CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRDE20240287


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRDE20240287
Demolition
Closed
PARSON LARRY A & BRENDA R
Demolition
DEMO BARN & SHED ON PROPERTY
02/25/2024
03/07/2024
09/18/2024
03/22/2024

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
03/07/2024 SITE PLAN (Stamped)
03/07/2024 PSCA (Stamped)
Review Type Outcome Est. Completion Date Completed
Planning Review Approved 03/18/2024 03/06/2024
Engineering Review Approved 03/18/2024 03/04/2024
Building Review Approved 03/18/2024 02/28/2024

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Demolition Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
03/21/2024
1 ; provide engineering final prior to building final inspection approval.

Erosion And Sediment Inspection Failed 3/13/2024 3/13/2024 03/13/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/13/2024
1. Install silt fence around the work area. 2. Install a construction entrance

Utility Capping Inspection Failed 3/13/2024 3/13/2024 03/13/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/13/2024
All utilities must be capped from their source away from the demolition.

Job Start Inspection Not Ready 3/13/2024 3/13/2024 03/13/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Partial Pass 3/18/2024 3/18/2024 03/18/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/18/2024
fix the overlap on the silt fence in a couple of areas. backfill the silt fence bottom in a few areas.

Utility Capping Inspection Passed 3/18/2024 3/18/2024 03/18/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Resolved
03/18/2024
All utilities must be capped from their source away from the demolition.

Job Start Inspection Passed 3/18/2024 3/18/2024 03/18/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Not Ready 3/21/2024 3/21/2024 03/21/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/21/2024
stabilize soils then remove silt fence.

Engineering Final Inspection Not Ready 3/21/2024 3/21/2024 03/21/2024
Jeff Hill ((253) 204-5633)
Demolition Final Inspection Failed 3/21/2024 3/21/2024 03/21/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/21/2024
1 ; provide engineering final prior to building final inspection approval.

Engineering Final Inspection Passed 3/22/2024 3/22/2024 03/22/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Passed 3/22/2024 3/22/2024 03/22/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Outstanding
03/21/2024
stabilize soils then remove silt fence.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard demolition conditions: 1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: ** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** If any water or sewer connections are located during the demolition of the two buildings contact the engineering inspector for proper cutting and capping of the utility ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the Stormwater Fact Sheet and City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. Attached in CityView ** I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Miscellaneous Condition Resolved
Development & Permitting Services
Demolition or clearing must be limited to within 5' of all structures and  a high-visibility fence must be erected along this perimeter. Please refer to the high-visibility fencing detail.

Related Permit & Planning Applications

Reference Number Status Type
PLPRE20240013 File Closed Pre-Application
PLSHP20250022 Waiting for Revisions Short Plat

Documents & Images

Date Uploaded File Type Name
03/07/2024 Form Application for Demolition Permit (Flattened)
03/07/2024 Plans SITE PLAN (Stamped)
03/07/2024 Other PSCA (Stamped)
03/07/2024 Permit Permit - Detailed
03/07/2024 Letter Permit Job Card
03/13/2024 Report Inspection Report (Erosion And Sediment Inspection)
03/13/2024 Report Inspection Report (Utility Capping Inspection)
03/13/2024 Report Inspection Report (Job Start Inspection)
03/18/2024 Report Inspection Report (Erosion And Sediment Inspection)
03/18/2024 Report Inspection Report (Utility Capping Inspection)
03/18/2024 Report Inspection Report (Job Start Inspection)
03/21/2024 Report Inspection Report (Erosion And Sediment Inspection)
03/21/2024 Report Inspection Report (Engineering Final Inspection)
03/21/2024 Report Inspection Report (Demolition Final Inspection)
03/22/2024 Report Inspection Report (Engineering Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.