CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20241103


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20241103
Commercial - Tenant Improvement/Remodel
Permit(s) Issued
WESTERN WASHINGTON FAIR ASSOCIATION
Alteration/Remodel
Creating a Japanese Remembrance Gallery space at the Washington State Fair Grounds. Project includes light framing (nonbearing), electrical (permit was pulled through L&I), finishes, overhead doors, storefront, and graphic design with temporary walls in one section to create a horse stall effect (110 9TH AVE SW)
07/10/2024
07/19/2024
01/19/2025

Locations

Property
0420331121

0420331121
110 9th Ave SW, Puyallup WA 98371

Reviews

Documents Returned For Corrections

Date Returned Name
07/19/2024 CONSTRUCTION PLAN SET (Stamped)
07/19/2024 SEISMIC DESIGN (Stamped)
Review Type Outcome Est. Completion Date Completed
Fire Review Approved 08/08/2024 07/18/2024
Building Review Approved 08/08/2024 07/15/2024
Planning Review VOID 08/08/2024 07/11/2024
Engineering Traffic Review VOID 08/08/2024 07/11/2024
Engineering Review VOID 08/08/2024 07/11/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 07/19/2024
Building Permit Fee $1,312.95 $1,312.95 Paid 07/19/2024
Building Plan Review Fee $853.42 $853.42 Paid 07/11/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/19/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Pending
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Pending
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection Pending
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Pending
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection Pending
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Pending
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Pending
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Pending
Monty Johnson ((253) 770-3326)
Exit Lighting Test Inspection Pending
David Drake ((253) 864-4171)
Hydronic Piping Inspection Pending
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection Pending
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection Pending
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection Pending
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection Pending
Monty Johnson ((253) 770-3326)
Medical Gas Inspection Pending
Monty Johnson ((253) 770-3326)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Building Final Inspection Pending
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Pending
Monty Johnson ((253) 770-3326)
Frame Inspection Pending
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Not Ready 7/22/2024 7/22/2024 07/22/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 7/23/2024 7/23/2024 07/23/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/23/2024
approved frame with shot pins completed at bottom plates abd with fairs ok on no acoustical insulation in new firred walls as per plan. new egress door will be installed with new store front.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov

Related Permit & Planning Applications

Reference Number Status Type
PRFS20241131 Permit(s) Issued Fire Sprinklers

Documents & Images

Date Uploaded File Type Name
07/19/2024 Plans CONSTRUCTION PLAN SET (Stamped)
07/11/2024 Receipt Receipt for transaction:2024-001430
07/19/2024 Plans SEISMIC DESIGN (Stamped)
07/19/2024 Letter Permit - Detailed
07/19/2024 Receipt Receipt for transaction:2024-001493
07/22/2024 Report Inspection Report (Comment Building Div Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.