Summary

PRFUP20210061
Franchise Utility Permit
Closed
STEP BY STEP FAMILY SUPPORT CENTER
Utility
Retention secondary wire between P01 568014-156501 and P02 568007-156501
12/16/2021
01/13/2022
08/31/2022
03/04/2022

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 01/06/2022 01/13/2022

Fees

Paid Fees Amount Paid Owing Date Paid
E Franchise ROW Inspection Fee $130.00 $130.00 Paid 12/16/2021
Franchise Traffic Control Fee $90.00 $90.00 Paid 12/16/2021
ROW Permit Fee $80.00 $80.00 Paid 12/16/2021
Franchise Utility Review Fee $110.00 $110.00 Paid 12/16/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection VOID 03/04/2022
Cheryl Trimble ((253) 290-9834)
Engineering Final Inspection VOID 03/04/2022
Cheryl Trimble ((253) 290-9834)

Conditions

Condition Status Department Category Expiration Date Due Date
Private Utility Permit Conditions Open Standard Conditions
: APPLICANT/CONTRACTOR REQUIREMENTS: 1. PERMIT AND APPROVED TRAFFIC CONTROL PLAN ARE REQUIRED TO BE AVAILABLE AT JOB SITE. NOT HAVING A PERMIT ONSITE SHALL BE SUBJECT TO TRIPLE PERMIT FEE. 2. THE CITY SHALL BE NOTIFIED 24-48 HOURS PRIOR TO JOB START 3. THE CITY SHALL BE NOTIFIED WHEN ALL WORK AND RESTORATION IS COMPETE AND READY FOR FINAL INSPECTION. PRIOR TO RESTORATION, COORDINATE WITH AN INSPECTOR. *** SITE SPECIFIC CONDITIONS *** CLOSURE ALLOWED: Monday - Friday 9AM - 3PM Call communications center at 253-287-4456 on day of closure. The permit and traffic control plans shall be posted at the job site and available to inspectors at all times. Place ROAD WORK AHEAD signs on the Foothills Walking Trail on either side of railroad crossing. Call Jason Little, City Inspector, at 253-244-0387 prior to starting any work. All aerial crossings at an intersection shall be a maximum of 3 minutes. The applicant shall coordinate redundant traffic control devices with other traffic control plans authorized near this site. Work shall immediately cease in the work zone for a pedestrian spotter, available at all times, to escort pedestrians around the work area. All vehicles, equipment, and personnel are prohibited at all times from occupying any portion of the railroad crossing. Railroad crossing signs and striping shall be visible at all times. Vehicle and pedestrian traffic shall not be queued on the railroad crossing. GENERAL CONDITIONS: 1. Follow approved Traffic Control Plan (TCP) 2. Follow allowed work hours (example) Monday through Friday 9am-3pm 3. If a lane will be closed, call Comm Center on day of closure prior to work start at 253-841-5431. 4. Spotter must be available to assist with pedestrians if needed. 5. To schedule inspection, go to: Secure.cityofpuyallup.org and select appropriate code. 6. Please utilize traffic control information below for TCP: A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. 7. Do not open cut without prior approval. 8. Do not park vehicles on city sidewalk. Curb, gutter or sidewalk damaged shall be replaced. Inspection time performed during a regular 8-hour day Monday through Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three-hour minimum. INDEMNIFICATION / HOLD HARMLESS: The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
01/13/2022 Plans SITE 186060873 17X11 (Stamped)
01/13/2022 Plans TCP0 186060873 3303 8th Ave SE, Puyallup, WA (Stamped)
01/26/2022 Permit Permit - Detailed
12/16/2021 Receipt Receipt for transaction:2021-000032