Permit Application Status

PRCTI20221793


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20221793
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
Construction of a swim school including the pool in the former Sears store located in the South Hill Mall ~ GOLDFISH SWIM SCHOOL
11/21/2022
03/15/2023
03/27/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 03/08/2023 03/08/2023
Building Review Approved 03/08/2023 03/08/2023
Fire Review Approved 03/08/2023 02/22/2023
Planning Review Approved 03/08/2023 02/21/2023
Fire Review Approved 01/11/2023 01/18/2023
Building Review Failed 01/11/2023 01/18/2023
Engineering Review Failed 01/11/2023 01/11/2023
Planning Review Approved 01/11/2023 01/06/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/15/2023
AC Unit Fee $39.10 $39.10 Paid 03/15/2023
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $71.90 $71.90 Paid 03/15/2023
Building Permit Fee $5,490.00 $5,490.00 Paid 03/15/2023
Mechanical Permit Fee $40.00 $40.00 Paid 03/15/2023
Backflow Preventor Fee $52.00 $52.00 Paid 11/21/2022
Plumbing Permit Fee $40.00 $40.00 Paid 03/15/2023
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 03/15/2023
Gas Piping (Plumbing) Fee $8.50 $8.50 Paid 03/15/2023
Sump, Sewage, or Ejector Pumps Fee $13.00 $13.00 Paid 03/15/2023
Water Heater Fee $13.00 $13.00 Paid 03/15/2023
Building Plan Review Fee $3,568.50 $3,568.50 Paid 11/21/2022
Mechanical Plan Review Fee $98.15 $98.15 Paid 11/21/2022
Plumbing Plan Review Fee $108.39 $108.39 Paid 11/21/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 03/15/2023
Resubmittal Fee $130.00 $130.00 Paid 02/10/2023
Sewer System Development ChargeFee - Tenant Improvment/Addition $40,379.75 $40,379.75 Paid 03/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Failed 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/30/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans.

Foundation/Rebar Inspection Failed 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/30/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans.

Footing/Setback Inspection Passed w/ Conditions 3/31/2023 3/31/2023 03/31/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/30/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans.

Other/Miscellaneous
Outstanding
03/31/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans 5 ; approved with special inspection addressing corrections.

Foundation/Rebar Inspection Passed w/ Conditions 3/31/2023 3/31/2023 03/31/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/30/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans.

Other/Miscellaneous
Outstanding
03/31/2023
1 ; complete all rebar at f3 footings as per city approved plans. 2 ; complete install of holdowns as per plans prior to footing inspection. 3 ; provide special inspection approval of epoxy and rebar. 4 ; provide geo-tech approval for soil bearing as required per plans 5 ; approved with special inspection addressing corrections.

Plumbing Below Slab Inspection Partial Pass 4/6/2023 4/6/2023 04/06/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/06/2023
1 ; provide as built below plumbing approval from mechanical engineer of record prior to approval. 2 ; test approved as noted on sheet P101 of City approved plans.

Slab/Insulation Inspection Not Ready 4/21/2023 4/21/2023 04/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/21/2023
1.cancelled on site by contractor

Plumbing Rough In Inspection Not Ready 4/21/2023 4/21/2023 04/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/21/2023
1. cancelled on site by contractor

Plumbing Below Slab Inspection Not Ready 4/21/2023 4/21/2023 04/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/21/2023
1 ; provide as built below plumbing approval from mechanical engineer of record prior to approval. 2 ; test approved as noted on sheet P101 of City approved plans.

Other/Miscellaneous
Resolved
04/24/2023
1.provide install instructions for sump tank for pool at time of next inspection as discussed with contractor

Plumbing Below Slab Inspection Partial Pass 4/24/2023 04/24/2023
Shannon King ((253) 840-6684)
Roof Sheathing Inspection Not Ready 4/24/2023 4/24/2023 04/24/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection Partial Pass 4/25/2023 4/25/2023 04/25/2023
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Partial Pass 5/15/2023 5/15/2023 05/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
04/21/2023
1 ; provide as built below plumbing approval from mechanical engineer of record prior to approval. 2 ; test approved as noted on sheet P101 of City approved plans.

