Summary

PRCTI20240313
Commercial - Tenant Improvement/Remodel
Closed
MULTICARE HEALTH SYSTEM
Alteration/Remodel
Alteration to an existing Urology/MMA clinic to create a soiled utility room. - GOOD SAM MOB, 3RD FLOOR UROLOGY/MMA CLINIC
02/29/2024
04/24/2024
12/20/2024
06/13/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 04/26/2024 04/22/2024
Engineering Review Approved 04/26/2024 04/18/2024
Fire Review Approved 04/26/2024 04/17/2024
Engineering Traffic Review Approved 04/26/2024 04/16/2024
Planning Review Approved 04/26/2024 04/15/2024
Fire Review Approved 04/19/2024 04/12/2024
Building Review Failed 04/19/2024 04/12/2024
Planning Review Approved 04/19/2024 04/11/2024
Engineering Traffic Review Approved 04/19/2024 04/09/2024
Engineering Review Approved 04/19/2024 04/08/2024
Building Review Failed 04/01/2024 04/02/2024
Engineering Traffic Review Approved 04/01/2024 03/28/2024
Engineering Review Approved 04/01/2024 03/27/2024
Fire Review Approved 04/01/2024 03/26/2024
Planning Review Approved 04/01/2024 03/07/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/24/2024
Exhaust Vent Fan (Bath) Fee $14.10 $14.10 Paid 04/24/2024
Building Permit Fee $972.75 $972.75 Paid 04/24/2024
Mechanical Permit Fee $40.00 $40.00 Paid 04/24/2024
Plumbing Fixtures Fee $13.00 $13.00 Paid 04/24/2024
Plumbing Permit Fee $40.00 $40.00 Paid 04/24/2024
Building Plan Review Fee $632.29 $632.29 Paid 03/01/2024
Mechanical Plan Review Fee $35.17 $35.17 Paid 03/01/2024
Plumbing Plan Review Fee $34.45 $34.45 Paid 03/01/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 04/24/2024
Water System Development ChargeFee - Tenant Improvment/Addition $889.75 $889.75 Paid 04/24/2024
Sewer System Development ChargeFee - Tenant Improvment/Addition $1,298.10 $1,298.10 Paid 04/24/2024
Resubmittal Fee $180.00 $180.00 Paid 04/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Partial Pass 5/3/2024 5/3/2024 05/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/04/2024
1. plumbing supply was live pressure at 45 PSI 2. waste approved at air test 5 PSI run test on fitting same room approved 3.perform run test on tie in of waste on floor below at time of final

Frame Inspection Not Ready 5/3/2024 5/3/2024 05/04/2024
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Not Ready 5/6/2024 5/6/2024 05/06/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 5/7/2024 5/7/2024 05/07/2024
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 5/8/2024 5/8/2024 05/08/2024
Shannon King ((253) 840-6684)
Plumbing Final Inspection Not Ready 5/30/2024 5/30/2024 05/30/2024
Shannon King ((253) 840-6684)
Mechanical Final Inspection Not Ready 5/30/2024 5/30/2024 05/30/2024
Shannon King ((253) 840-6684)
Building Final Inspection Not Ready 5/30/2024 5/30/2024 05/30/2024
Shannon King ((253) 840-6684)
Mechanical Final Inspection Failed 6/3/2024 6/3/2024 06/03/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/03/2024
1 ; provide duct support at booster fan as discussed with contractor.

Building Final Inspection Not Ready 6/3/2024 6/3/2024 06/03/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/03/2024
1 ; provide fire and electrical final prior to building final. not ready

Building Final Inspection Partial Pass 6/4/2024 6/4/2024 06/04/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/04/2024
1 ; provide fire and electrical final prior to building final. not ready

Erosion And Sediment Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Underfloor Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Re-Roof Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 06/13/2024
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
05/04/2024
1. plumbing supply was live pressure at 45 PSI 2. waste approved at air test 5 PSI run test on fitting same room approved 3.perform run test on tie in of waste on floor below at time of final

Mechanical Rough In Inspection VOID 06/13/2024
Shannon King ((253) 840-6684)
Building Final Inspection Passed w/ Conditions 6/13/2024 6/13/2024 06/13/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/13/2024
1 ; provide fire and electrical final prior to building final. not ready

Other/Miscellaneous
Resolved
06/23/2024
pending fire final

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20240799 Returned for Correction Commercial - Tenant Improvement/Remodel

Documents & Images

Date Uploaded File Type Name
03/01/2024 Form APPLICATION
03/01/2024 Letter Incomplete Application Notice
03/01/2024 Receipt Receipt for transaction:2024-000388
04/02/2024 Letter Permit Review Correction Letter
04/04/2024 Letter Incomplete Application Notice
04/04/2024 Receipt Receipt for transaction:2024-000661
04/05/2024 Form CORRECTION RESPONSE LETTER
04/12/2024 Letter Permit Review Correction Letter
04/24/2024 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
04/24/2024 Letter Permit - Detailed
04/24/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
04/24/2024 Receipt Receipt for transaction:2024-000834
04/24/2024 Receipt Receipt for transaction:2024-000835
05/04/2024 Report Inspection Report (Frame Inspection)
05/04/2024 Report Inspection Report (Plumbing Rough In Inspection)
05/06/2024 Report Inspection Report (Mechanical Rough In Inspection)
05/07/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/07/2024 Report Inspection Report (Frame Inspection)
05/08/2024 Report Inspection Report (Mechanical Rough In Inspection)
05/08/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/15/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/30/2024 Report Inspection Report (Building Final Inspection)
05/30/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/30/2024 Report Inspection Report (Mechanical Final Inspection)
05/30/2024 Report Inspection Report (Plumbing Final Inspection)
06/03/2024 Report Inspection Report (Building Final Inspection)
06/03/2024 Report Inspection Report (Mechanical Final Inspection)
06/03/2024 Report Inspection Report (Plumbing Final Inspection)
06/04/2024 Report Inspection Report (Building Final Inspection)
06/04/2024 Report Inspection Report (Mechanical Final Inspection)