Summary

PRCTI20241072
Commercial - Tenant Improvement/Remodel
Closed
WRI-URS SOUTH HILL LLC
Alteration/Remodel
NEW ENTRY FACADE/FEATURE FOR EXISTING RETAIL SPACE (#10), ALONG WITH NEW FULL-HEIGHT DEMISING WALL, NEW SEWER AND WATER LINES ALONG WITH ELECTRICAL RUNS (ALL TO BE CAPPED AT LOCATION OF FUTURE NEEDS). PREPPING SPACE FOR NEW TENANT (BY OTHERS) WHO WILL HAVE THEIR OWN TI PERMIT FOR ALL INTERIOR WORK. - 4102 S MERIDIAN, STE D1, PUYALLUP, WA 98373
07/03/2024
09/06/2024
08/04/2025
02/05/2025

Locations

Property
0419095021

4102 S MERIDIAN, STE D1, PUYALLUP, WA 98373

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 08/28/2024 09/03/2024
Engineering Review Approved 08/28/2024 08/22/2024
Engineering Traffic Review Approved 08/28/2024 08/22/2024
Fire Review Approved 08/28/2024 08/21/2024
Building Review Approved 08/28/2024 08/16/2024
Engineering Review Approved 08/06/2024 08/02/2024
Planning Review Approved 08/06/2024 07/31/2024
Fire Review Approved 08/06/2024 07/29/2024
Building Review Failed 08/06/2024 07/25/2024
Engineering Traffic Review Approved 08/06/2024 07/24/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 09/06/2024
Building Permit Fee $3,233.75 $3,233.75 Paid 09/06/2024
Building Plan Review Fee $2,101.94 $2,101.94 Paid 07/08/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 09/06/2024
Gas Piping (Plumbing) Fee $12.50 $12.50 Paid 09/06/2024
Plumbing Permit Fee $40.00 $40.00 Paid 09/06/2024
Plumbing Plan Review Fee $34.13 $34.13 Paid 09/06/2024
Resubmittal Fee $180.00 $180.00 Paid 08/13/2024
Outstanding Fees Amount Paid Owing Date Paid
Sewer System Development ChargeFee - Tenant Improvment/Addition $0.00 $0.00 Not payable Not Paid
Water System Development ChargeFee - Tenant Improvment/Addition $0.00 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Failed 9/24/2024 9/24/2024 09/24/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/24/2024
provide architects rfi on wall bracing/bridging, ok to 1 side at own risk, insp for demising wall only

Wallboard / Drywall Inspection Partial Pass 10/3/2024 10/3/2024 10/03/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/03/2024
demising wall frame ok and drywall on south side of wall ok.

Foundation/Rebar Inspection Partial Pass 10/4/2024 10/4/2024 10/04/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/04/2024
store front footings ok with special inspection.

Gas Test Inspection Not Ready 10/7/2024 10/7/2024 10/07/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/07/2024
date of inspection 10/7/2024 1. provide test on gas pipe as discussed with contractor 2.provide test on DWV at time of next inspection 3.did not go on roof 4. not a complete list

Plumbing Final Inspection Not Ready 10/8/2024 10/8/2024 10/08/2024
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Partial Pass 10/8/2024 10/08/2024
Jason Little ((253) 244-0387)
Combination Frame And Rough In Inspection Partial Pass 10/8/2024 10/8/2024 10/08/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 10/8/2024 10/8/2024 10/08/2024
Shannon King ((253) 840-6684)
Sidesewer Inspection Failed 10/8/2024 10/08/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/08/2024
Tie side sewer into main line upstream from the c/o and sample tee. Install a 6" sample tee upstream from the c/o. The c/o riser needs to be replaced. Install cap and adaptors for the risers. Install castings with lids that say sewer. The c/o and sample tee dimension may need to be adjusted to fit within excavation. Maintain separation for casting fitment.

Plumbing Below Slab Inspection Partial Pass 10/9/2024 10/9/2024 10/09/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/09/2024
1:4" main drain trunk at far south wall ok

Slab/Insulation Inspection Partial Pass 10/14/2024 10/14/2024 10/14/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
10/14/2024
Date of slab inspection 10/14/2024 1 ; vapor barrier and dowels complete at plumbing trenches.( except at restrooms )

Firewall/Firestop Inspection Passed 10/16/2024 10/16/2024 10/16/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
10/16/2024
head of wall ok

Frame Inspection Failed 10/23/2024 10/23/2024 10/24/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
10/24/2024
provide architects rfi on wall bracing/bridging, ok to 1 side at own risk, insp for demising wall only

Other/Miscellaneous
Carried Forward
10/24/2024
complete plumbing for hose bib and have on test, inspection for firred wall at front south corner.

Combination Frame And Rough In Inspection Partial Pass 10/24/2024 10/24/2024 10/24/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/24/2024
2 furred walls at front of store south side ok

Energy (Insulation) Inspection Partial Pass 10/24/2024 10/24/2024 10/24/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/24/2024
2 furred walls at front of store south side ok

Foundation/Rebar Inspection Not Ready 11/6/2024 11/6/2024 11/06/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/06/2024
insp for red iron entry 1:provide special inspectors approval for bolting and welding.

Frame Inspection Partial Pass 11/20/2024 11/20/2024 11/20/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/20/2024
infill frame at old entry ok.

Frame Inspection Partial Pass 11/27/2024 11/27/2024 11/27/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/27/2024
insp for store front facade 1:ok to sheath.

Frame Inspection Passed 12/3/2024 12/3/2024 12/03/2024
Monty Johnson ((253) 770-3326)
Gas Test Inspection Partial Pass 12/12/2024 12/12/2024 12/12/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/12/2024
date of inspection 10/7/2024 1. provide test on gas pipe as discussed with contractor 2.provide test on DWV at time of next inspection 3.did not go on roof 4. not a complete list

Other/Miscellaneous
Carried Forward
12/12/2024
test at 50 psi on both lines, no access to roof to see all the gas pipe.

Comment Engineering Div Inspection Failed 12/13/2024 12/13/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/13/2024
- Dilute, clean, and dry fire room floor. - Vac and jet entire storm system along the west and north side of the building and the outlet to the swale.

Fire Final Inspection Not Ready 12/16/2024 12/16/2024
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Outstanding
12/16/2024
Not Ready Talked with Boot Barn management, Brian Bennett, and Façade contractor. Use the exterior rear door for stocking until life safety is met overhead at front entrance.

Comment Engineering Div Inspection Not Ready 12/16/2024 12/16/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
12/16/2024
- Dilute, clean, and dry fire room floor. - Vac and jet entire storm system along the west and north side of the building and the outlet to the swale.

Gas Test Inspection Passed 12/18/2024 12/18/2024 12/18/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
12/12/2024
date of inspection 10/7/2024 1. provide test on gas pipe as discussed with contractor 2.provide test on DWV at time of next inspection 3.did not go on roof 4. not a complete list

Other/Miscellaneous
Outstanding
12/18/2024
gas test approved at 60 psi two lines.

Combination Frame And Rough In Inspection Not Ready 12/19/2024 12/19/2024 12/19/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/19/2024
1:provide architects complete plans on temp tunnel for tco

Fire Final Inspection Not Ready 1/16/2025 1/16/2025 01/16/2025
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Carried Forward
01/16/2025
Fire Alarm required to be signed off by L&i, then tested and approved prior to Building Final. Reschedule when shell space is complete.

Building Final Inspection Not Ready 1/17/2025 1/17/2025 01/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/17/2025
provide fire and engineering dept sign off prior to building final.

