CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20251592


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20251592
Commercial - Tenant Improvement/Remodel
In Plan Check
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
Non-structural exterior and interior remodel of existing Applebee’s restaurant. Exterior scope includes painting existing brick and metal trim, adding Nichiha siding at entry, removal of entry ‘dog house’ roof, and replacing exterior light fixtures. Interior scope includes replacement of wall coverings, interior paint, selective flooring replacement, ceiling panel replacement at bar, and lighting fixture replacement; no kitchen/BOH changes. No change to use, egress, height, or area. - APPLEBEE'S
12/04/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review VOID 01/22/2026 01/21/2026
Engineering Traffic Review Approved 01/22/2026 01/15/2026
Planning Review Approved 01/22/2026 01/13/2026
Design Review Failed 01/22/2026 01/13/2026
Building Review Failed 01/22/2026 01/09/2026
Fire Review Pending 01/22/2026

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $1,712.46 $1,712.46 Paid 12/04/2025
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Building Permit Fee $2,634.55 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of Puyallup if fire alarm equipped • L&I Final required prior to Fire Final • Exit lighting test required contractor to provide light meter • Address required on building • A separate permit may be required if fire alarm or sprinkler system is altered • Fire Sprinkler and Fire Alarm systems required to have all maintenance up to date prior to Final • Fire extinguishers required per code and must be with in a compliant date range • A Knox box is required at the front entry on the exterior of the building if fire sprinkler equipped • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Ready to Issue - Need Contractor Info Open Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Business License Endorsement Open Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
12/04/2025 Receipt Receipt for transaction:2025-002302
12/05/2025 Letter Incomplete Submittal Notice
12/31/2025 Letter Incomplete Submittal Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.