CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20240014


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20240014
Civil Construction Permit
Permit(s) Issued
HC HOMES INC
FRONTAGE IMPROVEMENTS
01/03/2024
08/28/2024
11/02/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 06/12/2024 06/11/2024
Public Works Streets Review Approved 06/12/2024 06/04/2024
Public Works Collection Review Approved 06/12/2024 06/03/2024
Engineering Traffic Review Approved 06/12/2024 05/30/2024
Engineering Civil Review Approved 06/12/2024 05/21/2024
Public Works Water Review VOID 06/12/2024 05/21/2024
Fire Review Approved 06/12/2024 05/20/2024
Planning Review Approved 04/23/2024 04/29/2024
Public Works Streets Review Failed 04/23/2024 04/25/2024
Engineering Traffic Review Approved 04/23/2024 04/23/2024
Public Works Collection Review Approved 04/23/2024 04/17/2024
Engineering Civil Review Failed 04/23/2024 04/17/2024
Fire Review Approved 04/23/2024 04/16/2024
Public Works Water Review VOID 04/23/2024 03/19/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $1,828.19 $1,828.19 Paid 08/22/2024
Engineering Permit Fee $300.00 $300.00 Paid 08/22/2024
Traffic Control Permit Fee $50.00 $50.00 Paid 01/03/2024
Traffic Control Plan Review Fee $40.00 $40.00 Paid 01/03/2024
Civil Review Fee $470.00 $470.00 Paid 01/03/2024
Record Drawing Review Fee $200.00 $200.00 Paid 01/03/2024
Civil Review Additional Fee $720.00 $720.00 Paid 05/13/2024
Civil Review Additional Fee $360.00 $360.00 Paid 08/22/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Preconstruction Inspection (Pre-Con Meeting) Pending
Michael Rosenau ((253) 344-6753)
Engineering Punchlist Inspection Pending
Michael Rosenau ((253) 344-6753)
Planning Landscape Inspection Pending
Engineering Final Inspection Pending
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Pending
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 08/30/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/18/2024 09/18/2024
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Passed w/ Conditions 9/20/2024 9/20/2024 09/20/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/23/2024 09/23/2024
Michael Rosenau ((253) 344-6753)
Job Start Inspection Passed 09/23/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/24/2024 09/24/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/25/2024 09/25/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/26/2024 09/26/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/27/2024 09/27/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/30/2024 09/30/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/1/2024 10/01/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/2/2024 10/02/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/4/2024 10/04/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/7/2024 10/07/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/8/2024 10/08/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/9/2024 10/09/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/10/2024 10/10/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/11/2024 10/11/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/16/2024 10/16/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/17/2024 10/17/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/18/2024 10/21/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/21/2024 10/21/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/22/2024 10/22/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/23/2024 10/23/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/25/2024 10/25/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/28/2024 10/28/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/29/2024 10/29/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/30/2024 10/30/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/31/2024 10/31/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/1/2024 11/01/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/4/2024 11/04/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/5/2024 11/05/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/6/2024 11/06/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/7/2024 11/07/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/8/2024 11/08/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/13/2024 11/13/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/14/2024 11/14/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/15/2024 11/15/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/18/2024 11/18/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/19/2024 11/19/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/20/2024 11/20/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/21/2024 11/21/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/22/2024 11/22/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/25/2024 11/25/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/26/2024 11/26/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/27/2024 11/27/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/4/2024 12/04/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/5/2024 12/05/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/6/2024 12/06/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/9/2024 12/09/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/10/2024 12/10/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/11/2024 12/11/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/12/2024 12/12/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/13/2024 12/13/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/16/2024 12/16/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/17/2024 12/17/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/18/2024 12/18/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/19/2024 12/19/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/30/2024 12/30/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/31/2024 12/31/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/2/2025 01/02/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/3/2025 01/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/6/2025 01/06/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/7/2025 01/07/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/8/2025 01/08/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/9/2025 01/09/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/10/2025 01/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/13/2025 01/13/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/14/2025 01/14/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/16/2025 01/16/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/21/2025 01/21/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/22/2025 01/22/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/23/2025 01/23/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/24/2025 01/24/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/27/2025 01/27/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/28/2025 01/28/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/31/2025 01/31/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/7/2025 02/07/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/11/2025 02/11/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/21/2025 02/21/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/3/2025 03/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/13/2025 03/13/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/17/2025 03/17/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Passed 3/20/2025 03/20/2025
Michael Rosenau ((253) 344-6753)
Engineering Final Inspection Partial Pass 3/24/2025 03/24/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/25/2025 03/25/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/31/2025 03/31/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/2/2025 04/02/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/3/2025 04/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/4/2025 04/04/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/7/2025 04/07/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/9/2025 04/09/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/14/2025 04/14/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/16/2025 04/16/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/17/2025 04/17/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/18/2025 04/18/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/21/2025 04/21/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/22/2025 04/22/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/24/2025 04/24/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/28/2025 04/28/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/30/2025 04/30/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/1/2025 05/01/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/2/2025 05/02/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/5/2025 05/05/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 5/6/2025 05/06/2025
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Category
Civil Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Resolved Prior to Issuance
Engineering Division
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Performance Bond Resolved Prior to Issuance
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Inadvertent Discovery Plan (IDP) Resolved Prior to Issuance
Engineering Division
Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
Overtime Inspection and Watermain Shutdown Fee Resolved Prior to Issuance
Engineering Division
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Certificate of Insurance/CG2012 Resolved Prior to Issuance
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond Resolved Prior to Issuance
Engineering Division
NOT REQUIRED
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Punchlist: Miscellaneous Stormwater A Item Open Storm Punchlist Section A
Development & Permitting Services
Install threaded cap & adaptors on both cleanouts for infiltration trench along the back of ROW. One of the cleanout risers needs to be straightened up vertically.
Punchlist: Miscellaneous Stormwater A Item Open Storm Punchlist Section A
Development & Permitting Services
Backfill hole around CB# 2.1.
Punchlist: Miscellaneous Streets A Item Open Street Punchlist Section A
Development & Permitting Services
Install Type III Barricade at west end of asphalt sidewalk.
Punchlist: Miscellaneous A Item Open Misc. Punchlist Section A
Development & Permitting Services
Cleanup miscellaneous lumber, pipe, etc. from the site.
Punchlist: Miscellaneous Stormwater A Item Open Storm Punchlist Section A
Development & Permitting Services
Hydroseed/stabilize all exposed soils on the site.
Punchlist: Miscellaneous A Item Open Misc. Punchlist Section A
Development & Permitting Services
Coordinate/Install pole mounted streetlight per approved AMR.
Punchlist: Miscellaneous A Item Open Misc. Punchlist Section A
Development & Permitting Services
Install Storz fitting on new Fire Hydrant on west side of the site.
Punchlist: Provide the City with an electronic version of the record drawings Open Misc. Punchlist Section B
Development & Permitting Services
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.

