CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20230882
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 08/30/2023 |
Building Permit Fee | $542.75 | $542.75 | Paid | 08/30/2023 |
Building Plan Review Fee | $352.79 | $352.79 | Paid | 06/20/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 08/30/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $1,185.54 | $1,185.54 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Partial Pass | 8/31/2023 | 8/31/2023 | 09/01/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Comment Building Div Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Footing/Setback Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Roof Sheathing Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Medical Gas Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Exhaust/Vent Fans Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Exhaust Hood Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Hydronic Piping Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Exit Lighting Test Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Hydronic Piping Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Fire Final Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Planning Final Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Engineering Final Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Emergency Radio Test Review Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Fire Or Smoke Damper Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | VOID | 03/05/2024 | ||
Shannon King ((253) 840-6684) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2018 IFC and 2018 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
Reference Number | Status | Type |
---|---|---|
PRFS20231226 | Closed | Fire Sprinklers |
Date Uploaded | File Type | Name |
---|---|---|
02/05/2024 | Letter | Permit Expiration Notice |
03/05/2024 | Report | Inspection Report (Building Final Inspection) |
06/20/2023 | Receipt | Receipt for transaction:2023-001145 |
07/19/2023 | Form | APPLICATION FORM Building Permit Application 2023_202305181229557439_Flattened (Flattened) |
07/19/2023 | Plans | CONSTRUCTION PLAN SET Avanti Permit Set_06132023_Flattened (Stamped) |
08/30/2023 | Letter | Permit - Detailed |
08/30/2023 | Receipt | Receipt for transaction:2023-001680 |
09/01/2023 | Report | Inspection Report (Frame Inspection) |
09/05/2023 | Report | Inspection Report (Wallboard / Drywall Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView