Permit Application Status
PRCTI20221876
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 03/15/2023 |
Building Permit Fee | $593.25 | $593.25 | Paid | 03/15/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 03/15/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 03/15/2023 |
Plumbing Fixtures Fee | $78.00 | $78.00 | Paid | 03/15/2023 |
Water Heater Fee | $13.00 | $13.00 | Paid | 03/15/2023 |
Building Plan Review Fee | $385.61 | $385.61 | Paid | 12/08/2022 |
Mechanical Plan Review Fee | $26.00 | $26.00 | Paid | 12/08/2022 |
Plumbing Plan Review Fee | $76.70 | $76.70 | Paid | 12/08/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 03/15/2023 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $4,250.50 | $4,250.50 | Paid | 03/15/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/02/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/27/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/20/2023 |
Plumbing Fixtures Fee | $26.00 | $26.00 | Paid | 04/20/2023 |
$0.00
|
||||
Sewer System Development ChargeFee - Tenant Improvment/Addition | $1,700.20 | $1,700.20 | Paid | 05/17/2023 |
$5,950.70
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $7,959.26 | $7,959.26 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Plumbing Below Slab Inspection | Partial Pass | 4/17/2023 | 4/17/2023 | 04/17/2023 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/17/2023
1; provide as-built below slab plumbing plans prior to approval.
2 ; test tank as per install instructions of equipment.
3 ; contractor will need to add 2 floor sinks to plumbing permit prior to approval of below slab inspection.
|
||||
Frame Inspection | Partial Pass | 5/18/2023 | 5/18/2023 | 05/18/2023 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
05/18/2023
1 ; remove screws from top track of framing to ceiling grid as discussed with contractor.
2 ; complete wall bracing at 4' o.c. staggered as per City approved plans prior to ceiling grid inspection.
|
||||
Frame Inspection | Partial Pass | 5/19/2023 | 5/19/2023 | 05/19/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/19/2023
1 ; remove screws from top track of framing to ceiling grid as discussed with contractor.
2 ; complete wall bracing at 4' o.c. staggered as per City approved plans prior to ceiling grid inspection.
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 6/5/2023 | 6/5/2023 | 06/05/2023 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
06/05/2023
1 ; provide electrical cover approval of ceiling prior to ceiling grid inspection.
2 ; complete all ceiling grid requirement as discussed with contractor.
|
||||
Ceiling Grid/T-Bar Inspection | Passed w/ Conditions | 6/9/2023 | 6/9/2023 | 06/09/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
06/09/2023
1 ; provide electrical cover approval of ceiling prior to ceiling grid inspection.
2 ; complete all ceiling grid requirement as discussed with contractor.
|
||||
Other/Miscellaneous
Outstanding
06/09/2023
1. provide missing T-bar as discussed with contractor
2. ok to cover
|
||||
Building Final Inspection | Not Ready | 6/26/2023 | 6/26/2023 | 06/26/2023 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
06/26/2023
1 ; provide fire final prior to building final inspection approval.
2 ; talked about building, plumbing ,and mechanical final requirements.
3 ; provide Health Dept. pre-final inspection report at time of building final inspection.
not ready
|
||||
Plumbing Final Inspection | Not Ready | 6/26/2023 | 6/26/2023 | 06/26/2023 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
06/26/2023
1 ; provide fire final prior to building final inspection approval.
2 ; talked about building, plumbing ,and mechanical final requirements.
3 ; provide Health Dept. pre-final inspection report at time of building final inspection.
not ready
|
||||
Fire Final Inspection | Failed | 6/27/2023 | 6/27/2023 | 06/27/2023 |
David Drake ((253) 864-4171) | ||||
Other/Miscellaneous
Carried Forward
06/28/2023
Fire Alarm and Fire Sprinkler required in new storage room. Alternative is to cut the wall down 2' and open for heat and smoke detection by neighboring rooms within footage reach.
|
||||
Fire Or Smoke Damper Inspection | VOID | 06/28/2023 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 06/28/2023 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 06/28/2023 | ||
David Drake ((253) 864-4171) | ||||
Erosion And Sediment Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Building Div Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Underfloor Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Block Wall Rebar Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Re-Roof Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Engineering Final Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Floodproof Certification Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Elevation Verification Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Planning Final Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | VOID | 07/11/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
05/19/2023
1 ; remove screws from top track of framing to ceiling grid as discussed with contractor.
2 ; complete wall bracing at 4' o.c. staggered as per City approved plans prior to ceiling grid inspection.
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Fire Prevention | Standard Conditions | ||
:
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|