Related Permit & Planning Applications

Reference Number Status Type
PRRNSF20230918 Permit(s) Issued Residential - New Single Family Dwelling
PRRNSF20230919 Permit(s) Issued Residential - New Single Family Dwelling
PRAMR20241989 Closed Alternative Methods / Materials Request
PRFUP20242011 Closed Franchise Utility Permit
P-19-0061 Expired MISCELLANEOUS PLANNING PERMIT
PLSHP20220104 File Closed Short Plat
PLBDJ20220164 File Closed Boundary Line Adjustment
PLDDG20240023 File Closed Downtown Design Review

Documents & Images

Date Uploaded File Type Name
01/03/2024 Other INFILTRATION EVALUATION LETTER
01/03/2024 Form APPLICATION
01/03/2024 Receipt Receipt for transaction:2024-000014
01/04/2024 Letter Incomplete Application Notice
02/20/2024 Report STORMWATER REPORT
04/30/2024 Letter Permit Review Correction Letter
04/30/2024 Plans OUTDATED > DO NOT USE R0-03 Puyallup Duplex Street Lighting_Revised Electrical Permit Set 2024 (Flattened)
05/09/2024 Report Exhibit 2 - Interceptor Trench Flow Calculation - PROJECT REPORT
05/09/2024 Report Exhibit 4 - DOE 2019 SWMMWW Table V-1_7 ROCK PROTECTION AT OUTFALLS
05/09/2024 Report CRITICAL AREA ASSESSMENT - RESUB
05/13/2024 Receipt Receipt for transaction:2024-000993
06/13/2024 Plans 20069-Entrance Grading Exhibit 5.16.2024 (Flattened)
06/13/2024 Plans Exhibit 1 - Developed Interceptor Trench Basin (Flattened)
06/13/2024 Report Exhibit 3 - 8-in_ Pipe Diameter Conveyance Calculation (Flattened)
06/13/2024 Report R1-07 SWPPP - Site Development lota 1 and 2 2024_04_29 (Flattened)
06/13/2024 Plans CIVIL PLANS - APPROVED (Stamped)
08/22/2024 Receipt Receipt for transaction:2024-001739
08/28/2024 Pre-Construction Meeting - PRCCP20240014 - 43RD AVE SW DUPLEXES-20240828_093402-Meeting Recording
08/28/2024 Permit Permit - Detailed
09/20/2024 Report Inspection Report (Erosion And Sediment Inspection)
09/27/2024 Plans APPROVED TCP