Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Plumbing Plan Review Fee | $68.25 | $68.25 | Paid | 12/07/2021 |
No
|
||||
WA State Building Code Council Fee (Residential) | $25.00 | $25.00 | Paid | 12/07/2021 |
No
|
||||
Mechanical Plan Review Fee | $67.70 | $67.70 | Paid | 12/07/2021 |
No
|
||||
Mechanical Permit Fee | $104.15 | $104.15 | Paid | 12/07/2021 |
No
|
||||
Plumbing Permit Fee | $105.00 | $105.00 | Paid | 12/07/2021 |
No
|
||||
Building Division Fee (Hourly) | $130.00 | $130.00 | Paid | 12/07/2021 |
No
|
||||
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 12/07/2021 |
No
|
||||
Legacy Fee | $130.00 | $130.00 | Paid | 12/07/2021 |
No
|
||||
Sanitary Sewer Connection Fee | $466.00 | $466.00 | Paid | 12/07/2021 |
No
|
||||
Building Permit Fee | $993.75 | $993.75 | Paid | 12/07/2021 |
No
|
||||
Sewer System Development Charge | $27,939.00 | $27,939.00 | Paid | 12/07/2021 |
No
|
||||
Building Plan Review Fee | $645.94 | $645.94 | Paid | 12/07/2021 |
No
|
||||
Inspection Fee - Outside Of Business Hours | $390.00 | $390.00 | Paid | 07/18/2022 |
Building Division Fee (Hourly) | $130.00 | $130.00 | Paid | 07/26/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $31,459.79 | $31,459.79 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Foundation/Rebar Inspection | Partial Pass | 12/21/2021 | 12/23/2021 | 12/23/2021 |
Gary Webster ((253) 841-5590) | ||||
Plumbing Rough In Inspection | Partial Pass | 1/7/2022 | 1/7/2022 | 01/07/2022 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 3/30/2022 | 3/30/2022 | 03/30/2022 |
Gary Webster ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
03/30/2022
HGA10'S @ 24" FOR ROOF OVERFRAME - OK
|
||||
Energy (Insulation) Inspection | Partial Pass | 4/5/2022 | 4/5/2022 | 04/05/2022 |
Gary Webster ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
04/05/2022
insulation at roll up doors - ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 4/12/2022 | 4/12/2022 | 04/12/2022 |
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Failed | 4/25/2022 | 4/25/2022 | 04/25/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/25/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval.
2 ; provide new mechanical plan as built from mechanical engineer.
3 ; complete all anchor bolts as discussed with contractor.
4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 4/29/2022 | 4/29/2022 | 04/29/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/29/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval.
2 ; provide new mechanical plan as built from mechanical engineer.
3 ; complete all anchor bolts as discussed with contractor.
4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.
|
||||
Other/Miscellaneous
Carried Forward
04/29/2022
1 ; provide gas pipe plan and test approval.
2 ; provide new mechanical as built plan approval from mechanical engineer.
|
||||
Energy (Insulation) Inspection | Failed | 5/3/2022 | 5/3/2022 | 05/03/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
05/03/2022
1 ; complete all insulation at exterior walls and insulate hotwater supply lines as discussed with contractor.
