Permit Application Status
PRRWF20230497
| Paid Fees | Amount | Paid | Owing | Date Paid | 
|---|---|---|---|---|
| Building Permit Fee | $1,413.75 | $1,413.75 | Paid | 04/25/2023 | 
| Building Plan Review Fee | $918.94 | $918.94 | Paid | 04/20/2023 | 
| Resubmittal Fee | $180.00 | $180.00 | Paid | 09/05/2023 | 
| Outstanding Fees | Amount | Paid | Owing | Date Paid | 
| No outstanding fees. | ||||
| Totals: | $2,512.69 | $2,512.69 | $0.00 | 
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
            $0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected | 
|---|---|---|---|---|
| Footing/Setback Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Outstanding 12/21/2023 1.section 2 and 3 upper and lower walls approved to pour  
2. section 6 lower wall provide engineering or EOR approval for wall ht that exceeds max wall ht per city approved plans DO NOT POUR | ||||
| Footing/Setback Inspection | Not Ready | 5/30/2023 | 5/30/2023 | 05/30/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 05/30/2023 NO ONE ON SITE AT TIME OF INSPECTION 12:00 pm  | ||||
| Footing/Setback Inspection | Not Ready | 6/1/2023 | 6/1/2023 | 06/01/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Resolved 06/01/2023 NO ONE ON SITE AT TIME OF INSPECTION 12:00 pm | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 06/01/2023 1. provide step detail from engineer of record 
2.complete all rebar per city approved plans 
3. provide special inspections approval for bar placement, size, and spacing at time of next inspections 
4. provide geo tech reports for soil barring 
5.not ready   | ||||
| Footing/Setback Inspection | Not Ready | 6/5/2023 | 6/5/2023 | 06/05/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 06/05/2023 1. provide step detail from engineer of record 
2.complete all rebar per city approved plans 
3. provide special inspections approval for bar placement, size, and spacing at time of next inspections 
4. provide geo tech reports for soil barring 
5.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 06/05/2023 1. complete items from previous inspection  | ||||
| Footing/Setback Inspection | Not Ready | 11/3/2023 | 11/3/2023 | 11/03/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 11/03/2023 1. provide step detail from engineer of record 
2.complete all rebar per city approved plans 
3. provide special inspections approval for bar placement, size, and spacing at time of next inspections 
4. provide geo tech reports for soil barring 
5.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 11/03/2023 1. complete items from previous inspection | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 11/03/2023 1. provide city approved plans on site at time of next inspection
2.not ready   | ||||
| Building Final Inspection | Not Ready | 11/6/2023 | 11/6/2023 | 11/06/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 11/06/2023 1. this was a footing set back inspection 
2.provide city approved documents to support location of approved  wall revisions at time of next inspection   | ||||
| Footing/Setback Inspection | Not Ready | 11/7/2023 | 11/7/2023 | 11/07/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 11/07/2023 1. provide step detail from engineer of record 
2.complete all rebar per city approved plans 
3. provide special inspections approval for bar placement, size, and spacing at time of next inspections 
4. provide geo tech reports for soil barring 
5.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 11/07/2023 1. complete items from previous inspection | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 11/07/2023 1. provide city approved plans on site at time of next inspection
2.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 11/07/2023 1. no one on site at time of inspection 11:40 AM  | ||||
| Comment Building Div Inspection | Passed | 11/08/2023 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Footing/Setback Inspection | Partial Pass | 11/13/2023 | 11/13/2023 | 11/13/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Resolved 11/13/2023 1. provide step detail from engineer of record 
2.complete all rebar per city approved plans 
3. provide special inspections approval for bar placement, size, and spacing at time of next inspections 
4. provide geo tech reports for soil barring 
5.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Resolved 11/13/2023 1. complete items from previous inspection | ||||
| 
                                    Other/Miscellaneous
                                 Resolved 11/13/2023 1. provide city approved plans on site at time of next inspection
2.not ready | ||||
| 
                                    Other/Miscellaneous
                                 Resolved 11/13/2023 1. no one on site at time of inspection 11:40 AM | ||||
| Footing/Setback Inspection | Not Ready | 11/27/2023 | 11/27/2023 | 11/27/2023 | 
| Shannon King ((253) 840-6684) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 11/27/2023 1 ; provide geo-tech approval at time of inspection.
2 ; complete all rebar as per city approved plans.
3 ; provide min. clearances from soil to rebar and forms to rebar
4 ; provide special inspection approval .
not ready | ||||
| Footing/Setback Inspection | Partial Pass | 11/28/2023 | 11/28/2023 | 11/28/2023 | 
| Shannon King ((253) 840-6684) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Resolved 11/28/2023 1 ; provide geo-tech approval at time of inspection.
2 ; complete all rebar as per city approved plans.
3 ; provide min. clearances from soil to rebar and forms to rebar
4 ; provide special inspection approval .
not ready | ||||
| Footing/Setback Inspection | Partial Pass | 12/21/2023 | 12/21/2023 | 12/21/2023 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Carried Forward 12/21/2023 1.section 2 and 3 upper and lower walls approved to pour  
2. section 6 lower wall provide engineering or EOR approval for wall ht that exceeds max wall ht per city approved plans DO NOT POUR  | ||||
| Building Final Inspection | Partial Pass | 1/3/2024 | 1/3/2024 | 01/03/2024 | 
| Kevin Spruell ((253) 841-5590) | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Resolved 01/03/2024 1. this was a footing set back inspection 
2.provide city approved documents to support location of approved  wall revisions at time of next inspection | ||||
| 
                                    Other/Miscellaneous
                                 Carried Forward 01/03/2024 this was foundation wall inspection for lower wall that did not meet max wall ht requirements area approved ok to pour  | ||||
| Building Final Inspection | VOID | 07/01/2024 | ||
| CityView System Manger | ||||
| Corrections: 
                                    Other/Miscellaneous
                                 Outstanding 01/03/2024 this was foundation wall inspection for lower wall that did not meet max wall ht requirements area approved ok to pour | ||||
| Condition | Status | Category | 
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions | 
| Building Division * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days.  Permits expire two years from issuance.  * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit.  I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If  you are a  property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp | ||
There are no related items for this permit application.