct work to perform inspection
|
||||
Other/Miscellaneous
Carried Forward
09/06/2024
ok to insulate ductwork
|
||||
Mechanical Rough In Inspection | Not Ready | 9/19/2024 | 9/19/2024 | 09/19/2024 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 9/19/2024 | 9/19/2024 | 09/19/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/19/2024
1 ; provide top track attachment detail from architect for light sheft soffit at rooms-(100A,114,127,132A ) as discusssed with contractor.
2 ; all other areas complete.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 9/23/2024 | 9/23/2024 | 09/23/2024 |
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | Partial Pass | 9/24/2024 | 9/24/2024 | 09/24/2024 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Passed w/ Conditions | 9/27/2024 | 9/27/2024 | 09/27/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/08/2024
1:will need shannon to approve drywall as all rock has been taped and mudded and super not sure what needed to be looked at.
|
||||
Fire Or Smoke Damper Inspection | VOID | 11/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 11/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 11/20/2024 | ||
David Drake ((253) 864-4171) | ||||
Fire Final Inspection | Not Ready | 11/20/2024 | 11/20/2024 | 11/20/2024 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Resolved
11/21/2024
1. Provide L&i final for emergency lighting circuit.
2. Provide adequate emergency lighting for egress requirements.
|
||||
Plumbing Final Inspection | Failed | 11/25/2024 | 11/25/2024 | 11/25/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/25/2024
1 ; see Building final inspection for corrections.
|
||||
Mechanical Final Inspection | Failed | 11/25/2024 | 11/25/2024 | 11/25/2024 |
Shannon King ((253) 840-6684) | ||||
Building Final Inspection | Failed | 11/25/2024 | 11/25/2024 | 11/25/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/25/2024
1 ; provide service plug at heat pump on roof.
2 ; provide balance report with o.s.a. at time of mechanical final.
3 ; provide ladder to inspect water heater.
4 ; complete install of coffee maker as discussed with contractor.
5 ; toilet to be min. 16'' - 18'' from wall to centerline of toilet as per City approved plans.
6 ; complete install of all doors.
7 ; complete install of restroom grab bars as per city approved plans.
8 ; provide D.O.H. prewalk inspection prior to final.
|
||||
Comment Building Div Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Footing/Setback Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Foundation/Rebar Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Block Wall Rebar Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Shear Wall Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Firewall/Firestop Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Re-Roof Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Gas Test Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Carbon Monoxide Detectors Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Refrigeration Line Test Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Exhaust/Vent Fans Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Underfloor Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Frame Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/19/2024
1 ; provide top track attachment detail from architect for light sheft soffit at rooms-(100A,114,127,132A ) as discusssed with contractor.
2 ; all other areas complete.
|
||||
Energy (Insulation) Inspection | VOID | 12/16/2024 | ||
Joyce Kennedy ((253) 841-5405) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• RTU’S over 2000cfm will be required to be tested for shut down
• Fire extinguishers required per code to be installed at time of Fire Final
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
Certificate of Water Availability - Tacoma Water | Resolved | Prior to Issuance |
Engineering Division
A certificate of water availability is required from Tacoma Water, the site’s water purveyor. You can initiate the certificate request by contacting the Tacoma Water permit counter at 253-502-8247 or by emailing Waterpermitcounter@CityofTacoma.org. (PMC 14.22.020)
|
||
Frontage Improvements - Non-Residential Tenant Improvements | Resolved | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. The subject structure (4505 S MERIDIAN) is approximately 9.36% of the total square footage of structures on tax parcel 0419106022. 9.36% of the Pierce County Assessor's improvement value ($9,578,300) is approximately $896,990.55. The project qualifies as a substantial improvement and the $900,000 remodel value exceeds $500,000.
The City recently inspected the existing frontage and determined that frontage improvements already exist in accordance with the city’s standard specification. In accordance with Puyallup Municipal Code Chapter 11.08.135(6), the provisions of this section shall not apply where adequate frontage improvements: curbs, gutters, sidewalks, planter strips, storm drainage, street lighting, and paving already exist. Therefore, the condition has been resolved and frontage improvements are not required for this project. [Yianni Charitou @ 06/07/2024 8:23 AM]
|
Reference Number | Status | Type |
---|---|---|
PRSG20241621 | Closed | Sign/Awning |
Date Uploaded | File Type | Name |
---|---|---|
05/10/2024 | Receipt | Receipt for transaction:2024-000974 |
06/13/2024 | Plans | CONSTRUCTION PLAN SET (Stamped) |
06/13/2024 | Form | WESC (Stamped) |
06/13/2024 | Form | PLUMBING FIXTURE WORKSHEET (Stamped) |
06/17/2024 | Receipt | Receipt for transaction:2024-001280 |
06/17/2024 | Letter | Permit Job Card |
06/18/2024 | Permit | Permit - Detailed |
08/05/2024 | Report | Inspection Report (Underfloor Inspection) |
08/30/2024 | Report | Inspection Report (Mechanical Rough In Inspection) |
09/19/2024 | Report | Inspection Report (Mechanical Rough In Inspection) |
09/19/2024 | Report | Inspection Report (Frame Inspection) |
09/23/2024 | Report | Inspection Report (Wallboard / Drywall Inspection) |
09/24/2024 | Report | Inspection Report (Energy (Insulation) Inspection) |
11/25/2024 | Report | Inspection Report (Plumbing Final Inspection) |
11/25/2024 | Report | Inspection Report (Mechanical Final Inspection) |
11/25/2024 | Report | Inspection Report (Building Final Inspection) |
12/13/2024 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView