CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0929


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0929
Retaining Wall
Permit(s) Issued
WESTERN WASHINGTON FAIR ASSOCIATION
Replacement
REPLACE & REBUILD RETAINING WALL
11/12/2021
09/01/2022
10/16/2023

Locations

Property
0420331121

Property
0420334203

Property
0420334204

Property
6022020080

Property
7730000141

Property
7730000142

Address
1522 5TH ST SW, PUYALLUP, WA 98371

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 08/07/2022 08/04/2022
Engineering Review Approved 08/07/2022 08/01/2022
Planning Review Approved 08/07/2022 08/01/2022
Planning Review In Progress 12/02/2021
Building Review Incomplete 11/30/2021
Engineering Review Comments 11/30/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $321.25 $321.25 Paid 08/05/2022
Building Plan Review Fee $208.81 $208.81 Paid 08/05/2022
General Engineering Inspection Fee $130.00 $130.00 Paid 08/05/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Failed 9/28/2022 9/28/2022 09/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
09/28/2022
provide geo tech of record initial report and new report with ok to pour, provide city of puyallup E & S approval from engineering dept.

Footing/Setback Inspection Failed 10/4/2022 10/4/2022 10/04/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/04/2022
PROVIDE PLANS AND GEO TECH APPROVAL

Footing/Setback Inspection Passed w/ Conditions 10/5/2022 10/5/2022 10/05/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
10/05/2022
approved footing with geo or engineer of record addressing drainage pipe and providing final letters at completion

Building Final Inspection Partial Pass 10/21/2022 10/21/2022 10/21/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/21/2022
wall ok to pour with clearances adjusted as discussed.

Building Final Inspection VOID 04/19/2023
CityView System Manger

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Building Permit Standard Conditions Open Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Open Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Miscellaneous Condition Resolved Engineering Division Prior to Issuance 09/01/2022
: The applicant shall submit a copy of the recorded easements for the wall construction as depicted on the approved plans to the City of Puyallup prior to permit issuance. Recorded easements include the 5' permanent wall construction, maintenance, and repair easement, 10' temporary construction easement, and temporary construction easements over entire properties.
Engineering Residential Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard residential conditions: - All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal. - Prior to starting site work, request an erosion and sediment inspection through the CityView portal. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. - Stormwater control of roof downspouts shall be controlled. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Development & Permitting Services Prior to Issuance
: NEED: $$ & CONTRACTOR STATE & BUSINESS LIC-JF Tammy Sorensen <tammy@mailagc.com>
Miscellaneous Condition Resolved Development & Permitting Services
: Disregard this condition. YC

Related Permit & Planning Applications

There are no related items for this permit application.