Summary

PRFUP20220956
Franchise Utility Permit
Closed
SOUTHWEST CORNER PROPERTIES LLC
Utility
Comcast proposes to aerial tie-in at pole, pull RG11 down existing riser, proof and pull RG11 through existing underground conduit, approximately 60lf.
06/14/2022
06/24/2022
01/18/2023
07/22/2022

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 07/04/2022 06/23/2022

Fees

Paid Fees Amount Paid Owing Date Paid
E Franchise ROW Inspection Fee $130.00 $130.00 Paid 06/14/2022
Franchise Traffic Control Fee $90.00 $90.00 Paid 06/14/2022
ROW Permit Fee $80.00 $80.00 Paid 06/14/2022
Franchise Utility Review Fee $110.00 $110.00 Paid 06/14/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection VOID 07/22/2022
Jeff Hill ((253) 204-5633)
Close All Restoration Complete Inspection VOID 07/22/2022
Jeff Hill ((253) 204-5633)

Conditions

Condition Status Department Category Expiration Date Due Date
Private Utility Permit Conditions Open Standard Conditions
: Development Engineering standard franchise utility conditions: Site-specific Conditions: Applicant/Contractor Responsibility: 1. The issued permit and traffic control plan(s) are required to be available at the job site at all times. The applicant shall be subject to a triple permit fee for failing to have a valid permit on site. 2. The applicant/contractor shall notify the City 24-48 hours prior to starting work by requesting an inspection through the CityView portal. Weekend and night work require a minimum of 48 business hours’ advanced coordination with a City inspector. 3. The applicant/contractor shall notify the City prior to site restoration, immediately after all work and restoration are complete, and when the site is ready for final inspection. The applicant/contractor shall request a final inspection through the CityView portal prior to the permit expiration date. General Conditions: 1. Comply with all permit conditions and the Traffic Control Plans (TCP) issued by the City. 2. Follow the allowed work hours as listed on the issued permit or on each page of the TCP. 3. If a travel lane will be closed, the applicant/contractor shall call the Communications Center at 253-287-4456 prior to starting work on day of closure and again once the lane is reopened. 4. Spotter must be available to assist with pedestrians if needed. 5. Request all inspections through the CityView portal on the City website. 6. Please utilize the traffic control standards below in addition to the TCP: - Traffic control devices shall be 28 inch retro-reflective cones. - Taper length equals width of offset times speed limit squared divided by 60. - Sign spacing shall be 100 feet when speed limit is 30 mph or less. - Sign spacing shall be 350 feet when speed limit is greater than 30 mph. - Distance between cones equals speed limit in unit-feet. - Distance between signs is mandatory unless field conditions determine otherwise. - Travel lane width must be a minimum of 11 feet at all times. - Any and all flaggers and spotters shall remain in radio contact at all times. 7. Open cut is not permitted without prior approval from the City. 8. Do not park vehicles on City sidewalk. Any public curb, gutter, or sidewalk broken now or during the course of construction shall be removed and replaced per City Standards. 9. Inspections performed during a regular 8-hour day Monday through Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of these hours are charged to the permit holder at a rate of $130.00 per hour with a three-hour minimum. Indemnification / Hold Harmless: The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
06/14/2022 Receipt Receipt for transaction:2022-001110
06/24/2022 Form 1037754 - Private Utility ROW App0 (Flattened)
06/24/2022 Plans 1037754_KORUM LINCOLN_Design (Stamped)
06/24/2022 Plans 1037754_KORUM LINCOLN_TCP (Stamped)
06/24/2022 Permit Permit - Detailed
06/24/2022 Letter Permit Job Card