Engineering Review
|
Approved
|
02/27/2025
|
02/25/2025
|
|
|
|
See Document Markup
Place street names on site plan [Site plan]
|
|
See Document Markup
|
Fire Review
|
Approved
|
02/27/2025
|
02/18/2025
|
|
|
Building Review
|
Approved
|
02/27/2025
|
02/12/2025
|
|
|
|
See Document Markup
Provide specifics of the plywood that will be installed which should include plywood thickness, grade and any other specifics that will reflect that the plywood will withstand the dead and live loads of the deck. Identify the non-slip surface that will either be provided on the plywood or will be added to the plywood as part of construction, as notated on sheet A1.0, Owner/Contractor Coordination Notes.
The existing joist spacing should also be considered when selecting the plywood material that will be used. Please provide the existing joist spacing.
Updated all details and notes as needed to reflect the requested information.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Determine the minimum required specifications for deck beams, posts, post bases, post caps and footings if replacements are necessary. Given the work already completed and the stop-work order in place, establish a clear benchmark to assess the completed work and provide clarity for future construction and inspection, minimizing any potential ambiguities.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Deck joists appear to be sloped to drain off of the cantilevered side of each deck based upon details 1 and 2. Detail 2 shows the installation of the 1x6 cedar board over the existing 2x2 balusters. detail or notate how the 1x6 cedar will be installed to prevent drainage and water accumulation on the deck surface.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Add a notation on either Sheet A1.0 or A1.1 that contractor shall verify the integrity of balusters prior to the installation of the 1x6 cedar. Establish the parameters of the balusters replacement to include type, grade and nailing pattern.
(Construction Plans, Sheet A1.1)
|
Planning Review
|
Approved
|
02/27/2025
|
02/12/2025
|
|
|
Engineering Review
|
Failed
|
01/09/2025
|
01/06/2025
|
|
|
|
See Document Markup
Place street names on site plan [Site plan]
|
|
See Document Markup
Revise the site plan to depict the new or existing public utility connections (i.e. water, sewer, stormwater) from the public right-of-way to the building(s). The sanitary side sewer connection should include the location of any sewer clean outs, the water connection should include the location of the meter boxes and backflow prevention devices, and the stormwater connection should include the location of any clean outs and onsite stormwater systems.
|
Planning Review
|
Approved
|
01/09/2025
|
12/30/2024
|
|
|
Building Review
|
Failed
|
01/09/2025
|
12/19/2024
|
|
|
|
See Document Markup
Provide specifics of the plywood that will be installed which should include plywood thickness, grade and any other specifics that will reflect that the plywood will withstand the dead and live loads of the deck. Identify the non-slip surface that will either be provided on the plywood or will be added to the plywood as part of construction, as notated on sheet A1.0, Owner/Contractor Coordination Notes.
The existing joist spacing should also be considered when selecting the plywood material that will be used. Please provide the existing joist spacing.
Updated all details and notes as needed to reflect the requested information.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Determine the minimum required specifications for deck beams, posts, post bases, post caps and footings if replacements are necessary. Given the work already completed and the stop-work order in place, establish a clear benchmark to assess the completed work and provide clarity for future construction and inspection, minimizing any potential ambiguities.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Deck joists appear to be sloped to drain off of the cantilevered side of each deck based upon details 1 and 2. Detail 2 shows the installation of the 1x6 cedar board over the existing 2x2 balusters. detail or notate how the 1x6 cedar will be installed to prevent drainage and water accumulation on the deck surface.
(Construction Plans, Sheet A1.1)
|
|
See Document Markup
Add a notation on either Sheet A1.0 or A1.1 that contractor shall verify the integrity of balusters prior to the installation of the 1x6 cedar. Establish the parameters of the balusters replacement to include type, grade and nailing pattern.
(Construction Plans, Sheet A1.1)
|
Fire Review
|
Approved
|
01/09/2025
|