CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
B-21-0659
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
WA State Building Code Council Fee (Residential) | $25.00 | $25.00 | Paid | 10/04/2021 |
No
|
||||
Building Plan Review Fee | $736.94 | $736.94 | Paid | 10/04/2021 |
No
|
||||
Building Permit Fee | $1,133.75 | $1,133.75 | Paid | 10/04/2021 |
No
|
||||
Resubmittal Fee | $130.00 | $130.00 | Paid | 05/04/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $2,025.69 | $2,025.69 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Building Final Inspection | Not Ready | 4/19/2022 | 4/19/2022 | 04/19/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/19/2022
1 ; provide permit revision for ladder installed with-out permits. (guardrail required as discussed with contractor.)
not ready
|
||||
Building Final Inspection | Failed | 5/27/2022 | 5/27/2022 | 05/27/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
05/27/2022
1 ; provide permit revision for ladder installed with-out permits. ( guardrail required as discussed with contractor.)
not ready
|
||||
Other/Miscellaneous
Carried Forward
05/27/2022
nobody on site at time of insp 9:41 am, call inspector prior to 8:30 am day of inspection to meet on site.
|
||||
Building Final Inspection | Not Ready | 6/3/2022 | 6/3/2022 | 06/03/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
06/03/2022
Talked to contractor, No guardrail installed per last insp. Dwayne will contact shannon monday morning
|
||||
Building Final Inspection | Failed | 6/9/2022 | 6/9/2022 | 06/09/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Resolved
06/09/2022
1 ; provide permit revision for ladder installed with-out permits. ( guardrail required as discussed with contractor.)
not ready
|
||||
Other/Miscellaneous
Carried Forward
06/09/2022
1 ;provide special inspection approval report for install of anchors at ladder to Building as discussed with contractor.
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
General Permit Conditions | Resolved | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
* TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
|
|||||
Re-Roof Conditions | Resolved | Building Division | Standard Conditions | ||
:
RE-ROOF
1) PROVIDE MANUFACTURES SPECIFICATIONS AND INSTALLATION DETAILS ON SITE FOR INSPECTION
2) CALL FOR REQUIRED INSPECTIONS PRIOR TO COVER; REQUIRED FOR SHEATHING REPLACEMENT, STRUCTURAL REPAIR OR INSULATION
3) PROVIDE INSPECTION ACCESS
4) PROVIDE A COPY OF THE PERMIT ON SITE
***MUST PROVIDE DRIP EDGE ON ALL ROOF EDGES***
ACTION CODES (REQUIRED FOR REQUESTING INSPECTIONS)
2210 ROOF SHEATHING
2255 RE-ROOF
2235 FRAME
2925 COMMENT
9900 RESIDENTIAL FINAL
9800 COMMERCIAL FINAL
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
04/19/2022 | Report | Inspection Report (Building Final Inspection) |
05/04/2022 | Plans | Ladder Report (Stamped) |
05/04/2022 | Receipt | Receipt for transaction:2022-000824 |
05/04/2022 | Form | Revised Permit - 05.02.22 (Flattened) |
06/09/2022 | Report | Inspection Report (Building Final Inspection) |
07/13/2022 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.