Summary

PRCTI20250140
Commercial - Tenant Improvement/Remodel
Closed
MULTICARE HEALTH SYSTEM
Alteration/Remodel
To replaces an existing X-Ray Imaging Machine in the ER on Level 1 /Dally Tower. To includes revised mechanical, electrical and structural connections for new equipment, along with wall finish upgrades and a resized entry door at Room M180.5. New Door will be provided with lead shielding as required per Medical Physicist report. Project is being reviewed by WA DOH under CRS#61639776.
01/28/2025
02/24/2025
10/19/2025

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 02/27/2025 02/24/2025
Planning Review Approved 02/27/2025 02/19/2025
Engineering Review VOID 02/27/2025 02/19/2025
Engineering Traffic Review Approved 02/27/2025 02/12/2025
Building Review Approved 02/27/2025 02/04/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/24/2025
Building Permit Fee $1,553.75 $1,553.75 Paid 02/24/2025
Mechanical Permit Fee $40.00 $40.00 Paid 02/24/2025
Building Plan Review Fee $1,009.94 $1,009.94 Paid 01/28/2025
Mechanical Plan Review Fee $26.00 $26.00 Paid 01/28/2025
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/24/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Failed 3/12/2025 3/12/2025 03/12/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/12/2025
1 ; provide lead shielding report from physicist at time of inspection. 2 ; complete lead shielding at door frame as per city approved plans. not ready

Wallboard / Drywall Inspection Not Ready 3/17/2025 3/17/2025 03/17/2025
Shannon King ((253) 840-6684)
Mechanical Final Inspection Not Ready 4/7/2025 4/7/2025 04/07/2025
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 04/21/2025
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 04/21/2025
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 04/21/2025
David Drake ((253) 864-4171)
Erosion And Sediment Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Mechanical Final Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Underfloor Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Gas Test Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Underfloor Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 04/22/2025
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • A separate permit may be required if fire alarm or sprinkler system is altered • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems. • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/28/2025 Receipt Receipt for transaction:2025-000182
02/24/2025 Form Building_Permit_Application_-_GSH_ED_X-Ray_Equipment_Replacement (Flattened)
02/24/2025 Plans CONSTRUCTION PLAN SET (Stamped)
02/24/2025 Report DTRUCTURAL CALCS (Stamped)
02/24/2025 Letter Permit - Detailed
02/24/2025 Receipt Receipt for transaction:2025-000384
03/12/2025 Report Inspection Report (Frame Inspection)
03/14/2025 Report Inspection Report (Frame Inspection)
03/17/2025 Report Inspection Report (Wallboard / Drywall Inspection)
03/19/2025 Report Inspection Report (Wallboard / Drywall Inspection)
04/07/2025 Report Inspection Report (Mechanical Final Inspection)
04/22/2025 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.