Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Comments
|
06/18/2025
|
06/12/2025
|
|
|
|
Other/Miscellaneous
Provide a site plan showing dimensions to adjacent structures along with maintaining fire lanes.
|
|
|
Engineering Traffic Review
|
No Comments
|
06/18/2025
|
06/11/2025
|
|
|
|
|
Engineering Review
|
Comments
|
06/18/2025
|
06/11/2025
|
|
|
|
Other/Miscellaneous
Engineered plans must follow the latest regulations and standards set forth in the Puyallup Municipal Code (PMC), the City Standards for Public Works Engineering and Construction (design standards), and the current City adopted stormwater manual at the time of civil permit application [PMC 21.10.040]. The comments provided below are project-specific in nature and should not be considered an exhaustive list of the requirements from the PMC, design standards, or the DOE manual.
Show all existing and proposed utilities in the vicinity of the project on the site plan. show the utility easement if it is near the building installation.
WATER
• The proposed water system shall be designed and constructed to current City standards. [PMC 14.02.120]
SEWER
• The proposed sewer system shall be designed and constructed to current City standards. [PMC 14.08.070]
STORMWATER
Stormwater regulations do not apply for projects under 2,000 SF in new/replaced hard surfaces.
The project must at minimum consider the 13 elements for erosion control.
FEES
• Water and sewer connection fees and systems development charges are due at the time of building permit issuance and do not vest until time of permit issuance. Fees are increased annually on February 1st. To obtain credit towards water and sewer System Development Fees for existing facilities, the applicant shall provide the City evidence of the existing plumbing fixtures prior to demolition or removal. A written breakdown of the removed fixture types, quantities, and associated fixture units shall accompany the building permit application and be subject to review and approval by the City. Be sure to request use of credits if need from the Fair master credit list. [PMC 14.02.040, 14.10.030, PMC 14.02.040]
Water
• A water system development charge (SDC) will be assessed based on the number of plumbing fixture units as defined in the Uniform Plumbing Code. Current SDC’s as of this writing are $5,391.59 for the first 15 fixture units and an additional charge of $ 361.23for each fixture unit in excess of the base 15 plumbing fixture units. [PMC 14.02.040]
Sewer
• A sanitary sewer system development charge (SDC) will be assessed based on the number of plumbing fixture units as defined in the Uniform Plumbing Code. Current SDC’s as of this writing are $6,555.06 for the first 15 plumbing fixture units and an additional charge of $ 439.18 for each fixture unit in excess of the base 15 plumbing fixture units. [PMC 14.10.010, 14.10.030]
|
|
|
Building Review
|
Comments
|
06/18/2025
|
06/10/2025
|
|
|
|
Other/Miscellaneous
The occupancy load calculations along with an egress path with travel distances will need to be provided.
|
|
Other/Miscellaneous
Plans submitted to the city should include any and all modifications that will occur to the structure beyond what was approved by the State. This should include equipment provided for cooking or storing food. Any mechanical equipment that will be installed. For example if a hood will be installed, provide the type, size and location. If hood will be attached to trusses, so that the trusses will support the hood.
|
|
Other/Miscellaneous
Plans should be reviewed and revised to comply with 2017 Washington State Accessibility Code. This should include entry and exiting of the structure, or countertop highs, point of sales, etc.
|
|
Other/Miscellaneous
Submittals should include a finalized foundation plan. Based upon the discussion it sounds like there is still a bit of uncertainty about the foundation design. The foundation should show how the structure will be anchored to address seismic and wind loads.
|
|
Other/Miscellaneous
The site plan provided should show the proximity to other structures. It appears in the site plan provided that the proposed structure will be very close to another existing structure. Show the fire separation distance between the proposed and any existing structures. If exterior walls need to be fire rated provide detail showing how the fire rating will be achieved.
|
|
Other/Miscellaneous
Ensure plan submittals include mechanical and plumbing plans
|
|
|
Planning Review
|
Comments
|
06/18/2025
|
06/05/2025
|
|
|
|
Other/Miscellaneous
This is a minor swap within the overall built out site - no additional land use permits required.
SEPA only required if the project involves more than 500 cubic yards of excavation or fill, requires 40 new parking stalls, and/or is a commercial project with more than 4,000 square feet of gross floor area.
|
|
|
External Agency Review
|
No Comments
|
06/18/2025
|
06/04/2025
|
|
|
|
|