CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20231271
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 12/04/2023 |
Building Permit Fee | $853.75 | $853.75 | Paid | 12/04/2023 |
Building Plan Review Fee | $554.94 | $554.94 | Paid | 09/13/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 12/04/2023 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $850.10 | $850.10 | Paid | 12/04/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 11/13/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $2,728.79 | $2,728.79 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Final Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Ceiling Grid/T-Bar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Other/Miscellaneous
Outstanding
02/16/2024
1) Inspect and repair sprinkler heads, escutcheon and clearance.
2) Fire Alarm - Verify with email from Fire Alarm Contractor level
3) Provide 1inch duct clearance at exhaust hood per plans
4) Electrical final by L&I - Test - Emergency lighting after electrical final.
Final Not approved.
Fire alarm and Fire sprinkler systems are in service.
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 2/2/2024 | 2/2/2024 | 02/02/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
02/02/2024
1:fix tie wires at all light
2:screw diffusers to grid
|
||||
Building Final Inspection | Not Ready | 2/14/2024 | 2/14/2024 | 02/14/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
02/14/2024
1:provide fire and electrical final prior to building.
|
||||
Fire Final Inspection | Failed | 2/16/2024 | 2/16/2024 | 02/16/2024 |
Ray Cockerham ((253) 841-5585) | ||||
Other/Miscellaneous
Carried Forward
02/16/2024
1) Inspect and repair sprinkler heads, escutcheon and clearance.
2) Fire Alarm - Verify with email from Fire Alarm Contractor level
3) Provide 1inch duct clearance at exhaust hood per plans
4) Electrical final by L&I - Test - Emergency lighting after electrical final.
Final Not approved.
Fire alarm and Fire sprinkler systems are in service.
|
||||
Building Final Inspection | VOID | 08/14/2024 | ||
CityView System Manger |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• Fire extinguishers required per code
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
02/05/2024 | Report | Inspection Report (Wallboard / Drywall Inspection) |
07/05/2024 | Letter | Permit Expiration Notice |
09/13/2023 | Receipt | Receipt for transaction:2023-001779 |
11/01/2023 | Letter | Permit Review Correction Letter |
11/13/2023 | Receipt | Receipt for transaction:2023-002154 |
11/30/2023 | Plans | CONSTRUCTION PLAN SET (Stamped) |
11/30/2023 | Form | PLUMBING FIXTURE WORKSHEET (Stamped) |
11/30/2023 | Form | WATER AVAILABILITY CERTIFICATE (Stamped) |
12/04/2023 | Letter | Permit - Detailed |
12/04/2023 | Receipt | Receipt for transaction:2023-002288 |
12/05/2023 | Letter | Permit Job Card |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.