CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-21-0374


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-21-0374
Civil Construction Permit
Expired
KNOBEN G EDWARD & PATRICIA
Other
CIVIL FOR NEW OFFICE BUILDINGBUILDING B-21-0867, DEMO B-17-0780 & B-17-0781
07/20/2021
08/22/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Fire Review VOID 04/12/2022 08/22/2023
Engineering Traffic Review VOID 04/12/2022 08/22/2023
Public Works Water Review VOID 04/12/2022 08/22/2023
Planning Review VOID 04/12/2022 08/22/2023
Engineering Civil Review VOID 04/12/2022 08/22/2023
Public Works Collection Review VOID 04/12/2022 08/22/2023
Fire Review VOID 08/22/2023
Engineering Traffic Review VOID 08/22/2023
Public Works Water Review VOID 08/22/2023
Planning Review VOID 08/22/2023
Engineering Civil Review VOID 08/22/2023
Public Works Collection Review VOID 08/22/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Record Drawing Review Fee $200.00 $200.00 Paid 07/20/2021
No
Civil Review Fee $470.00 $470.00 Paid 07/20/2021
No
Outstanding Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $0.00 $0.00 Not payable Not Paid
Traffic Control Permit Fee $50.00 $0.00 Not payable Not Paid
Traffic Control Plan Review Fee $40.00 $0.00 Not payable Not Paid
Engineering Permit Fee $300.00 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Civil Standard Conditions Open Standard Conditions
Engineering Division
1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abandoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Open Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Certificate of Insurance/CG2012 Open Prior to Issuance
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
Right-of-Way Occupation Bond Open Prior to Issuance
Engineering Division
Street Obstruction Bond must be received prior to issuance

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
03/18/2022 Plans e-21-0374 app (Flattened)
06/01/2022 Letter Permit Review Comment Notice
06/01/2022 Letter Permit Review Comment Notice
06/01/2022 Plans 21545-D-CIVL-2022-03-10 (Flattened)
06/01/2022 Report 21545-R-SSP-2022-03-10 (Flattened)
06/01/2022 Plans 21545c_002 - Civil Comment Response Letter0 (Flattened)
06/01/2022 Plans 21545-D-LAND-2022-02-14-NaturebyDesign0 (Flattened)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.