Permit Application Status
PRCTI20241902
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 01/28/2025 |
AC Unit Fee | $39.10 | $39.10 | Paid | 01/28/2025 |
Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 01/28/2025 |
Exhaust Vent Fan (Bath) Fee | $28.20 | $28.20 | Paid | 01/28/2025 |
Gas Piping (Mechanical) Fee | $6.30 | $6.30 | Paid | 12/11/2024 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 01/28/2025 |
Ventilation System (apart from Heating/AC) Fee | $14.10 | $14.10 | Paid | 01/28/2025 |
Building Permit Fee | $2,225.75 | $2,225.75 | Paid | 01/28/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 01/28/2025 |
Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $40.25 | Paid | 01/28/2025 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 01/28/2025 |
Water Heater Fee | $13.00 | $13.00 | Paid | 01/28/2025 |
Building Plan Review Fee | $1,446.74 | $1,446.74 | Paid | 12/11/2024 |
Mechanical Plan Review Fee | $107.77 | $107.77 | Paid | 12/11/2024 |
Plumbing Plan Review Fee | $60.61 | $60.61 | Paid | 12/11/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 01/28/2025 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $865.40 | $865.40 | Paid | 01/28/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/20/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/19/2025 |
Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 06/06/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $6,155.32 | $6,155.32 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Not Ready | 2/12/2025 | 2/12/2025 | 02/12/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 2/19/2025 | 2/19/2025 | 02/19/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Plumbing Rough In Inspection | Partial Pass | 2/21/2025 | 2/21/2025 | 02/21/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/21/2025
below slab plumbing approved.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 2/24/2025 | 2/24/2025 | 02/24/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/24/2025
1:approved all but plumbing walls and security room, will need architects attachment detail for concrete board on lid
|
||||
Slab/Insulation Inspection | Passed | 2/25/2025 | 2/25/2025 | 02/25/2025 |
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Passed | 2/28/2025 | 2/28/2025 | 02/28/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Not Ready | 3/4/2025 | 3/4/2025 | 03/04/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 3/6/2025 | 3/6/2025 | 03/06/2025 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 3/7/2025 | 3/7/2025 | 03/07/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/07/2025
bathroom walls approved
|
||||
Mechanical Rough In Inspection | Not Ready | 3/17/2025 | 3/17/2025 | 03/17/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 3/27/2025 | 3/27/2025 | 03/27/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/27/2025
public, private restrooms and security rm hard lids ok
|
||||
Mechanical Rough In Inspection | Partial Pass | 3/27/2025 | 3/27/2025 | 03/27/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/27/2025
ductwork at hardlids approved, bathrooms and security rm.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 4/3/2025 | 4/3/2025 | 04/03/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/03/2025
bathroom ceiling drywall approved
|
||||
Wallboard / Drywall Inspection | Passed | 4/4/2025 | 4/4/2025 | 04/04/2025 |
Monty Johnson ((253) 770-3326) | ||||
Planning Final Inspection | VOID | 04/25/2025 | ||
Jillian Hulse-Lew ((253) 770-3330) | ||||
Frame Inspection | Not Ready | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/12/2025
1 ; provide city approved plans on-site at time of inspection.
not ready
|
||||
Mechanical Rough In Inspection | Partial Pass | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Shannon King ((253) 840-6684) | ||||
Engineering Final Inspection | Not Ready | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/14/2025
reconnect the roof drain over the ADA ramp
|
||||
Engineering Final Inspection | Passed | 5/14/2025 | 5/14/2025 | 05/14/2025 |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/14/2025
reconnect the roof drain over the ADA ramp
|
||||
Comment Engineering Div Inspection | Passed | 05/14/2025 | ||
Michael Rosenau ((253) 344-6753) | ||||
Frame Inspection | Not Ready | 5/20/2025 | 5/20/2025 | 05/20/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/20/2025
1 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling.
not ready
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 5/20/2025 | 5/20/2025 | 05/20/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/20/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 5/21/2025 | 05/21/2025 | |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/21/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Other/Miscellaneous
Carried Forward
05/21/2025
SEE 5/20 comments
1) Cloud installations; plans provided clear details regarding the all thread and the channel around the all thread below the unistrut framing. Review with engineer all thread bracing above the unistrut to the roof deck.
2) okay to place differs and grills; inspection required
3) Complete perimeter wire main room above exit sign.
See framing inspection 5/21 for beams
|
||||
Frame Inspection | Partial Pass | 5/21/2025 | 5/21/2025 | 05/21/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/21/2025
1 ; provide city approved plans on-site at time of inspection.
not ready
|
||||
Other/Miscellaneous
Carried Forward
05/21/2025
Inspection of beams per plan, bracing and truss splices. Approved to proceed.
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 5/21/2025 | 5/21/2025 | 05/21/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/21/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Other/Miscellaneous
Carried Forward
05/21/2025
SEE 5/20 comments
1) Cloud installations; plans provided clear details regarding the all thread and the channel around the all thread below the unistrut framing. Review with engineer all thread bracing above the unistrut to the roof deck.
2) okay to place differs and grills; inspection required
3) Complete perimeter wire main room above exit sign.
See framing inspection 5/21 for beams
|
||||
Frame Inspection | Passed | 5/28/2025 | 5/28/2025 | 05/28/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/28/2025
Inspection of beams per plan, bracing and truss splices. Approved to proceed.
|
||||
Exit Lighting Test Inspection | Passed | 6/4/2025 | 6/4/2025 | 06/04/2025 |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 06/04/2025 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 06/04/2025 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 06/04/2025 | ||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Passed | 6/4/2025 | 6/4/2025 | 06/04/2025 |
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | Not Ready | 6/5/2025 | 6/5/2025 | 06/05/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Not Ready | 6/6/2025 | 6/6/2025 | 06/06/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/06/2025
1 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling.
not ready
|
||||
Frame Inspection | Passed | 6/7/2025 | 6/7/2025 | 06/08/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
06/08/2025
1 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling.
not ready
|
||||
Mechanical Rough In Inspection | Partial Pass | 6/9/2025 | 6/9/2025 | 06/09/2025 |
Shannon King ((253) 840-6684) | ||||
Fire Final Inspection | Passed | 6/10/2025 | 6/10/2025 | 06/10/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 6/10/2025 | 6/10/2025 | 06/10/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/10/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Other/Miscellaneous
Carried Forward
06/10/2025
SEE 5/20 comments
1) Cloud installations; plans provided clear details regarding the all thread and the channel around the all thread below the unistrut framing. Review with engineer all thread bracing above the unistrut to the roof deck.
2) okay to place differs and grills; inspection required
3) Complete perimeter wire main room above exit sign.
See framing inspection 5/21 for beams
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 6/11/2025 | 6/11/2025 | 06/11/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/11/2025
1 ; complete mechanical rough-in of ducts and positive attachment of diffusers to main and cross tee at ceiling.
2 ; provide permit for gas piping and provide test prior to ceiling cover.
3 ; complete all ceiling grid requirements as per city approved plans as noted on last ceiling grid inspection.
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 6/12/2025 | 6/12/2025 | 06/12/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/12/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Other/Miscellaneous
Carried Forward
06/12/2025
SEE 5/20 comments
1) Cloud installations; plans provided clear details regarding the all thread and the channel around the all thread below the unistrut framing. Review with engineer all thread bracing above the unistrut to the roof deck.
2) okay to place differs and grills; inspection required
3) Complete perimeter wire main room above exit sign.
See framing inspection 5/21 for beams
|
||||
Other/Miscellaneous
Carried Forward
06/12/2025
1 ; complete all ceiling grid corrections from ceiling inspection dated 6-11-2025
not ready
|
||||
Ceiling Grid/T-Bar Inspection | Passed | 6/13/2025 | 6/13/2025 | 06/13/2025 |
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | Passed | 6/17/2025 | 6/17/2025 | 06/17/2025 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Not Ready | 6/20/2025 | 6/20/2025 | 06/21/2025 |
Ted Christie ((253) 507-0191) | ||||
Building Final Inspection | Partial Pass | 6/20/2025 | 6/20/2025 | 06/21/2025 |
Ted Christie ((253) 507-0191) | ||||
Mechanical Final Inspection | Failed | 6/24/2025 | 6/24/2025 | 06/24/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/24/2025
1 ; paint gas pipe at RTU"S on roof.
2 ; provide min. 10' from plumbing vent to air intake of RTU or extend plumbing vent 2' above air intake and brace vent to parapet of building.
3 ; provide balance report with min. OSA as required per city approved plans.
4 ; complete labeling of roof top equipment with suite number as discussed with contractor.
5 ; provide positive attachment or heat pump to roof as discussed with contractor.
6 ; provide ladder for roof top access at time of next inspection.
|
||||
Building Final Inspection | Failed | 6/24/2025 | 6/24/2025 | 06/24/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/01/2025
1 ; paint gas pipe at RTU"S on roof.
