CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20230973
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 08/10/2023 |
| Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 08/10/2023 |
| Exhaust Vent Fan (Bath) Fee | $14.10 | $14.10 | Paid | 08/10/2023 |
| Suspended, Recessed Wall, or Floor unit Heater Fee | $39.10 | $39.10 | Paid | 08/10/2023 |
| Building Permit Fee | $2,113.75 | $2,113.75 | Paid | 08/10/2023 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 08/10/2023 |
| Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $40.25 | Paid | 08/10/2023 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 08/10/2023 |
| Plumbing Fixtures Fee | $65.00 | $65.00 | Paid | 08/10/2023 |
| Water Heater Fee | $65.00 | $65.00 | Paid | 08/10/2023 |
| Building Plan Review Fee | $1,373.94 | $1,373.94 | Paid | 07/03/2023 |
| Mechanical Plan Review Fee | $18,298.93 | $18,298.93 | Paid | 07/03/2023 |
| Plumbing Plan Review Fee | $136.66 | $136.66 | Paid | 07/03/2023 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 08/10/2023 |
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $850.10 | $850.10 | Paid | 08/10/2023 |
| Water System Development Charge Fee - Tenant Improvment/Addition | $524.42 | $524.42 | Paid | 08/10/2023 |
| Mechanical Plan Review Fee | $69.75 | $69.75 | Paid | 08/10/2023 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $23,975.10 | $23,975.10 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Foundation/Rebar Inspection | Partial Pass | 8/24/2023 | 8/24/2023 | 08/24/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2023
1. this was a slab inspection for infills on interior of building
2. approved pending special inspection approval per city approved plans
|
||||
| Slab/Insulation Inspection | Not Ready | 8/25/2023 | 8/25/2023 | 08/25/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/25/2023
1. provide special inspection approval for rebar epoxy
|
||||
| Plumbing Rough In Inspection | Passed | 8/29/2023 | 8/29/2023 | 08/29/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
| Frame Inspection | Not Ready | 9/18/2023 | 9/18/2023 | 09/19/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/19/2023
1.provide verification of R-38 insulation on roof
2.complete stud bridging detail 20 S3.1 of city approved plans
3.complete header detail per city approved plans
4.complete approved space at top of stud to deflection track on detail 9 S3.1 per city approved plans
5. provide electrical cover approval at time of next inspection
6.not ready
|
||||
| Frame Inspection | Passed | 9/20/2023 | 9/20/2023 | 09/21/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
09/19/2023
1.provide verification of R-38 insulation on roof
2.complete stud bridging detail 20 S3.1 of city approved plans
3.complete header detail per city approved plans
4.complete approved space at top of stud to deflection track on detail 9 S3.1 per city approved plans
5. provide electrical cover approval at time of next inspection
6.not ready
|
||||
| Energy (Insulation) Inspection | Partial Pass | 9/25/2023 | 9/25/2023 | 09/25/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/25/2023
1. complete insulation at east wall above wall line
2.ok to insulate at exterior walls with batts
|
||||
| Shear Wall Inspection | Partial Pass | 9/26/2023 | 9/26/2023 | 09/26/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/26/2023
1. this was an insulation inspection
2. demising wall approved to 9' 6" for cover on warehouse side
3. exterior walls approved for cover
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 9/28/2023 | 9/28/2023 | 09/29/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/29/2023
1. drywall on interior to include bathroom repairs approved
2. drinking fountain wall not approved for rigid
3.batts approved on drinking fountain wall ok to complete rigid
4. the rest of the demising wall rigid approved ok to cover
|
||||
| Firewall/Firestop Inspection | Partial Pass | 10/2/2023 | 10/2/2023 | 10/02/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/02/2023
1.rigid insulation approved at drinking fountain wall
2.WMP approved at interior demising walls
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 10/9/2023 | 10/9/2023 | 10/09/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/09/2023
1. drywall on interior to include bathroom repairs approved
2. drinking fountain wall not approved for rigid
3.batts approved on drinking fountain wall ok to complete rigid
4. the rest of the demising wall rigid approved ok to cover
|
||||
| Ceiling Grid/T-Bar Inspection | Not Ready | 10/30/2023 | 10/30/2023 | 10/30/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/30/2023
1. ceiling over entryway insulation and vapor barrier approved
2. ok to drop boarders
3.provide electrical cover approval at time of next inspection
4. not ready
|
||||
| Plumbing Final Inspection | Not Ready | 10/30/2023 | 10/30/2023 | 10/30/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/30/2023
1. provide cane guard at drinking fountain
2. insulate and secure water lines at bath sinks as discussed with contractor
|
||||
| Ceiling Grid/T-Bar Inspection | Not Ready | 10/31/2023 | 10/31/2023 | 10/31/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/31/2023
1. ceiling over entryway insulation and vapor barrier approved
2. ok to drop boarders
3.provide electrical cover approval at time of next inspection
4. not ready
|
||||
|
Other/Miscellaneous
Carried Forward
10/31/2023
1. cancelled on site by contractor
|
||||
| Plumbing Final Inspection | Passed | 10/31/2023 | 10/31/2023 | 10/31/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/31/2023
1. provide cane guard at drinking fountain
2. insulate and secure water lines at bath sinks as discussed with contractor
|
||||
| Ceiling Grid/T-Bar Inspection | Failed | 11/1/2023 | 11/1/2023 | 11/01/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/01/2023
1. ceiling over entryway insulation and vapor barrier approved
2. ok to drop boarders
3.provide electrical cover approval at time of next inspection
4. not ready
|
||||
|
Other/Miscellaneous
Carried Forward
11/01/2023
1. cancelled on site by contractor
|
||||
|
Other/Miscellaneous
Carried Forward
11/01/2023
1. complete pod detail per engineering as discussed with contractor
|
||||
| Fire Final Inspection | Passed | 11/6/2023 | 11/6/2023 | 11/06/2023 |
| David Drake ((253) 864-4171) | ||||
| Ceiling Grid/T-Bar Inspection | Passed | 11/6/2023 | 11/6/2023 | 11/06/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
11/06/2023
1. ceiling over entryway insulation and vapor barrier approved
2. ok to drop boarders
3.provide electrical cover approval at time of next inspection
4. not ready
|
||||
|
Other/Miscellaneous
Resolved
11/06/2023
1. cancelled on site by contractor
|
||||
|
Other/Miscellaneous
Resolved
11/06/2023
1. complete pod detail per engineering as discussed with contractor
|
||||
| Building Final Inspection | Not Ready | 11/16/2023 | 11/16/2023 | 11/16/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/16/2023
1.provide engineering final approval prior to next inspection
2. provide clarification from achertect on door hardware and exit signage at doors going into warehouse as discussed with contractor
|
||||
| Comment Engineering Div Inspection | VOID | 11/20/2023 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Cover Inspection/Thrust Blocks Inspection | VOID | 11/20/2023 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Engineering Final Inspection | Passed | 11/20/2023 | 11/20/2023 | 11/20/2023 |
| Jeff Hill ((253) 204-5633) | ||||
| Building Final Inspection | Passed w/ Conditions | 11/21/2023 | 11/21/2023 | 11/21/2023 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
11/21/2023
1.provide engineering final approval prior to next inspection
2. provide clarification from achertect on door hardware and exit signage at doors going into warehouse as discussed with contractor
|
||||
| Comment Building Div Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Footing/Setback Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Roof Sheathing Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Combination Frame And Rough In Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Exit Lighting Test Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Hydronic Piping Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Gas Test Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Mechanical Rough In Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Refrigeration Line Test Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Exhaust Hood Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Light Test For Grease Duct Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Exhaust/Vent Fans Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Medical Gas Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Fire Or Smoke Damper Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Hydrostatic Test 200Lbs 2Hrs | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Emergency Radio Test Review Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Planning Final Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Foundation/Rebar Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
08/24/2023
1. this was a slab inspection for infills on interior of building
2. approved pending special inspection approval per city approved plans
|
||||
| Slab/Insulation Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
08/25/2023
1. provide special inspection approval for rebar epoxy
|
||||
| Energy (Insulation) Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
09/25/2023
1. complete insulation at east wall above wall line
2.ok to insulate at exterior walls with batts
|
||||
| Shear Wall Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
09/26/2023
1. this was an insulation inspection
2. demising wall approved to 9' 6" for cover on warehouse side
3. exterior walls approved for cover
|
||||
| Firewall/Firestop Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/02/2023
1.rigid insulation approved at drinking fountain wall
2.WMP approved at interior demising walls
|
||||
| Wallboard / Drywall Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Mechanical Final Inspection | VOID | 11/21/2023 | ||
| Kevin Spruell ((253) 841-5590) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
| Engineering Commercial Standard Conditions | Resolved | Standard Conditions |
|
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City of Puyallup’s stormwater fact sheet.
- Curb, gutter, sidewalk and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
| Side Sewer Sample Tee | Resolved | Prior to Occupancy |
|
Engineering Division
A side sewer sampling connection is required to be installed on the commercial sanitary side sewer service in accordance with City policy ENG 21-03. The site plan shall depict the location and connection of the new or existing sampling connection as per City Standard Detail 04.03.04. [Yianni Charitou @ 07/27/2023 2:20 PM]
Side sewer sampling connection requirement waived per attached email with subject line RE: Catffineated Clean Out Location. [Yianni Charitou @ 09/18/2023 8:09 AM]
|
||
| Backflow Protection Device - Commercial DCVA | Resolved | Prior to Completion |
|
Engineering Division
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
As-builts depict existing backflow devices. [Yianni Charitou @ 07/27/2023 8:43 AM]
|
||
| Miscellaneous Condition | Resolved | Standard Conditions |
|
Engineering Division
The proposed frontage improvements on VALLEY AVE NW are not required by the City of Puyallup. The applicant may obtain a right-of-way permit to construct any or all of the frontage improvements in the public right-of-way as depicted on sheet A1.10. [Yianni Charitou @ 08/01/2023 12:41 PM]
Sheet A1.10. will not be constructed. Jeff Hill COP
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.