Summary

B-20-0984
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
TI - EXISTING SEARS/ BUILDING INTO BOWLING & ARCADE VENUE ~ ROUND 1 BLDG/PLUMB/MECH
12/16/2020
11/17/2021
03/25/2023

Locations

Property
6021010051

Property
6021590070

Property
6021590090

* Address
3500 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 11/08/2021
Engineering Review Approved 11/08/2021
Building Review Approved 09/27/2021
Building Review Approved 09/27/2021
Building Review Incomplete 08/27/2021
Building Review Incomplete 06/04/2021
Fire Review Approved 02/10/2021
Planning Review In Progress 02/04/2021
Engineering Review Incomplete 01/15/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 11/17/2021
No
Legacy Fee $130.00 $130.00 Paid 11/17/2021
No
Building Division Fee (Hourly) $260.00 $260.00 Paid 11/17/2021
No
Planning Building Permit Fee $120.00 $120.00 Paid 11/15/2021
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 11/15/2021
No
Plumbing Permit Fee $1,043.50 $1,043.50 Paid 11/15/2021
No
Planning Landscape Review Fee $300.00 $300.00 Paid 11/15/2021
No
Mechanical Plan Review Fee $243.82 $243.82 Paid 11/15/2021
No
Mechanical Permit Fee $375.11 $375.11 Paid 11/15/2021
No
Plumbing Plan Review Fee $678.28 $678.28 Paid 11/15/2021
No
Building Plan Review Fee $9,916.21 $9,916.21 Paid 11/15/2021
No
Sewer System Development Charge $66,308.56 $66,308.56 Paid 11/15/2021
No
Building Permit Fee $15,255.70 $15,255.70 Paid 11/15/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Comments 11/29/2021 11/29/2021
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Comments 11/29/2021 11/29/2021
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Not Ready 12/7/2021 12/07/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection Partial Pass 12/10/2021 12/10/2021 12/15/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection Partial Pass 12/15/2021 12/15/2021 12/15/2021
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
12/15/2021
1 ; inspection of vapor barrier and slab dowels installed at plumbing trench of restrooms.

Frame Inspection Partial Pass 1/7/2022 1/7/2022 01/07/2022
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Partial Pass 2/3/2022 2/3/2022 02/03/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
02/03/2022
1 ; approved columns and half walls only.

Wallboard / Drywall Inspection Partial Pass 2/3/2022 02/03/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
02/03/2022
approved 1side only of drywall as noted on sheet A101 of City Approved Plans.

Frame Inspection Partial Pass 2/9/2022 2/9/2022 02/09/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/09/2022
walls - ok - minus plumbing walls provide plan revision approval of added closet ok to 1 side plumbing walls

Plumbing Rough In Inspection Partial Pass 2/18/2022 2/18/2022 02/18/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/18/2022
provide hammer arrestor @ urinals as discussed

Wallboard / Drywall Inspection Partial Pass 2/18/2022 2/18/2022 02/18/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/18/2022
east side of kitchen wall, redemption room, party back wall - ok

Wallboard / Drywall Inspection Partial Pass 3/2/2022 3/2/2022 03/02/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/02/2022
approved 1side only of drywall as noted on sheet A101 of City Approved Plans.

Comment Building Div Inspection Partial Pass 3/21/2022 3/21/2022 03/21/2022
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 3/28/2022 3/28/2022 03/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
03/28/2022
grease duct ok to wrap.

Ceiling Grid/T-Bar Inspection Partial Pass 5/18/2022 5/18/2022 05/18/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
05/18/2022
ok to drop perimeters at cloud only, talked about correct bracing, diffusers, spreader bars etc.

Ceiling Grid/T-Bar Inspection Not Ready 5/24/2022 5/24/2022 05/24/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/24/2022
1 ; provide fire cover approval. 2 ; complete all ceiling grid requirements as discussed with contractor - not ready

Mechanical Rough In Inspection Failed 5/24/2022 5/24/2022 05/24/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/24/2022
1 ; provide positive attachment of diffusers to main and cross-tee.

Ceiling Grid/T-Bar Inspection Failed 6/8/2022 6/8/2022 06/08/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
06/08/2022
1 ; provide fire cover approval. 2 ; complete all ceiling grid requirements as discussed with contractor - not ready

Other/Miscellaneous
Carried Forward
06/08/2022
1:COMPLETE ALL PERIMITER WIRES. 2:SIEZMIC BRACE SPEAKERS WHERE NEEDED, MAY NEED ARCHITECTS DESIGN. 3:ALL PERIMITER WIRES TO BE IN SOLID BACKING/ STUD 4:DID NOT CHECK DIFFUSERS

Fire Final Inspection Not Ready 6/8/2022 6/8/2022 06/09/2022
David Drake ((253) 864-4171)
Ceiling Grid/T-Bar Inspection Partial Pass 6/10/2022 6/10/2022 06/10/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/10/2022
1 ; provide fire cover approval. 2 ; complete all ceiling grid requirements as discussed with contractor - not ready

Other/Miscellaneous
Carried Forward
06/10/2022
1 ; provide positive attachment of diffusers to main and cross tee of suspended ceiling. 2 ; complete tie wires at speaker in ceiling grid and positive attachment of speaker below suspended ceiling as discussed with contractor. ok to cover except areas noted. (leave out 1 tile at diffusers and speakers to check attachment)

Plumbing Rough In Inspection Not Ready 6/22/2022 6/22/2022 06/22/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
06/22/2022
provide hammer arrestor @ urinals as discussed

Other/Miscellaneous
Carried Forward
06/22/2022
bathroom completion in progress, super wanted to use bathrooms for employees while setting up space, employees will be under management supervision and will be treated as subs until final c of o

Fire Final Inspection Failed 6/28/2022 06/28/2022
Ray Cockerham ((253) 841-5585)
Plumbing Final Inspection Not Ready 6/28/2022 6/28/2022 06/28/2022
Shannon King ((253) 840-6684)
Fire Final Inspection Failed 07/15/2022
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Outstanding
07/15/2022
Need TEST report for two added FA devices at cloud ceiling at the bowling lanes, devices are installed. Need test report for the central station reporting.

Building Final Inspection Not Ready 7/20/2022 7/20/2022 07/20/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/20/2022
1. Complete accessible path at front of building 2. Provide balance report 3. Replace painted sprinkler heads and remove foil from sprinkler heads 4. Guard at rear exit to be minimum 42 inches north east corner of building 5. Complete excussion at mall entry 6. Unisex bath room need to change out flush ometer 7. Complete drain protection in men’s bath 8. Women’s bath change out flushometer 9. Complete all ceiling tile install 10. Area 999E repair insulation and add SFK barrier 11. Provide 1 inch clearance above flood rim in floor wash sink 12. Secure RTU units on the roof 13. Properly secure small unit to roof 14. Paint gas pipe on roof 15. Remove all abandon gas lines from roof 16.support Gas pipes at units on roof 17. Install roof tie off or complete existing guard rail to withstand 250 pound force 18. Fire stop demising wall north west corner between spaces 19. Install hammer arrestors at dishwasher and icemaker in kitchen 20. Non-potable tag on research off of kitchen or hot water tanks are 21. Insulate recirculating loop lines at hot water heaters 22. Support expansion tank at hot water heater 23. Provide access door at concrete wall in electrical room 24. Urinal in men’s bathroom max height 17 inches as per city approved plans page G Dash 002 25. Complete all accessory seating signage as discussed with contractor

Engineering Final Inspection Passed w/ Conditions 7/25/2022 7/25/2022 07/25/2022
Jason Little ((253) 435-3636)
Building Final Inspection Partial Pass 7/25/2022 7/25/2022 07/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/25/2022
1. Complete accessible path at front of building 2. Provide balance report 3. Replace painted sprinkler heads and remove foil from sprinkler heads 4. Guard at rear exit to be minimum 42 inches north east corner of building 5. Complete excussion at mall entry 6. Unisex bath room need to change out flush ometer 7. Complete drain protection in men’s bath 8. Women’s bath change out flushometer 9. Complete all ceiling tile install 10. Area 999E repair insulation and add SFK barrier 11. Provide 1 inch clearance above flood rim in floor wash sink 12. Secure RTU units on the roof 13. Properly secure small unit to roof 14. Paint gas pipe on roof 15. Remove all abandon gas lines from roof 16.support Gas pipes at units on roof 17. Install roof tie off or complete existing guard rail to withstand 250 pound force 18. Fire stop demising wall north west corner between spaces 19. Install hammer arrestors at dishwasher and icemaker in kitchen 20. Non-potable tag on research off of kitchen or hot water tanks are 21. Insulate recirculating loop lines at hot water heaters 22. Support expansion tank at hot water heater 23. Provide access door at concrete wall in electrical room 24. Urinal in men’s bathroom max height 17 inches as per city approved plans page G Dash 002 25. Complete all accessory seating signage as discussed with contractor

Other/Miscellaneous
Carried Forward
07/25/2022
1 ; complete corrections - 1,2,4,12,13,14,15,17,20,23, of inspection dated - 7/20/2022 prior to Building final inspection. 2 ; T.C.O. approved for 30 days from 7/25/2022

Mechanical Final Inspection Failed 7/25/2022 7/25/2022 07/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/25/2022
1 ; see building final dated - 7 / 25/ 2022

Plumbing Final Inspection Failed 7/25/2022 7/25/2022 07/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/25/2022
1 ; see building final dated - 7 / 25/ 2022

