CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20221032


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20221032
Commercial - Tenant Improvement/Remodel
Closed
DCT PUYALLUP INDUSTRIAL PARK LLC
Alteration/Remodel
INSTALL HIGH STORAGE RACKS IN AN PREVIOUSLY APPROVED COOLER INSTALLATION
06/30/2022
09/20/2022
04/25/2023
10/27/2022

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 09/16/2022 09/19/2022
Building Review Approved 09/16/2022 09/14/2022
Building Review Failed 07/15/2022 07/13/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $125.25 $125.25 Paid 09/20/2022
Building Plan Review Fee $81.41 $81.41 Paid 07/05/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 09/20/2022
Resubmittal Fee $130.00 $130.00 Paid 09/06/2022
Outstanding Fees Amount Paid Owing Date Paid
Permit Double Fee $125.25 $125.25 Paid 09/20/2022


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Failed 9/22/2022 9/22/2022 09/22/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/22/2022
1:provide approved plans 2:provide special inspection report 3:complete exit signs prior to final on cooler permit

Building Final Inspection Passed 10/27/2022 10/27/2022 10/27/2022
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 10/27/2022
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 10/27/2022
Monty Johnson ((253) 770-3326)
Fire Final Inspection VOID 10/27/2022
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 10/27/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• A “HMIS” hazard material information sheet will be required for review before a final is issued. • A copy of the HMIS will be sent to central pierce fire & rescue for review. • Rack placards will need to be installed before final. • No storage on racks until finaled. • A fire final will be required before a building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with prccpxxxx has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXX for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). - Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)). - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f). - Steps shall be taken to prevent drainage onto adjacent lots. - No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20230973 Closed Commercial - Tenant Improvement/Remodel
PRMH20231131 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRFS20231238 Permit(s) Issued Fire Sprinklers
PRFA20231294 Closed Fire Alarms

Documents & Images

Date Uploaded File Type Name
07/05/2022 Receipt Receipt for transaction:2022-001256
07/13/2022 Letter Permit Review Comment Notice
09/19/2022 Report AAR-Testing (Stamped)
09/19/2022 Other DWANF_POWERSTUD_TP_revB (Stamped)
09/19/2022 Other Power-Stud-SD1-ICC-ES-Evaluation-2054375 (Stamped)
09/19/2022 Plans PERMIT DOCS3 (Stamped)
09/20/2022 Letter Permit - Detailed
09/20/2022 Receipt Receipt for transaction:2022-001849
09/20/2022 Letter Permit Job Card
10/27/2022 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.