Other/Miscellaneous
Resolved
05/15/2023
1.provide install instructions for sump tank for pool at time of next inspection as discussed with contractor

Mechanical Rough In Inspection Not Ready 5/26/2023 5/26/2023 05/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/26/2023
1. cancelled on site by contractor

Plumbing Rough In Inspection Not Ready 5/26/2023 5/26/2023 05/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/26/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
05/26/2023
1. cancelled on site by contractor

Combination Frame And Rough In Inspection Partial Pass 6/2/2023 6/2/2023 06/02/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/02/2023
1.framing of walls at demising wall south approved can cover one side 2.provide insulation on hot water lines 3. provide fire protection at electrical boxes in rated walls 4. no ceilings approved for cover 5. did not look at any mechanical

Slab/Insulation Inspection Failed 6/5/2023 6/5/2023 06/05/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/05/2023
1.cancelled on site by contractor

Other/Miscellaneous
Carried Forward
06/05/2023
1 ; provide min. bar lap, clearance from soil to rebar ,and all rebar as per City approved plans. 2 ; ok to proceed with special inspection approval.

Combination Frame And Rough In Inspection Partial Pass 6/6/2023 6/6/2023 06/06/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/06/2023
1.framing of walls at demising wall south approved can cover one side 2.provide insulation on hot water lines 3. provide fire protection at electrical boxes in rated walls 4. no ceilings approved for cover 5. did not look at any mechanical

Plumbing Below Slab Inspection Partial Pass 6/14/2023 6/14/2023 06/14/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 6/15/2023 6/15/2023 06/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/15/2023
1 ; approved ceiling cover in rooms - (102,104,106,106.1-106.12,110 ,111) only 2 ; complete framing of ceiling and fire cover approval prior to reinspection. (not ready)

Wallboard / Drywall Inspection Partial Pass 6/15/2023 6/15/2023 06/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/15/2023
1 ; inspection of drywall nailing complete at grid line- (H-J,9-13) except rooms 102,109,115 (not ready at time of inspection) 3 ;provide min. 1'' gap at drywall to pan deck as required at deflection track as noted on City approved plans.

Mechanical Rough In Inspection Partial Pass 6/15/2023 6/15/2023 06/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/15/2023
1. cancelled on site by contractor

Combination Frame And Rough In Inspection Not Ready 6/15/2023 6/15/2023 06/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/15/2023
1.framing of walls at demising wall south approved can cover one side 2.provide insulation on hot water lines 3. provide fire protection at electrical boxes in rated walls 4. no ceilings approved for cover 5. did not look at any mechanical

Plumbing Below Slab Inspection Partial Pass 6/21/2023 6/21/2023 06/21/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 6/21/2023 6/21/2023 06/21/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/21/2023
1 ; inspection of drywall nailing complete at grid line- (H-J,9-13) except rooms 102,109,115 (not ready at time of inspection) 3 ;provide min. 1'' gap at drywall to pan deck as required at deflection track as noted on City approved plans.

Plumbing Rough In Inspection Partial Pass 6/21/2023 6/21/2023 06/21/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/21/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
06/21/2023
1. cancelled on site by contractor

Plumbing Below Slab Inspection Partial Pass 6/26/2023 6/26/2023 06/26/2023
Shannon King ((253) 840-6684)
Gas Test Inspection Passed w/ Conditions 6/29/2023 6/29/2023 06/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/29/2023
1 ; gas pipe test approved at 60 psi. 2 ; remove abandoned gas pipe from roof prior to building final as discussed with contractor.

Slab/Insulation Inspection Partial Pass 7/5/2023 7/5/2023 07/05/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2023
1 ; provide min. bar lap, clearance from soil to rebar ,and all rebar as per City approved plans. 2 ; ok to proceed with special inspection approval.

Other/Miscellaneous
Carried Forward
07/05/2023
slab pour back 9.4 to 9, k3 line to j ok with special inspectors approval.

Mechanical Rough In Inspection Partial Pass 7/5/2023 7/5/2023 07/05/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2023
mech in lid or room 109 ok

Plumbing Rough In Inspection Partial Pass 7/5/2023 7/5/2023 07/05/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
07/05/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
07/05/2023
trough drains filled with water and holding.

Combination Frame And Rough In Inspection Partial Pass 7/5/2023 7/5/2023 07/05/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2023
1: hard lid framing room 109 ok

Foundation/Rebar Inspection Partial Pass 7/7/2023 7/7/2023 07/07/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/07/2023
flatwork around pool progressing with special insp.

Plumbing Rough In Inspection Passed w/ Conditions 7/7/2023 7/7/2023 07/07/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
07/07/2023
1:trough drains ok with small leak fixed at N:E corner of pool.

Combination Frame And Rough In Inspection Partial Pass 7/11/2023 7/11/2023 07/11/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/11/2023
mop sink dwv in existing wall ok, dwv tested 9ft up from floor only

Wallboard / Drywall Inspection Partial Pass 7/12/2023 7/12/2023 07/12/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/12/2023
1 ; inspection of drywall nailing complete at grid line- (H-J,9-13) except rooms 102,109,115 (not ready at time of inspection) 3 ;provide min. 1'' gap at drywall to pan deck as required at deflection track as noted on City approved plans.

Other/Miscellaneous
Carried Forward
07/12/2023
1: small section in existing wall in pump room ok.

Energy (Insulation) Inspection Not Ready 7/19/2023 7/19/2023 07/19/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/19/2023
1 ; complete insulation at north,west, exterior walls as discussed with contractor. not ready

Combination Frame And Rough In Inspection Not Ready 7/19/2023 7/19/2023 07/19/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/19/2023
1 ; complete all framing and plumbing rough-in ,and plumbing on test prior to frame inspection.

Combination Frame And Rough In Inspection Failed 7/21/2023 7/21/2023 07/21/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/21/2023
1 ; complete all framing and plumbing rough-in ,and plumbing on test prior to frame inspection.

Other/Miscellaneous
Carried Forward
07/21/2023
1 ; inspection of east shower wall only. 2 ; provide electrical cover approval prior to frame approval. 3 ; insulate hotwater lines prior to next inspection

Energy (Insulation) Inspection Failed 7/21/2023 7/21/2023 07/21/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/21/2023
1 l complete insulation at north ,west, exterior wall as discussed with contractor.

Wallboard / Drywall Inspection Partial Pass 7/21/2023 7/21/2023 07/21/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 7/24/2023 7/24/2023 07/24/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
07/24/2023
1 ; complete insulation at north ,west, exterior wall as discussed with contractor.

Wallboard / Drywall Inspection Not Ready 7/24/2023 7/24/2023 07/24/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/24/2023
1 ; cancel per contractor - area already approved on 7/21/2023

Energy (Insulation) Inspection Partial Pass 7/25/2023 7/25/2023 07/25/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 7/28/2023 7/28/2023 07/28/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/28/2023
west wall next to pool insulation ok.

Comment Building Div Inspection Not Ready 7/31/2023 7/31/2023 07/31/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/31/2023
1 ; cancel per contractor.

Energy (Insulation) Inspection Partial Pass 8/1/2023 8/1/2023 08/01/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Failed 8/1/2023 8/1/2023 08/01/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
08/01/2023
1 ; complete all framing and plumbing rough-in ,and plumbing on test prior to frame inspection.

Other/Miscellaneous
Resolved
08/01/2023
1 ; inspection of east shower wall only. 2 ; provide electrical cover approval prior to frame approval. 3 ; insulate hotwater lines prior to next inspection

Other/Miscellaneous
Carried Forward
08/01/2023
1 ; complete top track attachment at grid line - (Jn,10-13) (9.4,J4-K9)

Wallboard / Drywall Inspection Partial Pass 8/1/2023 8/1/2023 08/01/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
08/01/2023
1 ; cancel per contractor - area already approved on 7/21/2023

Frame Inspection Partial Pass 8/2/2023 8/2/2023 08/02/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
08/02/2023
1 ; approved ceiling cover in rooms - (102,104,106,106.1-106.12,110 ,111) only 2 ; complete framing of ceiling and fire cover approval prior to reinspection. (not ready)

Mechanical Rough In Inspection Partial Pass 8/2/2023 8/2/2023 08/02/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 8/3/2023 8/3/2023 08/03/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 8/4/2023 8/4/2023 08/04/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Partial Pass 8/9/2023 8/9/2023 08/09/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
08/09/2023
1 ; complete top track attachment at grid line - (Jn,10-13) (9.4,J4-K9)

Other/Miscellaneous
Carried Forward
08/09/2023
entry vestibule frame and energy ok

Energy (Insulation) Inspection Partial Pass 8/16/2023 8/16/2023 08/16/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 8/16/2023 8/16/2023 08/16/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 8/17/2023 8/17/2023 08/17/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Failed 9/5/2023 9/5/2023 09/05/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/05/2023
1 ; complete all ceiling grid requirements as discussed with contractor. not ready

Ceiling Grid/T-Bar Inspection Partial Pass 9/7/2023 9/7/2023 09/07/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
09/07/2023
1 ; complete all ceiling grid requirements as discussed with contractor. not ready

Other/Miscellaneous
Carried Forward
09/07/2023
1 ; complete firestop of penetrations at rated wall above ceiling at south wall in room - 101 office. (ok to cover except 1 tile for reinspection)

Planning Final Inspection VOID 09/14/2023
Rachael N. Brown ((253) 770-3363)
Comment Engineering Div Inspection VOID 09/14/2023
Jason Little ((253) 435-3636)
Engineering Final Inspection Passed w/ Conditions 9/14/2023 09/14/2023
Jason Little ((253) 435-3636)
Building Final Inspection Failed 9/14/2023 9/14/2023 09/14/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/14/2023
1 ; secure hot water tank prior to next inspection. 2 ; complete install of self closer at acid room door. 3 ; remove plastic bag from smoke detector in boiler room. 4 ; provide all back flow certs. at time of next inspection. 5 ; insulate all hot water supply lines in boiler room. 6 ; complete all T.P.R. valve drains to mop sink. 7 ; complete drain for back flow to mop sink. 8 ; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. 9 ; complete shower trim at public showers. 10 ; complete plumbing boots at sinks at restrooms. 11 ; complete ceiling at electrical room. 12 ; complete accessible benches in restroom as per City approved plans. 13 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 14 ; complete vertical grab bars at mens & womens restroom 39''-41'' as per City approved plans. 15 ; complete door hardware at vestibule front door. 16 ; complete stairs at pool as per Detail 6 of page AQ2.1 17 ; complete trap primers at shower as discussed with contractor. 18 ; complete handrail at stairs as per City approved plans. 19 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. 20 ; remove all construction debris from roof. 21 ; paint all new gas pipe on roof and next to gas meter.

Mechanical Final Inspection Failed 9/14/2023 9/14/2023 09/14/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/14/2023
1 ; secure hot water tank prior to next inspection. 2 ; complete install of self closer at acid room door. 3 ; remove plastic bag from smoke detector in boiler room. 4 ; provide all back flow certs. at time of next inspection. 5 ; insulate all hot water supply lines in boiler room. 6 ; complete all T.P.R. valve drains to mop sink. 7 ; complete drain for back flow to mop sink. 8 ; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. 9 ; complete shower trim at public showers. 10 ; complete plumbing boots at sinks at restrooms. 11 ; complete ceiling at electrical room. 12 ; complete accessible benches in restroom as per City approved plans. 13 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 14 ; complete vertical grab bars at mens & womens restroom 39''-41'' as per City approved plans. 15 ; complete door hardware at vestibule front door. 16 ; complete stairs at pool as per Detail 6 of page AQ2.1 17 ; complete trap primers at shower as discussed with contractor. 18 ; complete handrail at stairs as per City approved plans. 19 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. 20 ; remove all construction debris from roof. 21 ; paint all new gas pipe on roof and next to gas meter. 22 . need to review balance reports and final letters at next inspection. (not ready )

Plumbing Final Inspection Failed 9/14/2023 9/14/2023 09/14/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/14/2023
1 ; secure hot water tank prior to next inspection. 2 ; complete install of self closer at acid room door. 3 ; remove plastic bag from smoke detector in boiler room. 4 ; provide all back flow certs. at time of next inspection. 5 ; insulate all hot water supply lines in boiler room. 6 ; complete all T.P.R. valve drains to mop sink. 7 ; complete drain for back flow to mop sink. 8 ; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. 9 ; complete shower trim at public showers. 10 ; complete plumbing boots at sinks at restrooms. 11 ; complete ceiling at electrical room. 12 ; complete accessible benches in restroom as per City approved plans. 13 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 14 ; complete vertical grab bars at mens & womens restroom 39''-41'' as per City approved plans. 15 ; complete door hardware at vestibule front door. 16 ; complete stairs at pool as per Detail 6 of page AQ2.1 17 ; complete trap primers at shower as discussed with contractor. 18 ; complete handrail at stairs as per City approved plans. 19 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. 20 ; remove all construction debris from roof. 21 ; paint all new gas pipe on roof and next to gas meter. 22 . need to review balance reports and final letters at next inspection. (not ready )

Building Final Inspection Partial Pass 9/15/2023 9/15/2023 09/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/15/2023
1 ; secure hot water tank prior to next inspection. * 2 ; complete install of self closer at acid room door. 3 ; insulate all hot water supply lines in boiler room. 4 ; complete all T.P.R. valve drains to mop sink. * 5 ; complete drain for backflow to mop sink. 6; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. * 7 ; complete plumbing boots at sinks at restrooms. * 8 ; complete ceiling at electrical room. * 9 ; complete accessible benches in restroom as per City approved plans. * 10 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. * 11 ; complete handrail at stairs as per City approved plans. * 12 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. * 13; remove all construction debris from roof. 14 ; paint all new gas pipe on roof and next to gas meter. 15 ; approved for training for 10 working days from 9/15/2023 16 - items with * required for t.c.o.

Building Final Inspection Partial Pass 9/21/2023 9/21/2023 09/21/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
09/21/2023
1 ; secure hot water tank prior to next inspection. 2 ; complete install of self closer at acid room door. 3 ; remove plastic bag from smoke detector in boiler room. 4 ; provide all back flow certs. at time of next inspection. 5 ; insulate all hot water supply lines in boiler room. 6 ; complete all T.P.R. valve drains to mop sink. 7 ; complete drain for back flow to mop sink. 8 ; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. 9 ; complete shower trim at public showers. 10 ; complete plumbing boots at sinks at restrooms. 11 ; complete ceiling at electrical room. 12 ; complete accessible benches in restroom as per City approved plans. 13 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 14 ; complete vertical grab bars at mens & womens restroom 39''-41'' as per City approved plans. 15 ; complete door hardware at vestibule front door. 16 ; complete stairs at pool as per Detail 6 of page AQ2.1 17 ; complete trap primers at shower as discussed with contractor. 18 ; complete handrail at stairs as per City approved plans. 19 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. 20 ; remove all construction debris from roof. 21 ; paint all new gas pipe on roof and next to gas meter. 22 . need to review balance reports and final letters at next inspection. (not ready )

Other/Miscellaneous
Carried Forward
09/21/2023
1 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 2; remove all construction debris from roof. 3 ; paint all new gas pipe on roof and next to gas meter. 4 ; T.C.O. approved for 10 working days from 9/21/2023

Firewall/Firestop Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Hydronic Piping Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Carbon Monoxide Detectors Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Medical Gas Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 09/29/2023
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/07/2023
1 ; complete firestop of penetrations at rated wall above ceiling at south wall in room - 101 office. (ok to cover except 1 tile for reinspection)

Mechanical Final Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/14/2023
1 ; secure hot water tank prior to next inspection. 2 ; complete install of self closer at acid room door. 3 ; remove plastic bag from smoke detector in boiler room. 4 ; provide all back flow certs. at time of next inspection. 5 ; insulate all hot water supply lines in boiler room. 6 ; complete all T.P.R. valve drains to mop sink. 7 ; complete drain for back flow to mop sink. 8 ; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. 9 ; complete shower trim at public showers. 10 ; complete plumbing boots at sinks at restrooms. 11 ; complete ceiling at electrical room. 12 ; complete accessible benches in restroom as per City approved plans. 13 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. 14 ; complete vertical grab bars at mens & womens restroom 39''-41'' as per City approved plans. 15 ; complete door hardware at vestibule front door. 16 ; complete stairs at pool as per Detail 6 of page AQ2.1 17 ; complete trap primers at shower as discussed with contractor. 18 ; complete handrail at stairs as per City approved plans. 19 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. 20 ; remove all construction debris from roof. 21 ; paint all new gas pipe on roof and next to gas meter. 22 . need to review balance reports and final letters at next inspection. (not ready )

Frame Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
07/31/2023
1 ; cancel per contractor.

Building Final Inspection VOID 09/29/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/15/2023
1 ; secure hot water tank prior to next inspection. * 2 ; complete install of self closer at acid room door. 3 ; insulate all hot water supply lines in boiler room. 4 ; complete all T.P.R. valve drains to mop sink. * 5 ; complete drain for backflow to mop sink. 6; complete all permanent signage at exit doors ,restrooms, changing rooms, occupant load signage as per City approved plans. * 7 ; complete plumbing boots at sinks at restrooms. * 8 ; complete ceiling at electrical room. * 9 ; complete accessible benches in restroom as per City approved plans. * 10 ; complete urinal 17'' max. a.f.f. in restroom as per City approved plans. * 11 ; complete handrail at stairs as per City approved plans. * 12 ; remove all construction debris from accessible route,parking lot and containers as discussed with contractor. * 13; remove all construction debris from roof. 14 ; paint all new gas pipe on roof and next to gas meter. 15 ; approved for training for 10 working days from 9/15/2023 16 - items with * required for t.c.o.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler, Fire Alarm contractor required to contact ddrake@puyallupwa.gov prior to design • Fire watch is required when sprinkler system is out of service in existing buildings. • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Development & Permitting Services Standard Conditions
: Development Engineering standard commercial conditions: ** The disinfection systems used are Nex-Gen20 chlorinator and Acid Rite feeding systems are closed systems and will not cause a spill. See Engineering Plan Review Responses #1 (4). ** ** If a sewer sampling tee is not installed on the existing sewer lateral one will be installed prior to granting occupancy. See City Standard 04.03.04 shown on P201 of this plan set ** ** The disposal of all sand filter media, replaced every 7 - 8 years will be disposed in the trash as indicated by the applicant. See Engineering Plan Review Responses #1 (5) ** ** As noted the flow control valve is required to be set at 50 GPM. As noted on P201 of this plan set ** ** Installation, filling and draining of the pool shall comply with applicable county health department requirements. The pool water shall be dechlorinated and have a neutral PH prior to entering the sewer system ** ** The decholrinator filter unit will be installed to filter backwash water and pool water when drained to the sanitary sewer system. See Engineering Plan Review Responses #1 (8). ** **The pool cannot be connected to the Fruitland Mutual water system unless the water service is protected by a reduced pressure backflow assembly (RPBA) ** ** Installation, filling, and draining of the pool shall comply with applicable county health department requirements. Pool water shall be dechlorinated and have a neutral PH prior to entering the storm sewer system ** - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
New Fire Alarm System Conditions Open Development & Permitting Services Standard Conditions
: Fire Alarm designer required to email ddrake@puyallupwa.gov prior to design. This design will not completely comply with city municipal code and will require approval for deviation.

Related Permit & Planning Applications

Reference Number Status Type
PRFS20230175 Closed Fire Sprinklers
PRFA20230277 Closed Fire Alarms
PRSG20230623 Closed Sign/Awning