Building Final Inspection Partial Pass 8/25/2022 8/25/2022 08/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/25/2022
1. Complete accessible path at front of building 2. Provide balance report 3. Replace painted sprinkler heads and remove foil from sprinkler heads 4. Guard at rear exit to be minimum 42 inches north east corner of building 5. Complete excussion at mall entry 6. Unisex bath room need to change out flush ometer 7. Complete drain protection in men’s bath 8. Women’s bath change out flushometer 9. Complete all ceiling tile install 10. Area 999E repair insulation and add SFK barrier 11. Provide 1 inch clearance above flood rim in floor wash sink 12. Secure RTU units on the roof 13. Properly secure small unit to roof 14. Paint gas pipe on roof 15. Remove all abandon gas lines from roof 16.support Gas pipes at units on roof 17. Install roof tie off or complete existing guard rail to withstand 250 pound force 18. Fire stop demising wall north west corner between spaces 19. Install hammer arrestors at dishwasher and icemaker in kitchen 20. Non-potable tag on research off of kitchen or hot water tanks are 21. Insulate recirculating loop lines at hot water heaters 22. Support expansion tank at hot water heater 23. Provide access door at concrete wall in electrical room 24. Urinal in men’s bathroom max height 17 inches as per city approved plans page G Dash 002 25. Complete all accessory seating signage as discussed with contractor

Other/Miscellaneous
Carried Forward
08/25/2022
1 ; complete corrections - 1,2,4,12,13,14,15,17,20,23, of inspection dated - 7/20/2022 prior to Building final inspection. 2 ; T.C.O. approved for 30 days from 7/25/2022

Carbon Monoxide Detectors Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
02/03/2022
1 ; approved columns and half walls only.

Wallboard / Drywall Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/02/2022
approved 1side only of drywall as noted on sheet A101 of City Approved Plans.

Comment Building Div Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/22/2022
provide hammer arrestor @ urinals as discussed

Mechanical Final Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
07/25/2022
1 ; see building final dated - 7 / 25/ 2022

Plumbing Final Inspection VOID 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
07/25/2022
1 ; see building final dated - 7 / 25/ 2022

Building Final Inspection VOID 9/26/2022 9/26/2022 09/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
09/26/2022
1. Complete accessible path at front of building 2. Provide balance report 3. Replace painted sprinkler heads and remove foil from sprinkler heads 4. Guard at rear exit to be minimum 42 inches north east corner of building 5. Complete excussion at mall entry 6. Unisex bath room need to change out flush ometer 7. Complete drain protection in men’s bath 8. Women’s bath change out flushometer 9. Complete all ceiling tile install 10. Area 999E repair insulation and add SFK barrier 11. Provide 1 inch clearance above flood rim in floor wash sink 12. Secure RTU units on the roof 13. Properly secure small unit to roof 14. Paint gas pipe on roof 15. Remove all abandon gas lines from roof 16.support Gas pipes at units on roof 17. Install roof tie off or complete existing guard rail to withstand 250 pound force 18. Fire stop demising wall north west corner between spaces 19. Install hammer arrestors at dishwasher and icemaker in kitchen 20. Non-potable tag on research off of kitchen or hot water tanks are 21. Insulate recirculating loop lines at hot water heaters 22. Support expansion tank at hot water heater 23. Provide access door at concrete wall in electrical room 24. Urinal in men’s bathroom max height 17 inches as per city approved plans page G Dash 002 25. Complete all accessory seating signage as discussed with contractor

Other/Miscellaneous
Resolved
09/26/2022
1 ; complete corrections - 1,2,4,12,13,14,15,17,20,23, of inspection dated - 7/20/2022 prior to Building final inspection. 2 ; T.C.O. approved for 30 days from 7/25/2022

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-21-0068 IS COMPLETED AND FINAL APPROVAL HAS BEEN PROVIDED ** * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * Please reach out to Fruitland Mutual Water Company for any questions and requirement of the water system. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4- EMERGENCY RADIO TEST REQUIRED COMPLY WITH IFC SECTION 510. FIRE FINAL APPROVAL APON COMPLETED TEST RESULTS 5- SEPERATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SPRINKLER 6- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN 7- FIRE EXTINGUISHERS REQUIRED PER CODE 8- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING 9- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX 10- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 5610 EMERGENCY RADIO TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/04/2022 Report Inspection Report (Plumbing Below Slab Inspection)
01/07/2022 Report Inspection Report (Frame Inspection)
02/03/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
02/09/2022 Report Inspection Report (Frame Inspection)
02/09/2022 Report Inspection Report (Wallboard / Drywall Inspection)
02/09/2022 Report Inspection Report (Wallboard / Drywall Inspection)
02/18/2022 Report Inspection Report (Plumbing Rough In Inspection)
02/18/2022 Report Inspection Report (Frame Inspection)
02/18/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/02/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/08/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/18/2022 Report Inspection Report (Energy (Insulation) Inspection)
03/21/2022 Report Inspection Report (Comment Building Div Inspection)
06/10/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/13/2022 Report Inspection Report (Mechanical Rough In Inspection)
06/28/2022 Report Inspection Report (Plumbing Final Inspection)
07/11/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/20/2022 Report Inspection Report (Building Final Inspection)
07/25/2022 Report Inspection Report (Fire Final Inspection)
07/25/2022 Report Inspection Report (Exit Lighting Test Inspection)
07/25/2022 Report Inspection Report (Engineering Final Inspection)
07/25/2022 Report Inspection Report (Building Final Inspection)
07/25/2022 Report Inspection Report (Mechanical Final Inspection)
07/25/2022 Report Inspection Report (Plumbing Final Inspection)
08/25/2022 Report Inspection Report (Building Final Inspection)
09/26/2022 Report Inspection Report (Building Final Inspection)