Permit Application Status
PRCTI20220811
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 07/01/2022 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 07/01/2022 |
Building Permit Fee | $5,608.75 | $5,608.75 | Paid | 07/01/2022 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 07/01/2022 |
Building Plan Review Fee | $3,645.69 | $3,645.69 | Paid | 05/24/2022 |
Mechanical Plan Review Fee | $41.60 | $41.60 | Paid | 05/24/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/01/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 06/15/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 08/30/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 09/27/2022 |
Building Re-Inspection Fee | $130.00 | $130.00 | Paid | 10/14/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $10,170.04 | $10,170.04 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Failed | 7/27/2022 | 7/27/2022 | 07/27/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/27/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Frame Inspection | Not Ready | 8/3/2022 | 8/3/2022 | 08/03/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/03/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Frame Inspection | Failed | 8/15/2022 | 8/15/2022 | 08/15/2022 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/15/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
08/15/2022
1:uncover columns at ext wall rocked without frame approval
2:provide electrical inspection.
3:provide fire approval for soffits prior to frame approval
4:will talk to other inspectors about wall framing covered without frame approval.
5:complete all mono coat and removal of abandoned equipment and framing.
|
||||
Frame Inspection | Partial Pass | 8/17/2022 | 8/17/2022 | 08/17/2022 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/17/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
08/17/2022
1:remove rock from sw wall for insulation / foil insp
2:provide architects ok or fix on loads from new hard lids added to existing hard lids
3: ok to rock interior walls at own risk pending plan review of revisions
|
||||
Frame Inspection | Not Ready | 8/22/2022 | 8/22/2022 | 08/22/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/22/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
08/22/2022
1 : inspection of of framing at exterior wall at s. e. corner only. ( complete vapor barrier at exterior wall prior to inspection ) not ready
|
||||
Slab/Insulation Inspection | Partial Pass | 8/23/2022 | 8/23/2022 | 08/23/2022 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 8/23/2022 | 8/23/2022 | 08/23/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/23/2022
1. Kid section OK to tape
2.all other areas rescrew per conversation with contractor
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/24/2022 | 8/24/2022 | 08/24/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2022
1. Kid section OK to tape
2.all other areas rescrew per conversation with contractor
|
||||
Frame Inspection | Failed | 9/14/2022 | 9/14/2022 | 09/14/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/14/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
09/14/2022
1 : inspection of of framing at exterior wall at s. e. corner only. ( complete vapor barrier at exterior wall prior to inspection ) not ready
|
||||
Other/Miscellaneous
Carried Forward
09/14/2022
1. provide attachment detail for this area from the architect
2. provide electrical cover approval prior to next inspection
3.not ready
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 9/22/2022 | 9/22/2022 | 09/22/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Frame Inspection | Partial Pass | 9/23/2022 | 9/23/2022 | 09/23/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/23/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
09/23/2022
1 : inspection of of framing at exterior wall at s. e. corner only. ( complete vapor barrier at exterior wall prior to inspection ) not ready
|
||||
Other/Miscellaneous
Carried Forward
09/23/2022
1. provide attachment detail for this area from the architect
2. provide electrical cover approval prior to next inspection
3.not ready
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 9/26/2022 | 9/26/2022 | 09/26/2022 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 9/26/2022 | 9/26/2022 | 09/26/2022 |
Shannon King ((253) 840-6684) | ||||
Erosion And Sediment Inspection | VOID | 09/29/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 9/29/2022 | 09/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Ceiling Grid/T-Bar Inspection | Failed | 9/30/2022 | 9/30/2022 | 09/30/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/30/2022
1. complete all perimeter tie wires as discussed with contractor
2. complete positive connection of diffusers as discussed with contractor
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 10/3/2022 | 10/3/2022 | 10/03/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete all perimeter tie wires as discussed with contractor
2. complete positive connection of diffusers as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete all ceiling grid requirements as discussed with contractor
