Summary

PRCTI20241352
Commercial - Tenant Improvement/Remodel
Ready for Issuance
PUYALLUP TT LLC
Alteration/Remodel
Extensive interior remodel and exterior facade changes (removal of mansard roof) for a new Starbucks Coffee. - STARBUCKS
08/28/2024
09/03/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 12/16/2024 12/13/2024
Building Review Approved 12/16/2024 12/11/2024
Engineering Traffic Review Approved 12/16/2024 12/06/2024
Planning Review Approved 12/16/2024 12/03/2024
Fire Review Approved 12/16/2024 12/03/2024
Planning Review Approved 09/30/2024 09/25/2024
Engineering Review Failed 09/30/2024 09/25/2024
Engineering Traffic Review Approved 09/30/2024 09/24/2024
Fire Review Approved 09/30/2024 09/24/2024
Building Review Failed 09/30/2024 09/23/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/07/2025
AC Unit Fee $39.10 $39.10 Paid 03/07/2025
Exhaust Vent Fan (Bath) Fee $14.10 $14.10 Paid 03/07/2025
Mechanical Duct Work Fee $24.00 $24.00 Paid 03/07/2025
Building Permit Fee $4,820.25 $4,820.25 Paid 03/07/2025
Mechanical Permit Fee $40.00 $40.00 Paid 03/07/2025
Backflow Preventor Fee $312.00 $312.00 Paid 08/30/2024
Plumbing Permit Fee $40.00 $40.00 Paid 03/07/2025
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 03/07/2025
Plumbing Fixtures Fee $299.00 $299.00 Paid 03/07/2025
Water Heater Fee $13.00 $13.00 Paid 03/07/2025
Building Plan Review Fee $3,133.16 $3,133.16 Paid 08/30/2024
Mechanical Plan Review Fee $76.18 $76.18 Paid 08/30/2024
Plumbing Plan Review Fee $457.76 $457.76 Paid 08/30/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 03/07/2025
Traffic Impact Fee (Commercial) $51,750.00 $51,750.00 Paid 01/24/2025
Resubmittal Fee $180.00 $180.00 Paid 12/02/2024
Outstanding Fees Amount Paid Owing Date Paid
Sewer System Development ChargeFee - Tenant Improvment/Addition $13,614.58 $0.00 $13,614.58 Not Paid
Water System Development ChargeFee - Tenant Improvment/Addition $2,167.38 $0.00 $2,167.38 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$15,781.96    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • A separate permit may be required if fire alarm or sprinkler system is altered • Fire extinguishers required per code to be installed at time of Fire Final • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Frontage Improvements - Non-Residential Tenant Improvements Open Prior to Issuance
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a right-of-way or civil construction permit issued. A right-of-way permit is required if there is existing vertical curb in good condition and a civil construction permit is required if there is no existing vertical curbing. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved. The subject site may qualify for the fee-in-lieu program in which the applicant may request and submit justification to pay a fee rather than constructing all or part of the required frontage improvements. Allowance of fee-in-lieu shall be at the discretion of the City and may be denied if the City Engineer determines it will be more beneficial to the public to have frontage improvements built along the street frontage adjoining the property or access to the property. The justification to allow use of the fee-in-lieu program shall not be based on cost savings to the applicant in comparison with constructing required improvement adjacent to the property.
External Gravity Grease Interceptor Open Prior to Occupancy
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project. Existing 1,000 gallon grease interceptor is adequately sized per Construction Plan Set. The existing grease interceptor must be pumped, cleaned, inspected, and brought up to current standard prior to occupancy. [Yianni Charitou @ 03/25/2025 2:32 PM]
Miscellaneous Condition Open Prior to Completion
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. Per scoping document the project will add 11.5 net new PM Peak hour trips. 11.5 x 4500 = $51,750 traffic impact fee, due prior to completion.
Miscellaneous Condition Open Prior to Issuance
Engineering Division
According to PMC Chapter 19.06.020, contiguous parcels are required to be combined when they share common facilities including but not limited to access, parking, utilities, open space, landscaping, signage, etc., for which no easements or other legal instruments exist to ensure continuous ownership, use and maintenance of such facilities. In this particular case, tax parcels 0420271171 and 7845100032 share such facilities including drive thru access and signage, parking, landscaping, trash enclosure, and utilities. A boundary line adjustment may also suffice for ensuring continuous ownership of the facilities in question. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument for the continuous ownership, use, and maintenance of the common facilities on tax parcels 0420271171 and 7845100032 in compliance with Puyallup Municipal Code.
Ready to Issue - Need Business License Endorsement Open Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Contractor Info Open Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
08/29/2024 Letter Incomplete Application Notice
08/30/2024 Receipt Receipt for transaction:2024-001800
09/25/2024 Letter Permit Review Correction Letter
09/25/2024 Form Building Permit Application (Flattened)
09/25/2024 Plans Starbucks East Main Scoping - Puyallup - 7-10-24 (Flattened)
12/02/2024 Receipt Receipt for transaction:2024-002491
12/13/2024 Form 2024-11-20_Starbucks E-Main-Ave_Response Letter (Flattened)
12/13/2024 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
12/13/2024 Form PLUMBING FIXTURE WORKSHEET - RESUB (Stamped)
12/13/2024 Plans DESIGN REVIEW APPLICATION (Stamped)
12/13/2024 Form ENERGY WORKSHEETS (Stamped)
12/13/2024 Report STRUCTURAL CALCS (Stamped)
01/24/2025 Receipt Receipt for transaction: 2025-000158
03/07/2025 Receipt Receipt for transaction:2025-000463


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.