2 ; provide min. 10' from plumbing vent to air intake of RTU or extend plumbing vent 2' above air intake and brace vent to parapet of building.
3 ; provide balance report with min. OSA as required per city approved plans.
4 ; complete labeling of roof top equipment with suite number as discussed with contractor.
5 ; provide positive attachment or heat pump to roof as discussed with contractor.
6 ; provide ladder for roof top access at time of next inspection.
7 ; complete install of all ceiling tiles.
|
||||
Fire Alarm Final Inspection | Passed | 6/23/2025 | 6/23/2025 | 06/25/2025 |
David Drake ((253) 864-4171) | ||||
Mechanical Final Inspection | Failed | 6/26/2025 | 6/26/2025 | 06/26/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/26/2025
1 ; paint gas pipe at RTU"S on roof.
2 ; provide min. 10' from plumbing vent to air intake of RTU or extend plumbing vent 2' above air intake and brace vent to parapet of building.
3 ; provide balance report with min. OSA as required per city approved plans.
4 ; complete labeling of roof top equipment with suite number as discussed with contractor.
5 ; provide positive attachment or heat pump to roof as discussed with contractor.
6 ; provide ladder for roof top access at time of next inspection.
|
||||
Other/Miscellaneous
Carried Forward
06/26/2025
1 ; complete correction from last mechanical inspection. (items - 2,3,5,6,)
2 ; secure RTU'S to curb adapter as discussed with contractor.
|
||||
Building Final Inspection | Partial Pass | 6/26/2025 | 6/26/2025 | 06/26/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/26/2025
1 ; complete correction from last mechanical inspection. (items - 2,3,5,6,)
2 ; secure RTU'S to curb adapter as discussed with contractor.
T.C.O. approved for 10 working days from 6-26-2025
|
||||
Building Final Inspection | Passed | 7/1/2025 | 7/1/2025 | 07/01/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/01/2025
1 ; complete correction from last mechanical inspection. (items - 2,3,5,6,)
2 ; secure RTU'S to curb adapter as discussed with contractor.
T.C.O. approved for 10 working days from 6-26-2025
|
||||
Mechanical Final Inspection | Passed | 7/1/2025 | 7/1/2025 | 07/01/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/01/2025
1 ; paint gas pipe at RTU"S on roof.
2 ; provide min. 10' from plumbing vent to air intake of RTU or extend plumbing vent 2' above air intake and brace vent to parapet of building.
3 ; provide balance report with min. OSA as required per city approved plans.
4 ; complete labeling of roof top equipment with suite number as discussed with contractor.
5 ; provide positive attachment or heat pump to roof as discussed with contractor.
6 ; provide ladder for roof top access at time of next inspection.
|
||||
Other/Miscellaneous
Resolved
07/01/2025
1 ; complete correction from last mechanical inspection. (items - 2,3,5,6,)
2 ; secure RTU'S to curb adapter as discussed with contractor.
|
||||
Footing/Setback Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Foundation/Rebar Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Slab/Insulation Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Roof Sheathing Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Shear Wall Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Firewall/Firestop Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Energy (Insulation) Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Combination Frame And Rough In Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Hydronic Piping Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Carbon Monoxide Detectors Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Refrigeration Line Test Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Exhaust Hood Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Light Test For Grease Duct Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Exhaust/Vent Fans Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Medical Gas Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Comment Building Div Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Mechanical Rough In Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Ceiling Grid/T-Bar Inspection | VOID | 07/01/2025 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/12/2025
1 ; provide electrical cover approval prior to ceiling grid inspection.
2 ; complete rough-in of all mechanical and install of diffusers.
3 ; provide complete set of city approved plans with all revisions for framing above suspended ceiling. (provide frame approval prior to ceiling grid approval)
4 ; complete all ceiling grid requirements as discussed with contractor.
not ready
.
|
||||
Other/Miscellaneous
Outstanding
06/12/2025
SEE 5/20 comments
1) Cloud installations; plans provided clear details regarding the all thread and the channel around the all thread below the unistrut framing. Review with engineer all thread bracing above the unistrut to the roof deck.
2) okay to place differs and grills; inspection required
3) Complete perimeter wire main room above exit sign.
See framing inspection 5/21 for beams
|
||||
Other/Miscellaneous
Outstanding
06/12/2025
1 ; complete all ceiling grid corrections from ceiling inspection dated 6-11-2025
not ready
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down with Fire Alarm
• Fire extinguishers required per code to be installed at time of Fire Final
• In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
Reference Number | Status | Type |
---|---|---|
PRMH20250755 | Permit(s) Issued | Mechanical - COMMERCIAL ONLY |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.