CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRDE20221756
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee (Demolition) | $391.25 | $391.25 | Paid | 11/15/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $391.25 | $391.25 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Partial Pass | 12/14/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Utility Capping Inspection | Partial Pass | 12/14/2022 | 12/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Utility Capping Inspection | Failed | 1/11/2023 | 01/11/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
01/11/2023
The applicant shall demolish the existing private well per Tacoma Pierce County Health Department standards or install an approved reduced pressure backflow device on the City water service. A well decommissioning certificate shall be filed with Pierce County and a copy submitted to the City of Puyallup.
|
||||
Other/Miscellaneous
Carried Forward
01/11/2023
demo the septic tank
|
||||
Utility Capping Inspection | Failed | 2/10/2023 | 2/10/2023 | 02/10/2023 |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
02/10/2023
The applicant shall demolish the existing private well per Tacoma Pierce County Health Department standards or install an approved reduced pressure backflow device on the City water service. A well decommissioning certificate shall be filed with Pierce County and a copy submitted to the City of Puyallup.
|
||||
Other/Miscellaneous
Resolved
02/10/2023
demo the septic tank
|
||||
Engineering Final Inspection | Failed | 2/10/2023 | 2/10/2023 | 02/10/2023 |
Jeff Hill ((253) 204-5633) | ||||
Demolition Final Inspection | Not Ready | 2/10/2023 | 2/10/2023 | 02/10/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
02/10/2023
1. provide approved engineering inspection prior to calling in this inspection
2. not ready
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Demolition Standard Conditions | Resolved | Standard Conditions | |||
:
Development Engineering standard demolition conditions:
** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work.
2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law.
Site-specific Conditions:
- The applicant shall demolish the existing private well per Tacoma Pierce County Health Department standards or install an approved reduced pressure backflow device on the City water service. A well decommissioning certificate shall be filed with Pierce County and a copy submitted to the City of Puyallup.
- The applicant is responsible to demolish the existing septic system per Tacoma Pierce County Health Department standards. A septic decommissioning certificate is required to be filed with Pierce County and a copy submitted to the City of Puyallup.
- If an underground tank is discovered it will be decommissioned prior to receiving a final approval of this permit
I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
01/11/2023 | Report | Inspection Report (Utility Capping Inspection) |
02/10/2023 | Report | Inspection Report (Demolition Final Inspection) |
02/10/2023 | Report | Inspection Report (Engineering Final Inspection) |
02/10/2023 | Report | Inspection Report (Utility Capping Inspection) |
11/15/2022 | Plans | CITY MAST PERM APP |
11/15/2022 | Receipt | Receipt for transaction:2022-002269 |
11/15/2022 | Plans | TPCHD Septic decom app |
12/01/2022 | Other | 1106 valley ave nw psapca (Stamped) |
12/01/2022 | Plans | 1106 Valley permit site (Stamped) |
12/01/2022 | Permit | Permit - Detailed |
12/01/2022 | Letter | Permit Job Card |
12/01/2022 | Plans | SEDIMENT AND EROSION CONTROL (Stamped) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView