B-21-0444


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0444
Commercial - Tenant Improvement/Remodel
Closed
WASHINGTON STATE OF
Alteration/Remodel
MODIFY EXISTING FACILITY;REPLACING (9) ANTENNAS;(6)RRHs;(3)RRHs;(2)OVPs;(2) HYBRIDS ON AN EXISTING TOWER~VERIZON
06/16/2021
02/21/2022
07/16/2023
01/12/2023

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
02/21/2022 b-21-0444 plans (Flattened) (Stamped)
Review Type Outcome Est. Completion Date Completed
Planning Review In Progress 07/16/2021
Building Review Approved 06/24/2021
Fire Review Approved 06/22/2021
Engineering Review Approved 06/21/2021

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 08/03/2021
No
Building Permit Fee $391.25 $391.25 Paid 08/03/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 08/03/2021
No
Building Plan Review Fee $254.31 $254.31 Paid 06/17/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Passed 1/12/2023 1/12/2023 01/12/2023
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Comment Engineering Div Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Footing/Setback Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Foundation/Rebar Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Slab/Insulation Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Roof Sheathing Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Shear Wall Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Firewall/Firestop Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Energy (Insulation) Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Frame Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Combination Frame And Rough In Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Ceiling Grid/T-Bar Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Wallboard / Drywall Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Exit Lighting Test Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Hydronic Piping Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Refrigeration Line Test Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Exhaust Hood Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Light Test For Grease Duct Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Exhaust/Vent Fans Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Medical Gas Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Fire Or Smoke Damper Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Cover Inspection/Thrust Blocks Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Hydrostatic Test 200Lbs 2Hrs VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Emergency Radio Test Review Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Engineering Final Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)
Fire Final Inspection VOID 01/17/2023
Joyce Kennedy ((253) 841-5405)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Development & Permitting Services
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Standard Conditions
Development & Permitting Services
* Prior to STARTING site work; request inspection for Erosion and Sediment ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-XX-XXXX IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. This property lies within a regulated Flood Zone. Both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For A0 Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1 foot above grade. (PMC 21.07.060(2)) If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Flood Elevation Certificate is completed based on "Finished Construction" and reviewed and accepted by the City of Puyallup. PERMIT CONDITIONS: 1 COMPLY WITH 2018 IFC AND 2018 IBC 2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6 FIRE EXTINGUISHERS REQUIRED PER CODE 7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
02/07/2022 Plans b-21-0444 application (Flattened)
02/21/2022 Plans b-21-0444 plans (Flattened) (Stamped)
02/21/2022 Permit Permit - Detailed
02/21/2022 Letter Permit Job Card