Permit Application Status

PRDE20210043


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRDE20210043
Demolition
Permit(s) Issued
ANNON ROBERT R
Demolition
Demolition of residential house and any detached garages or outbuildings to prepare for commercial development.
12/15/2021
01/12/2022
01/12/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 12/31/2021 01/10/2022
Building Review Approved 12/31/2021 12/29/2021
Engineering Review Approved 12/31/2021 12/22/2021

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Demolition Final Inspection Pending
Gary Webster ((253) 841-5590)
Utility Capping Inspection Pending
Engineering Final Inspection Pending
Comment Engineering Div Inspection Pending
Erosion And Sediment Inspection Partial Pass 2/22/2022 2/22/2022 02/22/2022
Michael Rosenau ((253) 841-5411)
Utility Capping Inspection Failed 7/27/2022 07/27/2022
Jason Little ((253) 435-3636)
Engineering Final Inspection Not Ready 9/8/2022 09/14/2022
Michael Rosenau ((253) 841-5411)
Comment Engineering Div Inspection Partial Pass 8/14/2023 08/14/2023
Michael Rosenau ((253) 841-5411)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Standard Conditions
: ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICED TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPSTREAM OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. ** Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. ** Prior to starting site work, request an erosion and sediment inspection through the CityView portal. * I agree to call the Utility Notification Center at 1-800-424-5555 (811) before beginning any excavation. Call before you dig, it's the law. * The applicant is responsible to decommission the existing septic system per P.C.H.D. requirements. A decommissioning certificate is required to be filed with P.C.H.D. and a copy submitted to the City of Puyallup. * The applicant is responsible to decommission the existing private well per P.C.H.D. requirements. A decommissioning certificate is required to be filed with P.C.H.D. and a copy submitted to the City of Puyallup. * If the existing private well is to be retained it will be necessary to install a RPBA on the domestic water service connection to the City's system. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.

Related Permit & Planning Applications

There are no related items for this permit application.