Summary

B-21-0256
Commercial - Tenant Improvement/Remodel
Closed
STEP BY STEP FAMILY SUPPORT CENTER
Alteration/Remodel
TI ~ MODIFY BATHROOM; INCREASE KITCHEN; ADD STORAGE; REMOVE CLASSROOM & OFFICE. ~ STEP BY STEPBLDG/MECH/PLUMB
04/20/2021
12/07/2021
04/08/2023
10/10/2022

Locations

Property
0420253070

* Address
3303 8TH AVE SE

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 07/29/2022 07/26/2022
Engineering Review Approved 12/03/2021
Engineering Review Approved 12/03/2021
Building Review Approved 11/12/2021
Building Review Approved 10/25/2021
Fire Review In Progress 10/25/2021
Building Review Approved 10/01/2021
Fire Review Approved 06/04/2021
Building Review Approved 05/25/2021
Planning Review In Progress 05/20/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Plumbing Plan Review Fee $68.25 $68.25 Paid 12/07/2021
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 12/07/2021
No
Mechanical Plan Review Fee $67.70 $67.70 Paid 12/07/2021
No
Mechanical Permit Fee $104.15 $104.15 Paid 12/07/2021
No
Plumbing Permit Fee $105.00 $105.00 Paid 12/07/2021
No
Building Division Fee (Hourly) $130.00 $130.00 Paid 12/07/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 12/07/2021
No
Legacy Fee $130.00 $130.00 Paid 12/07/2021
No
Sanitary Sewer Connection Fee $466.00 $466.00 Paid 12/07/2021
No
Building Permit Fee $993.75 $993.75 Paid 12/07/2021
No
Sewer System Development Charge $27,939.00 $27,939.00 Paid 12/07/2021
No
Building Plan Review Fee $645.94 $645.94 Paid 12/07/2021
No
Inspection Fee - Outside Of Business Hours $390.00 $390.00 Paid 07/18/2022
Building Division Fee (Hourly) $130.00 $130.00 Paid 07/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation/Rebar Inspection Partial Pass 12/21/2021 12/23/2021 12/23/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection Partial Pass 1/7/2022 1/7/2022 01/07/2022
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 3/30/2022 3/30/2022 03/30/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/30/2022
HGA10'S @ 24" FOR ROOF OVERFRAME - OK

Energy (Insulation) Inspection Partial Pass 4/5/2022 4/5/2022 04/05/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/05/2022
insulation at roll up doors - ok

Wallboard / Drywall Inspection Partial Pass 4/12/2022 4/12/2022 04/12/2022
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Failed 4/25/2022 4/25/2022 04/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/25/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval. 2 ; provide new mechanical plan as built from mechanical engineer. 3 ; complete all anchor bolts as discussed with contractor. 4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.

Combination Frame And Rough In Inspection Partial Pass 4/29/2022 4/29/2022 04/29/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/29/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval. 2 ; provide new mechanical plan as built from mechanical engineer. 3 ; complete all anchor bolts as discussed with contractor. 4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.

Other/Miscellaneous
Carried Forward
04/29/2022
1 ; provide gas pipe plan and test approval. 2 ; provide new mechanical as built plan approval from mechanical engineer.

Energy (Insulation) Inspection Failed 5/3/2022 5/3/2022 05/03/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/03/2022
1 ; complete all insulation at exterior walls and insulate hotwater supply lines as discussed with contractor.

Comment Building Div Inspection Partial Pass 5/4/2022 5/4/2022 05/04/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/16/2022 5/16/2022 05/16/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Partial Pass 5/24/2022 5/24/2022 05/24/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Not Ready 5/31/2022 5/31/2022 05/31/2022
Shannon King ((253) 840-6684)
Comment Building Div Inspection Not Ready 5/31/2022 5/31/2022 05/31/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Partial Pass 6/15/2022 6/15/2022 06/15/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Partial Pass 6/16/2022 6/16/2022 06/16/2022
Shannon King ((253) 840-6684)
Comment Building Div Inspection Partial Pass 6/17/2022 6/17/2022 06/17/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
06/17/2022
grease duct below ceiling 2nd wrap ok

Light Test For Grease Duct Inspection Partial Pass 6/21/2022 6/21/2022 06/21/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Partial Pass 6/28/2022 6/28/2022 06/28/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Failed 7/1/2022 7/5/2022 07/05/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2022
no body onsite for inspection

Light Test For Grease Duct Inspection Failed 7/6/2022 7/6/2022 07/06/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/06/2022
2 pin holes found and marked at duct to hood connection

Light Test For Grease Duct Inspection Failed 7/11/2022 7/11/2022 07/11/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/11/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor

Exhaust Hood Inspection Failed 7/11/2022 7/11/2022 07/11/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/11/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor

Exhaust Hood Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete Welding of pinholes hood 1

Light Test For Grease Duct Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
07/12/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/12/2022
1. Complete Welding of pinholes at hood 1

Exhaust Hood Inspection Partial Pass 7/13/2022 7/13/2022 07/13/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete Welding of pinholes hood 1

Other/Miscellaneous
Carried Forward
07/13/2022
1. Hood three first layer of insulation at elbow Approved except on roof

Light Test For Grease Duct Inspection Partial Pass 7/13/2022 7/13/2022 07/13/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/13/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/13/2022
1. Complete Welding of pinholes at hood 1

Other/Miscellaneous
Carried Forward
07/13/2022
1. Hood one welding complete except on roof

Comment Building Div Inspection Not Ready 7/14/2022 7/14/2022 07/14/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Failed 7/18/2022 7/18/2022 07/18/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/18/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/18/2022
1. Complete Welding of pinholes at hood 1

Other/Miscellaneous
Carried Forward
07/18/2022
1. Hood one welding complete except on roof

Other/Miscellaneous
Carried Forward
07/18/2022
1. Baxter duct repair pin holes

Light Test For Grease Duct Inspection Partial Pass 7/20/2022 7/20/2022 07/20/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/20/2022
1.complete welding pin holes at hood 1;2;3 as discussed with contractor

Other/Miscellaneous
Carried Forward
07/20/2022
1. Complete Welding of pinholes at hood 1

Other/Miscellaneous
Carried Forward
07/20/2022
1. Hood one welding complete except on roof

Other/Miscellaneous
Carried Forward
07/20/2022
1. Baxter duct repair pin holes

Light Test For Grease Duct Inspection Partial Pass 7/22/2022 07/26/2022
Shannon King ((253) 840-6684)
Gas Test Inspection Partial Pass 7/28/2022 7/28/2022 07/28/2022
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Not Ready 8/3/2022 8/3/2022 08/03/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
08/03/2022
1.ok to cover perimeter only 2. Provide positive connection of diffusers 3. Complete grid around hoods 4. Provide fire cover approval prior to next inspection

Light Test For Grease Duct Inspection Partial Pass 8/8/2022 8/8/2022 08/08/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Partial Pass 8/8/2022 8/8/2022 08/08/2022
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Not Ready 8/11/2022 8/11/2022 08/11/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
08/11/2022
1.ok to cover perimeter only 2. Provide positive connection of diffusers 3. Complete grid around hoods 4. Provide fire cover approval prior to next inspection

Other/Miscellaneous
Carried Forward
08/11/2022
1. Provide positive connections to diffusers to grid

Ceiling Grid/T-Bar Inspection Partial Pass 8/15/2022 8/15/2022 08/15/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
08/15/2022
1.ok to cover perimeter only 2. Provide positive connection of diffusers 3. Complete grid around hoods 4. Provide fire cover approval prior to next inspection

Other/Miscellaneous
Carried Forward
08/15/2022
1. Provide positive connections to diffusers to grid

Other/Miscellaneous
Carried Forward
08/15/2022
1. Diffuser attachment OK 2.Provide pathway to complete ceiling around hoods 3.ok to put tiles in accept around hood

Gas Test Inspection Not Ready 8/19/2022 8/19/2022 08/19/2022
Kevin Spruell ((253) 841-5590)
Comment Building Div Inspection Not Ready 9/12/2022 9/12/2022 09/12/2022
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 9/21/2022 09/20/2022
Gabriel Clark ((253) 770-3330)
Job Start Inspection VOID 09/27/2022
Jason Little ((253) 244-0387)
Engineering Final Inspection Failed 9/27/2022 09/27/2022
Jason Little ((253) 244-0387)
Building Final Inspection Failed 9/28/2022 9/28/2022 09/28/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; paint all gas pipe at exterior of building. 2 ; seal all penetrations in exterior siding. 3 ; insulate water supply lines at swamp coolers. 4 ; provide fire damper access door signage at mechanical duct on roof as discussed with contractor. 5 ; provide service access for removal of filter at mechanical as discussed with contractor. 6 ; provide positive connection of unit on roof.(Daikin) 8 ; provide 1'' clearance to combustibles at b-vent at heater at all exterior locations. 9 ; complete roof penetration at south heater as discussed with contractor. 10 ; provide restroom sinks not to exceed 34''a.f.f. as per code. 11 ; urinal in men's restroom not to exceed 17'' as per code. 12 ; insulate water supply line at sink in cooler. 13 ; complete ceiling tile's around hood in kitchen. 14 ; complete support of vents at back of ovens. 15 ; provide detail from architect at exterior landing exceed 2% at kitchen exit door. (106B) 16 ; provide health dept. final approval of septic prior to building final. 17 ; provide health dept. pre-walk inspection report prior to final. 18 ; complete set-up of seating and accessible signage as discussed with contractor. 19 ; provide positive connection of expansion tank of water heaters. 20 ; ; provide boiler final approval prior to building final inspection. 21 ; provide balance report with make-up air prior to final. ok for kitchen training only

Plumbing Final Inspection Failed 9/28/2022 9/28/2022 09/28/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; see building final inspection corrections dated 9-28-2022

Mechanical Final Inspection Failed 9/28/2022 9/28/2022 09/28/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/28/2022
1 ; see building final for corrections dated 9-28-2022

Carbon Monoxide Detectors Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Frame Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
04/29/2022
1 ; provide gas pipe plans from mechanical engineers of record. ( provide test on gas pipe prior to frame cover approval. 2 ; provide new mechanical plan as built from mechanical engineer. 3 ; complete all anchor bolts as discussed with contractor. 4 ; complete install of HDU5;s with special inspection report for install of holdowns prior to frame approval.

Other/Miscellaneous
Outstanding
04/29/2022
1 ; provide gas pipe plan and test approval. 2 ; provide new mechanical as built plan approval from mechanical engineer.

Wallboard / Drywall Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
07/13/2022
1. Complete welding of pin holes in exhaust duct at hoods1;2;3 as discussed with contractor

Other/Miscellaneous
Outstanding
07/13/2022
1. Complete Welding of pinholes hood 1

Other/Miscellaneous
Outstanding
07/13/2022
1. Hood three first layer of insulation at elbow Approved except on roof

Light Test For Grease Duct Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 10/10/2022
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-21-066 AND E-21-0440 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** ** PRIOR TO SEWER CONNECTION AN APPLICATION FOR UTILITY CONNECTION MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. A PLUMBING FIXTURE WORKSHEET FOR EACH INDIVIDUAL BUILDING ONSITE MUST SUBMIT A PLUMBING FIXTURE WORKSHEET AS A PART OF THE UTILITY CONNECTION APPLICATION ** *Control of roof downspouts is required. Refer to standard details 02.05.01 & 02.05.03 for typical control methods - attached * *Refer to standard details 02.03.02 & 05.02.01 for typical sedimentation and erosion control methods - attached* ** The approved civil plans did not reflect the same building footprint as the approved building plans. Please note that the NW corner of the Gateway Building extends further north on the approved building plans (B-21-0256) than on the approved civil plans(E-21-0440). The primary area of concern is the existing1500 gallon septic tank. When relocating please know that it cannot be placed within 5' (feet) of any structure. ** * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4- A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 5- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6- FIRE EXTINGUISHERS REQUIRED PER CODE 7- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING 8- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX 9- EXISTING BUILDINGS WILL NEED TO CONTACT CENTRAL PIERCE FIRE & RESCUE AND UPDATE THE KEY IN THE KNOX BOX 10- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/07/2022 Report Inspection Report (Plumbing Rough In Inspection)
03/24/2022 Report Inspection Report (Shear Wall Inspection)
03/30/2022 Report Inspection Report (Frame Inspection)
04/05/2022 Report Inspection Report (Plumbing Rough In Inspection)
04/12/2022 Report Inspection Report (Wallboard / Drywall Inspection)
04/29/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
05/03/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
05/03/2022 Report Inspection Report (Energy (Insulation) Inspection)
05/04/2022 Report Inspection Report (Comment Building Div Inspection)
05/24/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
05/31/2022 Report Inspection Report (Comment Building Div Inspection)
05/31/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
06/15/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
06/21/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
06/28/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/11/2022 Report Inspection Report (Exhaust Hood Inspection)
07/11/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/12/2022 Report Inspection Report (Exhaust Hood Inspection)
07/12/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/13/2022 Report Inspection Report (Exhaust Hood Inspection)
07/13/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/18/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/18/2022 Receipt Receipt for transaction:2022-001378
07/20/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/26/2022 Receipt Receipt for transaction:2022-001443
07/26/2022 Form Revisions to Existing Residential or Commercial Applications (PDF) 1 (Flattened)
07/26/2022 Plans Step by Step - Updated Gas Piping - with fire pit pipe 7-15-24 (Stamped)
07/27/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
07/28/2022 Report Inspection Report (Gas Test Inspection)
08/03/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/08/2022 Report Inspection Report (Comment Building Div Inspection)
08/08/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
08/08/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
08/08/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
08/10/2022 Report Inspection Report (Light Test For Grease Duct Inspection)
08/11/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/15/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/18/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
09/12/2022 Report Inspection Report (Comment Building Div Inspection)
09/27/2022 Report Inspection Report (Engineering Final Inspection)
09/28/2022 Report Inspection Report (Building Final Inspection)
09/28/2022 Report Inspection Report (Plumbing Final Inspection)
10/10/2022 Report Inspection Report (Building Final Inspection)