Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 06/24/2024 |
Building Permit Fee | $1,777.75 | $1,777.75 | Paid | 06/24/2024 |
Building Plan Review Fee | $1,155.54 | $1,155.54 | Paid | 05/21/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 06/24/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $3,223.29 | $3,223.29 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Underfloor Inspection | Failed | 9/17/2024 | 9/17/2024 | 09/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/18/2024
called in in error
trying to get slab pour back but not ready, will install moisture barrier and slab dowels and recall insp
|
||||
Frame Inspection | Not Ready | 9/17/2024 | 9/17/2024 | 09/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/18/2024
not ready, rough in plumb, mech and complete electrical
|
||||
Foundation/Rebar Inspection | Not Ready | 9/23/2024 | 9/23/2024 | 09/23/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
09/23/2024
1 ;complete vapor barrier and slab dowels as discussed with contractor.
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 9/30/2024 | 9/30/2024 | 09/30/2024 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 10/3/2024 | 10/3/2024 | 10/04/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/04/2024
retail side of retail storage wall and vestibule ok to mud
|
||||
Exhaust/Vent Fans Inspection | Partial Pass | 10/4/2024 | 10/4/2024 | 10/04/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/04/2024
ok to cover/paint ducts in retail area.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 10/9/2024 | 10/9/2024 | 10/09/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/09/2024
rock approved minus lids.
|
||||
Fire Final Inspection | Not Ready | 11/21/2024 | 11/21/2024 | 11/21/2024 |
David Drake ((253) 864-4171) | ||||
Other/Miscellaneous
Resolved
01/13/2025
Email was sent to contact listed on the permit Lance@mavacon.com on 11/21. Fire Sprinkler and Fire Alarm are required to be scheduled with Fire Final on or before. The Mall usually requires fire alarm to be done prior to the Mall opening. Work with Mall management for timing and schedule the Fire Alarm contractor to be onsite. Fire Alarm, Fire Sprinkler, and Fire Final all need to be called in.
|
||||
Building Final Inspection | Failed | 11/26/2024 | 11/26/2024 | 11/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/26/2024
1:provide plans and permits for racking.
2:provide electrical finals, building and signs
3:provide sign finals
4:provide correct hardware at bathroom doors.
5:provide fire finals
|
||||
Building Final Inspection | Not Ready | 12/5/2024 | 12/5/2024 | 12/05/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
12/05/2024
cancelled by contractor
|
||||
Fire Final Inspection | Partial Pass | 12/6/2024 | 12/06/2024 | |
Ray Cockerham ((253) 841-5585) | ||||
Other/Miscellaneous
Resolved
01/13/2025
Email was sent to contact listed on the permit Lance@mavacon.com on 11/21. Fire Sprinkler and Fire Alarm are required to be scheduled with Fire Final on or before. The Mall usually requires fire alarm to be done prior to the Mall opening. Work with Mall management for timing and schedule the Fire Alarm contractor to be onsite. Fire Alarm, Fire Sprinkler, and Fire Final all need to be called in.
|
||||
Building Final Inspection | Partial Pass | 12/6/2024 | 12/06/2024 | |
Ray Cockerham ((253) 841-5585) | ||||
Fire Or Smoke Damper Inspection | VOID | 01/13/2025 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 01/13/2025 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 01/13/2025 | ||
David Drake ((253) 864-4171) | ||||
Erosion And Sediment Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Building Div Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Block Wall Rebar Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Ceiling Grid/T-Bar Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Re-Roof Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Hydronic Piping Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Engineering Final Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Floodproof Certification Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Elevation Verification Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Underfloor Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
09/23/2024
1 ;complete vapor barrier and slab dowels as discussed with contractor.
|
||||
Exhaust/Vent Fans Inspection | VOID | 01/14/2025 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Fire extinguishers required per code to be installed at time of Fire Final
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
Reference Number | Status | Type |
---|---|---|
PRFS20241435 | Closed | Fire Sprinklers |
PRFA20241481 | Closed | Fire Alarms |
PRSG20241650 | Permit(s) Issued | Sign/Awning |
PRCTI20241831 | Closed | Commercial - Tenant Improvement/Remodel |
Date Uploaded | File Type | Name |
---|---|---|
01/14/2025 | Report | Inspection Report (Building Final Inspection) |
01/17/2025 | Other | Certificate of Occupancy |
05/21/2024 | Receipt | Receipt for transaction:2024-001061 |
06/21/2024 | Plans | CONSTRUCTION PLAN SET (Stamped) |
06/21/2024 | Form | PLUMBING FIXTURE WORKSHEET (Stamped) |
06/21/2024 | Form | WSEC (Stamped) |
06/24/2024 | Letter | Permit - Detailed |
06/24/2024 | Receipt | Receipt for transaction:2024-001331 |
09/23/2024 | Report | Inspection Report (Foundation/Rebar Inspection) |
09/24/2024 | Report | Inspection Report (Slab/Insulation Inspection) |
09/30/2024 | Report | Inspection Report (Combination Frame And Rough In Inspection) |