Engineering Final Inspection Passed w/ Conditions 1/29/2025 (9:00 to 10:00) 1/29/2025 01/29/2025
Jason Little ((253) 244-0387)
Building Final Inspection Failed 1/31/2025 1/31/2025 01/31/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/31/2025
seal hole in 1hr demising wall and have fire sign off

Exit Lighting Test Inspection Passed 1/30/2025 02/03/2025
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection VOID 02/03/2025
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 02/03/2025
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 02/03/2025
David Drake ((253) 864-4171)
Fire Final Inspection Passed 1/30/2025 02/03/2025
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Resolved
02/03/2025
Fire Alarm required to be signed off by L&i, then tested and approved prior to Building Final. Reschedule when shell space is complete.

Building Final Inspection Passed 2/5/2025 2/5/2025 02/05/2025
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Footing/Setback Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Roof Sheathing Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Shear Wall Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Ceiling Grid/T-Bar Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Hydronic Piping Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Refrigeration Line Test Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Exhaust Hood Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Light Test For Grease Duct Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Exhaust/Vent Fans Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Medical Gas Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Planning Final Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Wallboard / Drywall Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Plumbing Final Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Erosion And Sediment Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Sidesewer Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Corrections:


Other/Miscellaneous
Outstanding
10/08/2024
Tie side sewer into main line upstream from the c/o and sample tee. Install a 6" sample tee upstream from the c/o. The c/o riser needs to be replaced. Install cap and adaptors for the risers. Install castings with lids that say sewer. The c/o and sample tee dimension may need to be adjusted to fit within excavation. Maintain separation for casting fitment.

Plumbing Below Slab Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Slab/Insulation Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Corrections:


Other/Miscellaneous
Outstanding
10/14/2024
Date of slab inspection 10/14/2024 1 ; vapor barrier and dowels complete at plumbing trenches.( except at restrooms )

Energy (Insulation) Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Foundation/Rebar Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Comment Engineering Div Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)
Combination Frame And Rough In Inspection VOID 04/11/2025
Joyce Kennedy ((253) 841-5405)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. Address and Suite numbers required to be installed prior to Final. 2. Separate Fire Alarm and Fire Sprinkler permits required. 3. In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems. 4. Fire Alarm and Fire Sprinkler System to be redesigned for new demising wall.

Related Permit & Planning Applications

Reference Number Status Type
PRDE20240877 Closed Demolition
PRFA20241499 Closed Fire Alarms

Documents & Images

Date Uploaded File Type Name
07/05/2024 Letter Incomplete Application Notice
07/08/2024 Receipt Receipt for transaction:2024-001405
08/02/2024 Letter Permit Review Correction Letter
08/02/2024 Form 24-0701_Building Permit Application_4102 S Meridian (Flattened)
08/02/2024 Other 24-0705_Plumbing Permit Application (Flattened)
08/02/2024 Other 24-0705_Mechanical Permit Application (Flattened)
08/12/2024 Form CORRECTION RESPONSE LETTER
08/13/2024 Receipt Receipt for transaction:2024-001674
08/14/2024 Letter Incomplete Application Notice
09/04/2024 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
09/04/2024 Form ENERGY CODE WORKSHEET (Stamped)
09/04/2024 Report STRUCTURAL CALCS (Stamped)
09/04/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
09/04/2024 Form WATER AVAILABILITY (Stamped)
09/06/2024 Letter Permit - Detailed
09/06/2024 Receipt Receipt for transaction:2024-001854
10/07/2024 Report Inspection Report (Gas Test Inspection)
10/08/2024 Report Inspection Report (Plumbing Final Inspection)
10/08/2024 Report Inspection Report (Erosion And Sediment Inspection)
10/08/2024 Report Inspection Report (Combination Frame And Rough In Inspection)
10/08/2024 Report Inspection Report (Energy (Insulation) Inspection)
10/08/2024 Report Inspection Report (Sidesewer Inspection)
10/14/2024 Report Inspection Report (Slab/Insulation Inspection)
12/13/2024 Report Inspection Report (Comment Engineering Div Inspection)
12/16/2024 Report Inspection Report (Comment Engineering Div Inspection)
12/16/2024 Report Inspection Report (Comment Engineering Div Inspection)
01/29/2025 Report Inspection Report (Engineering Final Inspection)