CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20250140
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 02/24/2025 |
Building Permit Fee | $1,553.75 | $1,553.75 | Paid | 02/24/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 02/24/2025 |
Building Plan Review Fee | $1,009.94 | $1,009.94 | Paid | 01/28/2025 |
Mechanical Plan Review Fee | $26.00 | $26.00 | Paid | 01/28/2025 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 02/24/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $2,919.69 | $2,919.69 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Failed | 3/12/2025 | 3/12/2025 | 03/12/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/12/2025
1 ; provide lead shielding report from physicist at time of inspection.
2 ; complete lead shielding at door frame as per city approved plans.
not ready
|
||||
Wallboard / Drywall Inspection | Not Ready | 3/17/2025 | 3/17/2025 | 03/17/2025 |
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | Not Ready | 4/7/2025 | 4/7/2025 | 04/07/2025 |
Shannon King ((253) 840-6684) | ||||
Fire Or Smoke Damper Inspection | VOID | 04/21/2025 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 04/21/2025 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 04/21/2025 | ||
David Drake ((253) 864-4171) | ||||
Erosion And Sediment Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Footing/Setback Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Engineering Final Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Planning Final Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Underfloor Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Exhaust/Vent Fans Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Gas Test Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Underfloor Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Block Wall Rebar Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | VOID | 04/22/2025 | ||
Shannon King ((253) 840-6684) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems.
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
01/28/2025 | Receipt | Receipt for transaction:2025-000182 |
02/24/2025 | Form | Building_Permit_Application_-_GSH_ED_X-Ray_Equipment_Replacement (Flattened) |
02/24/2025 | Plans | CONSTRUCTION PLAN SET (Stamped) |
02/24/2025 | Report | DTRUCTURAL CALCS (Stamped) |
02/24/2025 | Letter | Permit - Detailed |
02/24/2025 | Receipt | Receipt for transaction:2025-000384 |
03/12/2025 | Report | Inspection Report (Frame Inspection) |
03/14/2025 | Report | Inspection Report (Frame Inspection) |
03/17/2025 | Report | Inspection Report (Wallboard / Drywall Inspection) |
03/19/2025 | Report | Inspection Report (Wallboard / Drywall Inspection) |
04/07/2025 | Report | Inspection Report (Mechanical Final Inspection) |
04/22/2025 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView