Permit Application Status
PRCTI20221400
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 11/17/2022 |
Building Permit Fee | $593.25 | $593.25 | Paid | 11/17/2022 |
Building Plan Review Fee | $385.61 | $385.61 | Paid | 09/26/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 11/17/2022 |
Exhaust Vent Fan (Bath) Fee | $14.10 | $14.10 | Paid | 11/17/2022 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 11/17/2022 |
Plumbing Fixtures Fee | $26.00 | $26.00 | Paid | 11/17/2022 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 11/17/2022 |
Mechanical Plan Review Fee | $35.17 | $35.17 | Paid | 09/26/2022 |
Plumbing Plan Review Fee | $42.90 | $42.90 | Paid | 09/26/2022 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $2,367.78 | $2,367.78 | Paid | 11/17/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 11/01/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 11/10/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $4,094.81 | $4,094.81 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Not Ready | 12/6/2022 | 12/6/2022 | 12/06/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/06/2022
1 ; complete all rough -in of plumbing ,mechanical, and electrical cover approval prior to frame inspection,
not ready
|
||||
Plumbing Rough In Inspection | Failed | 12/8/2022 | 12/8/2022 | 12/08/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/08/2022
1. provide test on supply as discussed with contractor
2.provide test on DWV as discussed with contractor
|
||||
Combination Frame And Rough In Inspection | Failed | 12/8/2022 | 12/8/2022 | 12/08/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/08/2022
1 ; remove screws from top track to ceiling grid as discussed with contractor.
2 ; seal penetration in top plates at wood construction at plumbing penetrations.
|
||||
Plumbing Rough In Inspection | Partial Pass | 12/9/2022 | 12/9/2022 | 12/09/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/09/2022
1. provide test on supply as discussed with contractor
2.provide test on DWV as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
1 ; completer plumbing vent to exterior of building prior to ceiling cover inspection.
2 ; approved below slab and in wall at restroom.
|
||||
Foundation/Rebar Inspection | Partial Pass | 12/12/2022 | 12/12/2022 | 12/12/2022 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 12/12/2022 | 12/12/2022 | 12/12/2022 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/12/2022
1 ; complete all rough -in of plumbing ,mechanical, and electrical cover approval prior to frame inspection,
not ready
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
1 ; complete plumbing vent to exterior of building prior to ceiling cover inspection. ( d.w.v. tested above wall with 10' head test)
|
||||
Wallboard / Drywall Inspection | Passed | 12/16/2022 | 12/16/2022 | 12/16/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 12/20/2022 | 12/20/2022 | 12/20/2022 |
Shannon King ((253) 840-6684) | ||||
Exhaust Hood Inspection | Passed | 12/29/2022 | 12/29/2022 | 12/29/2022 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/29/2022
fart fans ok
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 12/29/2022 | 12/29/2022 | 12/29/2022 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/29/2022
complete rivets, complete pods
|
||||
Exhaust/Vent Fans Inspection | Passed | 12/30/2022 | 12/30/2022 | 12/30/2022 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Final Inspection | Not Ready | 12/30/2022 | 12/30/2022 | 12/30/2022 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Not Ready | 12/30/2022 | 12/30/2022 | 12/30/2022 |
Monty Johnson ((253) 770-3326) | ||||
Ceiling Grid/T-Bar Inspection | Passed | 12/30/2022 | 12/30/2022 | 12/30/2022 |
Monty Johnson ((253) 770-3326) | ||||
Planning Final Inspection | VOID | 1/3/2023 | 01/03/2023 | |
Chris Beale ((253) 841-5418) | ||||
Building Final Inspection | Passed | 1/5/2023 | 1/5/2023 | 01/05/2023 |
Monty Johnson ((253) 770-3326) | ||||
Fire Final Inspection | Passed | 1/5/2023 | 1/5/2023 | 01/05/2023 |
David Drake ((253) 864-4171) | ||||
Exit Lighting Test Inspection | Passed | 1/5/2023 | 01/05/2023 | |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 1/5/2023 | 01/05/2023 | |
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 01/05/2023 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 01/05/2023 | ||
David Drake ((253) 864-4171) | ||||
Comment Engineering Div Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Hydronic Piping Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Engineering Final Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/08/2022
1 ; remove screws from top track to ceiling grid as discussed with contractor.
2 ; seal penetration in top plates at wood construction at plumbing penetrations.
|
||||
Plumbing Rough In Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/09/2022
1 ; completer plumbing vent to exterior of building prior to ceiling cover inspection.
2 ; approved below slab and in wall at restroom.
|
||||
Foundation/Rebar Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/12/2022
1 ; complete plumbing vent to exterior of building prior to ceiling cover inspection. ( d.w.v. tested above wall with 10' head test)
|
||||
Comment Building Div Inspection | VOID | 01/05/2023 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down.
• Fire extinguishers required per code
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Development & Permitting Services
Development Engineering standard commercial conditions:
** If a sewer sampling tee is not currently installed at this site the installation of one will be required prior to occupancy . - A separate utility permit must be obtained prior to the installation of a sewer sampling tee **
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Side Sewer Sample Tee | Open | Prior to Occupancy |
Engineering Division
A side sewer sampling connection is required to be installed on the commercial sanitary side sewer service in accordance with City policy ENG 21-03. If a sewer sampling tee is not currently installed at this site the installation of one will be required prior to occupancy. See sewer sampling connection City Standard Detail 04.03.04, attached in CityView.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
PROVIDE CONTRACTOR INFORMATION AND VERIFY BUSINESS LICENSE PRIOR TO ISSUANCE -EM
REC'D 12.5.22, RESOLVED CONDITION AND ISSUED PERMIT. ~ JJ
|
Reference Number | Status | Type |
---|---|---|
PRSG20221797 | Closed | Sign/Awning |