CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-21-0066


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-21-0066
Civil Construction Permit
Closed
STEP BY STEP FAMILY SUPPORT CENTER
Other
SEWER EXTENSION
02/18/2021
10/21/2021
09/30/2023
04/03/2023

Locations

Property
0420253070

* Address
3303 8TH AVE SE

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review Approved 10/21/2021
Engineering Civil Review Approved 09/13/2021
Engineering Civil Review Approved 04/28/2021
Public Works Collection Review Approved 04/15/2021
Planning Review In Progress 04/09/2021
Planning Review In Progress 03/12/2021
Fire Review Approved 03/08/2021
Public Works Streets Review Approved 03/04/2021
Engineering Civil Review Approved 03/04/2021
Engineering Storm Review Approved 03/04/2021
Public Works Collection Review Approved 02/25/2021
Public Works Water Review Approved 02/24/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 10/11/2021
No
Traffic Control Permit Fee $50.00 $50.00 Paid 10/11/2021
No
Record Drawing Review Fee $200.00 $200.00 Paid 10/11/2021
No
Civil Review Fee $470.00 $470.00 Paid 10/11/2021
No
Engineering Inspection Fee (3%) $3,202.20 $3,202.20 Paid 10/11/2021
No
Engineering Permit Fee $300.00 $300.00 Paid 10/11/2021
No
Civil Review Additional Fee $1,170.00 $1,170.00 Paid 10/11/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Partial Pass 12/13/2021 12/13/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/20/2021 12/20/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/21/2021 12/21/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/27/2021 12/27/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/28/2021 12/29/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/30/2021 12/30/2021
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/3/2022 01/03/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/4/2022 01/04/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/5/2022 01/05/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/12/2022 01/12/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/13/2022 01/13/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/14/2022 01/17/2022
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 1/17/2022 01/17/2022
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 1/18/2022 01/18/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection VOID 01/18/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/19/2022 01/19/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/20/2022 01/20/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/21/2022 01/21/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/24/2022 01/24/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/25/2022 01/25/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/26/2022 01/26/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/27/2022 01/27/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/28/2022 01/28/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/1/2022 02/01/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/3/2022 02/03/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/4/2022 02/04/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/7/2022 02/07/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/11/2022 02/11/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/14/2022 02/14/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/23/2022 02/23/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/28/2022 02/28/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/1/2022 03/01/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/14/2022 07/14/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/16/2022 08/16/2022
Jason Little ((253) 244-0387)
Engineering Daily Inspection Failed 8/23/2022 08/23/2022
Jason Little ((253) 244-0387)
Engineering Punchlist Inspection Failed 8/23/2022 8/24/2022 08/24/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
08/24/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Concrete around monument is failing and needs to be replaced with proper concrete aggregate mix for high and heavy traffic areas. 8. Seal entire concrete monument on 33rd and 5th after replacement. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Failed 8/24/2022 08/24/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
08/24/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Concrete around monument is failing and needs to be replaced with proper concrete aggregate mix for high and heavy traffic areas. 8. Seal entire concrete monument on 33rd and 5th after replacement. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/6/2022 09/06/2022
Michael Rosenau ((253) 344-6753)
Other/Miscellaneous
Carried Forward
09/06/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Concrete around monument is failing and needs to be replaced with proper concrete aggregate mix for high and heavy traffic areas. 8. Seal entire concrete monument on 33rd and 5th after replacement. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/7/2022 09/07/2022
Michael Rosenau ((253) 344-6753)
Other/Miscellaneous
Carried Forward
09/07/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Concrete around monument is failing and needs to be replaced with proper concrete aggregate mix for high and heavy traffic areas. 8. Seal entire concrete monument on 33rd and 5th after replacement. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/13/2022 09/13/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/13/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Seal entire concrete monument on 33rd and 5th after removing excess concrete from asphalt. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/14/2022 09/14/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/14/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. 6. Remove silt fence when stabilization has taken root. 7. Seal entire concrete monument on 33rd and 5th after removing excess concrete from asphalt. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/15/2022 09/15/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/15/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Punchlist Inspection Partial Pass 9/15/2022 09/15/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/15/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/16/2022 09/16/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/16/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/19/2022 09/19/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/19/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/20/2022 09/20/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/20/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/22/2022 09/22/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/22/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/23/2022 09/23/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/23/2022
Punch List "A" 1. Finish sewer main install and all applicable aspects related. 2. Stabilize area near ditch where SS c/o was placed. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance. 4. Remove asphalt/cold mix from stock pile area. 5. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts.

Engineering Daily Inspection Partial Pass 9/26/2022 09/26/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/26/2022
Punch List "A" 1. Stabilize area near ditch where SS c/o was placed. 2. Grade out stock pile area to maintain flow away from ditch and stabilize. *Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance.

Engineering Punchlist Inspection Partial Pass 9/26/2022 09/26/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/26/2022
Punch List "A" 1. Stabilize area near ditch where SS c/o was placed. 2. Grade out stock pile area to maintain flow away from ditch and stabilize. Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw. Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts. 3. Finish sewer main install and all applicable aspects related. 4. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior this permits final acceptance.

Engineering Daily Inspection Partial Pass 9/27/2022 09/27/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/27/2022
Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance.

Engineering Punchlist Inspection Partial Pass 9/27/2022 09/27/2022
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/27/2022
Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior this permits final acceptance.

Engineering Daily Inspection VOID 04/03/2023
Robyn Buck ((253) 435-3617)
Other/Miscellaneous
Outstanding
09/27/2022
Punch List "B" 1. If sewer main is not going to be finished prior to occupancy an AoF should be taken. 2. Need an AoF for as-builts. 3. Sewer and all other corrections and/or AoF must be in place/corrected for E-21-0440 prior to this permits final acceptance.

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Punchlist: Miscellaneous Sewer B Item Resolved Engineering Division Sewer Punchlist Section B
:
Punchlist: Miscellaneous Sewer A Item Resolved Engineering Division Sewer Punchlist Section A
: Stabilize area near ditch where SS c/o was placed.
Punchlist: Miscellaneous Sewer B Item Resolved Engineering Division Sewer Punchlist Section B
:
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Remove asphalt/cold mix from stock pile area.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Grade out stock pile area to maintain flow away from ditch and stabilize.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Remove silt fence when stabilization has taken root.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Stabilization should consist of seed and 2" thick straw or hydroseed and 2" thick straw.
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: Concrete around monument is failing and needs to be replaced with proper concrete aggregate mix for high and heavy traffic areas.
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: Seal entire concrete monument on 33rd and 5th after replacement.
Punchlist: Miscellaneous A Item Resolved Engineering Division Misc. Punchlist Section A
: Pay any overtime inspection fees owing. Please contact Engineering Support Specialist, Robyn, at rbuck@puyallupwa.gov.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Engineering Division Misc. Punchlist Section B
: Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Provide the City with data for all new infrastructure installed for this project Resolved Engineering Division Misc. Punchlist Section B
: Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer, see attached form.
Punchlist: Miscellaneous Sewer B Item Resolved Engineering Division Sewer Punchlist Section B
:

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/18/2022 Report Inspection Report (Engineering Daily Inspection)
01/30/2023 Plans 23--01-26 E21-0066 OFFSITE SEWER MAIN RECORD DRAWINGS
08/24/2022 Report Inspection Report (Engineering Daily Inspection)
08/30/2022 Letter DO NOT USE Inspection Punch List
08/30/2022 Letter Inspection Punch List
09/15/2022 Report Inspection Report (Engineering Daily Inspection)
09/27/2022 Letter Inspection Punch List (Engineering Punchlist Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.