|
||||
Comment Building Div Inspection | Partial Pass | 5/4/2022 | 5/4/2022 | 05/04/2022 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 5/16/2022 | 5/16/2022 | 05/16/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Partial Pass | 5/24/2022 | 5/24/2022 | 05/24/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Not Ready | 5/31/2022 | 5/31/2022 | 05/31/2022 |
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | Not Ready | 5/31/2022 | 5/31/2022 | 05/31/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Partial Pass | 6/15/2022 | 6/15/2022 | 06/15/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Partial Pass | 6/16/2022 | 6/16/2022 | 06/16/2022 |
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | Partial Pass | 6/17/2022 | 6/17/2022 | 06/17/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
06/17/2022
grease duct below ceiling 2nd wrap ok
|
||||
Light Test For Grease Duct Inspection | Partial Pass | 6/21/2022 | 6/21/2022 | 06/21/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Partial Pass | 6/28/2022 | 6/28/2022 | 06/28/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Failed | 7/1/2022 | 7/5/2022 | 07/05/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/05/2022
no body onsite for inspection
|
||||
Light Test For Grease Duct Inspection | Failed | 7/6/2022 | 7/6/2022 | 07/06/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/06/2022
2 pin holes found and marked at duct to hood connection
|
||||
Light Test For Grease Duct Inspection | Failed | 7/11/2022 | 7/11/2022 | 07/11/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/11/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor
|
||||
Exhaust Hood Inspection | Failed | 7/11/2022 | 7/11/2022 | 07/11/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/11/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor
|
||||
Exhaust Hood Inspection | Failed | 7/12/2022 | 7/12/2022 | 07/12/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete Welding of pinholes hood 1
|
||||
Light Test For Grease Duct Inspection | Failed | 7/12/2022 | 7/12/2022 | 07/12/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
07/12/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete Welding of pinholes at hood 1
|
||||
Exhaust Hood Inspection | Partial Pass | 7/13/2022 | 7/13/2022 | 07/13/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete Welding of pinholes hood 1
|
||||
Other/Miscellaneous
Carried Forward
07/13/2022
1. Hood three first layer of insulation at elbow Approved except on roof
|
||||
Light Test For Grease Duct Inspection | Partial Pass | 7/13/2022 | 7/13/2022 | 07/13/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/13/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete Welding of pinholes at hood 1
|
||||
Other/Miscellaneous
Carried Forward
07/13/2022
1. Hood one welding complete except on roof
|
||||
Comment Building Div Inspection | Not Ready | 7/14/2022 | 7/14/2022 | 07/14/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Failed | 7/18/2022 | 7/18/2022 | 07/18/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/18/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/18/2022
1. Complete Welding of pinholes at hood 1
|
||||
Other/Miscellaneous
Carried Forward
07/18/2022
1. Hood one welding complete except on roof
|
||||
Other/Miscellaneous
Carried Forward
07/18/2022
1. Baxter duct repair pin holes
|
||||
Light Test For Grease Duct Inspection | Partial Pass | 7/20/2022 | 7/20/2022 | 07/20/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
07/20/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/20/2022
1. Complete Welding of pinholes at hood 1
|
||||
Other/Miscellaneous
Carried Forward
07/20/2022
1. Hood one welding complete except on roof
|
||||
Other/Miscellaneous
Carried Forward
07/20/2022
1. Baxter duct repair pin holes
|
||||
Light Test For Grease Duct Inspection | Partial Pass | 7/22/2022 | 07/26/2022 | |
Shannon King ((253) 840-6684) | ||||
Gas Test Inspection | Partial Pass | 7/28/2022 | 7/28/2022 | 07/28/2022 |
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 8/3/2022 | 8/3/2022 | 08/03/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/03/2022
1.ok to cover perimeter only
2. Provide positive connection of diffusers
3. Complete grid around hoods
4. Provide fire cover approval prior to next inspection
|
||||
Light Test For Grease Duct Inspection | Partial Pass | 8/8/2022 | 8/8/2022 | 08/08/2022 |
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Partial Pass | 8/8/2022 | 8/8/2022 | 08/08/2022 |
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 8/11/2022 | 8/11/2022 | 08/11/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/11/2022
1.ok to cover perimeter only
2. Provide positive connection of diffusers
3. Complete grid around hoods
4. Provide fire cover approval prior to next inspection
|
||||
Other/Miscellaneous
Carried Forward
08/11/2022
1. Provide positive connections to diffusers to grid
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 8/15/2022 | 8/15/2022 | 08/15/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/15/2022
1.ok to cover perimeter only
2. Provide positive connection of diffusers
3. Complete grid around hoods
4. Provide fire cover approval prior to next inspection
|
||||
Other/Miscellaneous
Carried Forward
08/15/2022
1. Provide positive connections to diffusers to grid
|
||||
Other/Miscellaneous
Carried Forward
08/15/2022
1. Diffuser attachment OK
2.Provide pathway to complete ceiling around hoods
3.ok to put tiles in accept around hood
|
||||
Gas Test Inspection | Not Ready | 8/19/2022 | 8/19/2022 | 08/19/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Comment Building Div Inspection | Not Ready | 9/12/2022 | 9/12/2022 | 09/12/2022 |
Shannon King ((253) 840-6684) | ||||
Planning Final Inspection | VOID | 9/21/2022 | 09/20/2022 | |
Gabriel Clark ((253) 770-3330) | ||||
Job Start Inspection | VOID | 09/27/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Final Inspection | Failed | 9/27/2022 | 09/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Building Final Inspection | Failed | 9/28/2022 | 9/28/2022 | 09/28/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; paint all gas pipe at exterior of building.
2 ; seal all penetrations in exterior siding.