Documents & Images

Date Uploaded File Type Name
03/09/2023 Form Plumbing fixture worksheet_10-21-22 (Stamped)
03/09/2023 Report 20221118 Struct Calc (Goldfish Swim School) 2220785_20 (Stamped)
11/21/2022 Receipt Receipt for transaction:2022-002321
03/09/2023 Form print_project_summary_form_Elec (Stamped)
03/09/2023 Form print_project_summary_form_Mech (Stamped)
03/09/2023 Form Certificate_Water_Availability_Letter (Stamped)
03/09/2023 Plans Griffolyn-Type-55-FR-Product-Data-2092684 (Stamped)
03/09/2023 Plans Kawneer - ADMC040EN (Stamped)
03/09/2023 Plans SolarBan Glazing (Stamped)
03/09/2023 Plans WSEC_project_summary_form (Stamped)
02/10/2023 Receipt Receipt for transaction:2023-000214
03/09/2023 Plans Goldfish Swim School Complete Combined Plan Set (Stamped)
03/15/2023 Letter Permit - Detailed
03/15/2023 Receipt Receipt for transaction:2023-000418
03/15/2023 Letter Permit Job Card
03/30/2023 Report Inspection Report (Footing/Setback Inspection)
03/31/2023 Report Inspection Report (Footing/Setback Inspection)
04/06/2023 Report Inspection Report (Foundation/Rebar Inspection)
04/06/2023 Report Inspection Report (Foundation/Rebar Inspection)
04/06/2023 Report Inspection Report (Plumbing Below Slab Inspection)
04/21/2023 Report Inspection Report (Slab/Insulation Inspection)
04/21/2023 Report Inspection Report (Plumbing Rough In Inspection)
04/24/2023 Report Inspection Report (Plumbing Below Slab Inspection)
04/24/2023 Report Inspection Report (Roof Sheathing Inspection)
04/25/2023 Report Inspection Report (Shear Wall Inspection)
05/15/2023 Report Inspection Report (Plumbing Below Slab Inspection)
05/26/2023 Report Inspection Report (Mechanical Rough In Inspection)
05/26/2023 Report Inspection Report (Plumbing Rough In Inspection)
06/02/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
06/05/2023 Report Inspection Report (Slab/Insulation Inspection)
06/06/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
06/14/2023 Report Inspection Report (Plumbing Below Slab Inspection)
06/15/2023 Report Inspection Report (Frame Inspection)
06/15/2023 Report Inspection Report (Wallboard / Drywall Inspection)
06/15/2023 Report Inspection Report (Mechanical Rough In Inspection)
06/15/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
06/21/2023 Report Inspection Report (Plumbing Below Slab Inspection)
06/21/2023 Report Inspection Report (Wallboard / Drywall Inspection)
06/21/2023 Report Inspection Report (Plumbing Rough In Inspection)
06/26/2023 Report Inspection Report (Plumbing Below Slab Inspection)
06/29/2023 Report Inspection Report (Gas Test Inspection)
07/05/2023 Report Inspection Report (Mechanical Rough In Inspection)
07/05/2023 Report Inspection Report (Plumbing Rough In Inspection)
07/05/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
07/19/2023 Report Inspection Report (Energy (Insulation) Inspection)
07/19/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
07/21/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
07/21/2023 Report Inspection Report (Energy (Insulation) Inspection)
07/21/2023 Report Inspection Report (Wallboard / Drywall Inspection)
07/24/2023 Report Inspection Report (Energy (Insulation) Inspection)
07/25/2023 Report Inspection Report (Wallboard / Drywall Inspection)
07/25/2023 Report Inspection Report (Energy (Insulation) Inspection)
07/25/2023 Report Inspection Report (Plumbing Below Slab Inspection)
07/31/2023 Report Inspection Report (Comment Building Div Inspection)
08/01/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
08/01/2023 Report Inspection Report (Energy (Insulation) Inspection)
08/01/2023 Report Inspection Report (Wallboard / Drywall Inspection)
08/02/2023 Report Inspection Report (Frame Inspection)
08/03/2023 Report Inspection Report (Mechanical Rough In Inspection)
08/03/2023 Report Inspection Report (Wallboard / Drywall Inspection)
08/04/2023 Report Inspection Report (Wallboard / Drywall Inspection)
08/09/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
08/16/2023 Report Inspection Report (Energy (Insulation) Inspection)
08/16/2023 Report Inspection Report (Mechanical Rough In Inspection)
08/16/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
08/17/2023 Report Inspection Report (Mechanical Rough In Inspection)
08/22/2023 Report Inspection Report (Wallboard / Drywall Inspection)
09/05/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
09/07/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
09/14/2023 Map Side sewer / GI as-built
09/14/2023 Side sewer / GI pic1
09/14/2023 Side sewer / GI pic2
09/14/2023 Report Inspection Report (Engineering Final Inspection)
09/14/2023 Report Inspection Report (Building Final Inspection)
09/14/2023 Report Inspection Report (Mechanical Final Inspection)
09/14/2023 Report Inspection Report (Plumbing Final Inspection)
09/15/2023 Report Inspection Report (Building Final Inspection)
09/21/2023 Report Inspection Report (Building Final Inspection)
09/29/2023 Report Inspection Report (Plumbing Final Inspection)
09/29/2023 Report Inspection Report (Building Final Inspection)
10/28/2023 Other Certificate of Occupancy