2. provide splice connection detail sheet at main bar at the time of next inspection
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 10/4/2022 | 10/4/2022 | 10/04/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/04/2022
1. complete all perimeter tie wires as discussed with contractor
2. complete positive connection of diffusers as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
10/04/2022
1. complete all ceiling grid requirements as discussed with contractor
2. provide splice connection detail sheet at main bar at the time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
10/04/2022
1. complete all ceiling requirements as discussed with contractor
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 10/5/2022 | 10/5/2022 | 10/05/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/05/2022
1. complete all perimeter tie wires as discussed with contractor
2. complete positive connection of diffusers as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
10/05/2022
1. complete all ceiling grid requirements as discussed with contractor
2. provide splice connection detail sheet at main bar at the time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
10/05/2022
1. complete all ceiling requirements as discussed with contractor
|
||||
Mechanical Final Inspection | Not Ready | 10/5/2022 | 10/5/2022 | 10/05/2022 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Not Ready | 10/5/2022 | 10/5/2022 | 10/05/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/05/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Carried Forward
10/05/2022
1 : inspection of of framing at exterior wall at s. e. corner only. ( complete vapor barrier at exterior wall prior to inspection ) not ready
|
||||
Other/Miscellaneous
Carried Forward
10/05/2022
1. provide attachment detail for this area from the architect
2. provide electrical cover approval prior to next inspection
3.not ready
|
||||
Frame Inspection | Passed | 10/11/2022 | 10/11/2022 | 10/11/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/11/2022
1.remove flooring from under wall plates so it will bear on concrete
2.complete framing on door opening
3.complete all framing above mechanical equipment
4.complete all fasteners at studs to wall plates 5.verify that electrical J/Box in concrete are abandoned where new wall plates are placed
6. Provide architectural plans for all walls removed and demo
7. Remove all abandoned ducting, framing, electrical conduit thru out space
|
||||
Other/Miscellaneous
Resolved
10/11/2022
1 : inspection of of framing at exterior wall at s. e. corner only. ( complete vapor barrier at exterior wall prior to inspection ) not ready
|
||||
Other/Miscellaneous
Resolved
10/11/2022
1. provide attachment detail for this area from the architect
2. provide electrical cover approval prior to next inspection
3.not ready
|
||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 10/11/2022 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 10/11/2022 | ||
David Drake ((253) 864-4171) | ||||
Building Final Inspection | Not Ready | 10/11/2022 | 10/11/2022 | 10/11/2022 |
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Passed | 10/11/2022 | 10/11/2022 | 10/11/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/11/2022
1. complete all perimeter tie wires as discussed with contractor
2. complete positive connection of diffusers as discussed with contractor
|
||||
Other/Miscellaneous
Resolved
10/11/2022
1. complete all ceiling grid requirements as discussed with contractor
2. provide splice connection detail sheet at main bar at the time of next inspection
|
||||
Other/Miscellaneous
Resolved
10/11/2022
1. complete all ceiling requirements as discussed with contractor
|
||||
Fire Final Inspection | Failed | 10/11/2022 | 10/11/2022 | 10/11/2022 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/11/2022
1. Fire Sprinkler system not Ready. Multiple heads installed incorrectly in tiles. Safety cap still installed. Missing trim rings. Paint on Sprinkler head. Paint on concealed sprinkler trim cap.
2. Exit Signs do not show correct Exit path. Exit paths shall be free of stocking materials. Exit Light test not completed. Isles to painted on floor per approved plans.
3. Fire extinguishers shall be installed every 75' of travel and visible from pathways.
4. Install all ceiling tiles.
5. Install all drywall to collect smoke and heat.
|
||||
Mechanical Final Inspection | Not Ready | 10/11/2022 | 10/11/2022 | 10/11/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/11/2022
1. complete duct wrap as discussed with contractor
2. provide final balance report at time of next inspection
|
||||
Wallboard / Drywall Inspection | Passed | 10/12/2022 | 10/12/2022 | 10/12/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Fire Final Inspection | Failed with Fee | 10/13/2022 | 10/13/2022 | 10/13/2022 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/13/2022
1. Fire Sprinkler system not Ready. Multiple heads installed incorrectly in tiles. Safety cap still installed. Missing trim rings. Paint on Sprinkler head. Paint on concealed sprinkler trim cap.
2. Exit Signs do not show correct Exit path. Exit paths shall be free of stocking materials. Exit Light test not completed. Isles to painted on floor per approved plans.
3. Fire extinguishers shall be installed every 75' of travel and visible from pathways.
4. Install all ceiling tiles.
5. Install all drywall to collect smoke and heat.
|
||||
Other/Miscellaneous
Carried Forward
10/13/2022
Pay 130$ reinspection fee prior to next inspection. Not Ready
|
||||
Comment Engineering Div Inspection | VOID | 10/14/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Fire Final Inspection | Partial Pass | 10/18/2022 | 10/18/2022 | 10/18/2022 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/18/2022
1. Fire Sprinkler system not Ready. Multiple heads installed incorrectly in tiles. Safety cap still installed. Missing trim rings. Paint on Sprinkler head. Paint on concealed sprinkler trim cap.
2. Exit Signs do not show correct Exit path. Exit paths shall be free of stocking materials. Exit Light test not completed. Isles to painted on floor per approved plans.
3. Fire extinguishers shall be installed every 75' of travel and visible from pathways.
4. Install all ceiling tiles.
5. Install all drywall to collect smoke and heat.
|
||||
Other/Miscellaneous
Resolved
10/18/2022
Pay 130$ reinspection fee prior to next inspection. Not Ready
|
||||
Building Final Inspection | Passed | 10/21/2022 | 10/21/2022 | 10/21/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Comment Building Div Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Footing/Setback Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Foundation/Rebar Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Underfloor Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Block Wall Rebar Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Shear Wall Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Firewall/Firestop Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Energy (Insulation) Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Re-Roof Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Refrigeration Line Test Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Exhaust/Vent Fans Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Fire Or Smoke Damper Inspection | VOID | 10/11/2022 | 10/21/2022 | |
Kevin Spruell ((253) 841-5590) | ||||
Engineering Final Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Planning Final Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Slab/Insulation Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) | ||||
Building Final Inspection | VOID | 10/13/2022 | 10/21/2022 | |
Kevin Spruell ((253) 841-5590) | ||||
Mechanical Final Inspection | VOID | 10/13/2022 | 10/21/2022 | |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
10/11/2022
1. complete duct wrap as discussed with contractor
2. provide final balance report at time of next inspection
|
||||
Fire Final Inspection | VOID | 10/21/2022 | ||
Kevin Spruell ((253) 841-5590) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
Fire Alarm Conditions
The system will only be considered existing provided, the original panel remains in same location, the original panel is not rewired, and if the original panel can be replaced like for like if required.
If there is an existing Remote annunciator on the exterior of the building, it is required to be moved inside the vestibule.
The Fire Alarm System is required to be monitored throughout construction. The System can be put into test for up to 8hrs a day. Anything longer than 8hrs will require Fire Code Officials approval and result in Fire Watch.
RTU’S will be required to be tested for shut down with fire alarm.
All maintenance and inspections are required to be completed prior to any inspections.
L&I Final required prior to Fire Final.
Fire Sprinkler Conditions
The Fire Sprinkler System is required to be functional and monitored throughout construction. The System can be put into test for up to 8hrs a day. Anything longer than 8hrs will require Fire Code Officials approval and result in Fire Watch.
All maintenance and inspections are required to be completed prior to any inspections.
All tampers will be tested at Fire Sprinkler Final.
Building Conditions
Comply with 2018 IFC and 2018 IBC.
Separate permits required for fire alarm and fire sprinkler systems.
Exit lighting test required contractor to provide light meter.
Fire extinguishers required per code.
A Knox box is required at the front entry on the exterior of the building.
PIV must have a Knox lock or approved lock with an extra key provided in Knox box.
All above items to be completed prior to fire final. Fire final required before building final.
All FACP and Riser Room signs are required to be installed and legible. Replace if necessary.
All Fire Lane No Parking signs shall be updated or replaced as needed.
Fire Lane stripping shall be updated as needed.
Address required
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Open | |
Development & Permitting Services
|
Reference Number | Status | Type |
---|---|---|