3 ; insulate water supply lines at swamp coolers.
4 ; provide fire damper access door signage at mechanical duct on roof as discussed with contractor.
5 ; provide service access for removal of filter at mechanical as discussed with contractor.
6 ; provide positive connection of unit on roof.(Daikin)
8 ; provide 1'' clearance to combustibles at b-vent at heater at all exterior locations.
9 ; complete roof penetration at south heater as discussed with contractor.
10 ; provide restroom sinks not to exceed 34''a.f.f. as per code.
11 ; urinal in men's restroom not to exceed 17'' as per code.
12 ; insulate water supply line at sink in cooler.
13 ; complete ceiling tile's around hood in kitchen.
14 ; complete support of vents at back of ovens.
15 ; provide detail from architect at exterior landing exceed 2% at kitchen exit door. (106B)
16 ; provide health dept. final approval of septic prior to building final.
17 ; provide health dept. pre-walk inspection report prior to final.
18 ; complete set-up of seating and accessible signage as discussed with contractor.
19 ; provide positive connection of expansion tank of water heaters.
20 ; ; provide boiler final approval prior to building final inspection.
21 ; provide balance report with make-up air prior to final.
ok for kitchen training only
|
||||
Plumbing Final Inspection | Failed | 9/28/2022 | 9/28/2022 | 09/28/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; see building final inspection corrections dated 9-28-2022
|
||||
Mechanical Final Inspection | Failed | 9/28/2022 | 9/28/2022 | 09/28/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; see building final for corrections dated 9-28-2022
|
||||
Carbon Monoxide Detectors Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Footing/Setback Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
04/29/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval.
2 ; provide new mechanical plan as built from mechanical engineer.
3 ; complete all anchor bolts as discussed with contractor.
4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.
|
||||
Other/Miscellaneous
Outstanding
04/29/2022
1 ; provide gas pipe plan and test approval.
2 ; provide new mechanical as built plan approval from mechanical engineer.
|
||||
Wallboard / Drywall Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Exhaust Hood Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
07/13/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor
|
||||
Other/Miscellaneous
Outstanding
07/13/2022
1. Complete Welding of pinholes hood 1
|
||||
Other/Miscellaneous
Outstanding
07/13/2022
1. Hood three first layer of insulation at elbow Approved except on roof
|
||||
Light Test For Grease Duct Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | VOID | 10/10/2022 | ||
Shannon King ((253) 840-6684) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
General Permit Conditions | Resolved | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
* TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Resolved | Engineering Division | Standard Conditions | ||
:
** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-21-066 AND E-21-0440 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED **
** PRIOR TO SEWER CONNECTION AN APPLICATION FOR UTILITY CONNECTION MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. A PLUMBING FIXTURE WORKSHEET FOR EACH INDIVIDUAL BUILDING ONSITE MUST SUBMIT A PLUMBING FIXTURE WORKSHEET AS A PART OF THE UTILITY CONNECTION APPLICATION **
*Control of roof downspouts is required. Refer to standard details 02.05.01 & 02.05.03 for typical control methods - attached *
*Refer to standard details 02.03.02 & 05.02.01 for typical sedimentation and erosion control methods - attached*
** The approved civil plans did not reflect the same building footprint as the approved building plans. Please note that the NW corner of the Gateway Building extends further north on the approved building plans (B-21-0256) than on the approved civil plans(E-21-0440). The primary area of concern is the existing1500 gallon septic tank. When relocating please know that it cannot be placed within 5' (feet) of any structure. **
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
* No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
|||||
Building Permit Standard Conditions | Resolved | Building Division | Standard Conditions | ||
:
PERMIT CONDITIONS:
1- COMPLY WITH 2015 IFC AND 2015 IBC
2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP
3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER
4- A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED
5- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN.
6- FIRE EXTINGUISHERS REQUIRED PER CODE
7- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING
8- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX
9- EXISTING BUILDINGS WILL NEED TO CONTACT CENTRAL PIERCE FIRE & RESCUE AND UPDATE THE KEY IN THE KNOX BOX
10- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL
INSPECTION REQUEST CODES:
2252 EXIT LIGHT TEST
9200 FIRE BUILDING FINAL
SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS.
HTTPS://SECURE.CITYOFPUYALLUP.ORG/
INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE)
DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
|
|||||
Pipeline Notfication Rcw 19.122.033 | Resolved | Engineering Division | Standard Conditions | ||
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
There are no related items for this permit application.