CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20240836


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20240836
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
Project scope: Tenant retail fixtures, paint and new restroom within an existing lease space. SHOE PALACE
05/21/2024
06/24/2024
07/13/2025

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
06/21/2024 CONSTRUCTION PLAN SET (Stamped)
06/21/2024 WSEC (Stamped)
06/21/2024 PLUMBING FIXTURE WORKSHEET (Stamped)
Review Type Outcome Est. Completion Date Completed
Fire Review Approved 06/21/2024 06/18/2024
Building Review Approved 06/21/2024 06/17/2024
Planning Review Approved 06/21/2024 05/28/2024
Engineering Review Approved 06/21/2024 05/23/2024
Engineering Traffic Review Approved 06/21/2024 05/22/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 06/24/2024
Building Permit Fee $1,777.75 $1,777.75 Paid 06/24/2024
Building Plan Review Fee $1,155.54 $1,155.54 Paid 05/21/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 06/24/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Underfloor Inspection Failed 9/17/2024 9/17/2024 09/18/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
09/18/2024
called in in error trying to get slab pour back but not ready, will install moisture barrier and slab dowels and recall insp

Frame Inspection Not Ready 9/17/2024 9/17/2024 09/18/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
09/18/2024
not ready, rough in plumb, mech and complete electrical

Foundation/Rebar Inspection Not Ready 9/23/2024 9/23/2024 09/23/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/23/2024
1 ;complete vapor barrier and slab dowels as discussed with contractor.

Combination Frame And Rough In Inspection Partial Pass 9/30/2024 9/30/2024 09/30/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 10/3/2024 10/3/2024 10/04/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/04/2024
retail side of retail storage wall and vestibule ok to mud

Exhaust/Vent Fans Inspection Partial Pass 10/4/2024 10/4/2024 10/04/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/04/2024
ok to cover/paint ducts in retail area.

Wallboard / Drywall Inspection Partial Pass 10/9/2024 10/9/2024 10/09/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/09/2024
rock approved minus lids.

Fire Final Inspection Not Ready 11/21/2024 11/21/2024 11/21/2024
David Drake ((253) 864-4171)
Other/Miscellaneous
Resolved
01/13/2025
Email was sent to contact listed on the permit Lance@mavacon.com on 11/21. Fire Sprinkler and Fire Alarm are required to be scheduled with Fire Final on or before. The Mall usually requires fire alarm to be done prior to the Mall opening. Work with Mall management for timing and schedule the Fire Alarm contractor to be onsite. Fire Alarm, Fire Sprinkler, and Fire Final all need to be called in.

Building Final Inspection Failed 11/26/2024 11/26/2024 11/26/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/26/2024
1:provide plans and permits for racking. 2:provide electrical finals, building and signs 3:provide sign finals 4:provide correct hardware at bathroom doors. 5:provide fire finals

Building Final Inspection Not Ready 12/5/2024 12/5/2024 12/05/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/05/2024
cancelled by contractor

Fire Final Inspection Partial Pass 12/6/2024 12/06/2024
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Resolved
01/13/2025
Email was sent to contact listed on the permit Lance@mavacon.com on 11/21. Fire Sprinkler and Fire Alarm are required to be scheduled with Fire Final on or before. The Mall usually requires fire alarm to be done prior to the Mall opening. Work with Mall management for timing and schedule the Fire Alarm contractor to be onsite. Fire Alarm, Fire Sprinkler, and Fire Final all need to be called in.

Building Final Inspection Partial Pass 12/6/2024 12/06/2024
Ray Cockerham ((253) 841-5585)
Fire Or Smoke Damper Inspection VOID 01/13/2025
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 01/13/2025
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 01/13/2025
David Drake ((253) 864-4171)
Erosion And Sediment Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Comment Engineering Div Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Block Wall Rebar Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Re-Roof Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Medical Gas Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Engineering Final Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Floodproof Certification Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Elevation Verification Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Underfloor Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
09/23/2024
1 ;complete vapor barrier and slab dowels as discussed with contractor.

Exhaust/Vent Fans Inspection VOID 01/14/2025
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Fire extinguishers required per code to be installed at time of Fire Final • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov

Related Permit & Planning Applications

Reference Number Status Type
PRFS20241435 Closed Fire Sprinklers
PRFA20241481 Closed Fire Alarms
PRSG20241650 Permit(s) Issued Sign/Awning
PRCTI20241831 Closed Commercial - Tenant Improvement/Remodel

Documents & Images

Date Uploaded File Type Name
01/14/2025 Report Inspection Report (Building Final Inspection)
01/17/2025 Other Certificate of Occupancy
05/21/2024 Receipt Receipt for transaction:2024-001061
06/21/2024 Plans CONSTRUCTION PLAN SET (Stamped)
06/21/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
06/21/2024 Form WSEC (Stamped)
06/24/2024 Letter Permit - Detailed
06/24/2024 Receipt Receipt for transaction:2024-001331
09/23/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/24/2024 Report Inspection Report (Slab/Insulation Inspection)
09/30/2024 Report Inspection Report (Combination Frame And Rough In Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.