| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Planning Review
|
Approved
|
10/23/2025
|
10/21/2025
|
|
|
|
|
Engineering Traffic Review
|
Approved
|
10/23/2025
|
10/15/2025
|
|
|
|
|
|
Other/Miscellaneous
A traffic scoping worksheet will be required for this project. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. In general, trip generation regression equations shall be used when the R2 value is 0.70 or greater.
Once the traffic scoping worksheet is reviewed, a written response would be sent to the applicant’s traffic engineer outlining the scope of the project’s Traffic Access and Impact Study
The City has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. Final fees will be calculated and assessed by the City at the time of building permit issuance. The City is currently performing a traffic impact fee rate study. Impact fee rates will be charged prior to building occupancy, meaning the current $4500 per PM Peak hour trip rate cannot be vested.
Expected current land use is bed/linen store, changing to a Health/Fitness club.
[Mieco Hutchens @ 08/28/2025 9:13 AM]
Discussion continues between the City and the applicants Traffic Engineer.
Impact fees will be assessed when an agreement is reached on how to calculate trip generation.
Updated Traffic Scoping document is approved as submitted
[Mieco Hutchens @ 10/15/2025 10:16 AM]
|
|
Fire Review
|
Approved
|
10/23/2025
|
10/14/2025
|
|
|
|
|
Engineering Review
|
Approved
|
10/23/2025
|
10/13/2025
|
|
|
|
|
Building Review
|
Approved
|
10/23/2025
|
10/13/2025
|
|
|
|
|
Engineering Traffic Review
|
Failed
|
09/02/2025
|
08/28/2025
|
|
|
|
|
|
Other/Miscellaneous
A traffic scoping worksheet will be required for this project. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. In general, trip generation regression equations shall be used when the R2 value is 0.70 or greater.
Once the traffic scoping worksheet is reviewed, a written response would be sent to the applicant’s traffic engineer outlining the scope of the project’s Traffic Access and Impact Study
The City has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. Final fees will be calculated and assessed by the City at the time of building permit issuance. The City is currently performing a traffic impact fee rate study. Impact fee rates will be charged prior to building occupancy, meaning the current $4500 per PM Peak hour trip rate cannot be vested.
Expected current land use is bed/linen store, changing to a Health/Fitness club.
[Mieco Hutchens @ 08/28/2025 9:13 AM]
Discussion continues between the City and the applicants Traffic Engineer.
Impact fees will be assessed when an agreement is reached on how to calculate trip generation.
|
|
Planning Review
|
Approved
|
09/02/2025
|
08/25/2025
|
|
|
|
|
Fire Review
|
Approved
|
09/02/2025
|
08/22/2025
|
|
|
|
|
Building Review
|
Approved
|
09/02/2025
|
08/22/2025
|
|
|
|
|
|
See Document Markup
Structural work and documents cannot be deferred and must be part of the permit set.
|
|
|
See Document Markup
Attachment of TV Support System cannot be deferred. All relevant information, plans, and calculations must be included with this permit.
|
|
|
See Document Markup
Structural documents cannot be deferred.
|
|
|
See Document Markup
Please clarify how the signage will be attached. Typical at all wall signs.
|
|
|
See Document Markup
Please provide structural calculations and plans. These documents should include verification or corrections to the existing structure related to the support of the proposed mechanical units.
|
|
|
See Document Markup
Please provide the full Occupant Load Calculations. List each room, occupancy, occupant load factor, area, and occupant load.
|
|
|
See Document Markup
See the review comment on the Mixing Valve Schedule, sheet P 401, for maximum temperature at fixtures.
|
|
|
See Document Markup
The hot water temperature at showers and lavatories cannot exceed 120 degrees fahrenheit. Please verify compliance at the fixtures with the mixed water temperature at 125 degrees, or reduce the water temperature as needed.
|
|
|
See Document Markup
Please verify the Fixture Units for both supply and drainage. It appears that the values used are from the Public column of the relevant tables. However, gymnasiums would require the use of the Assembly columns. Please also ensure the provided supply and drainage line sizes and lengths comply with the correct Fixture Unit values.
|
|
|
See Document Markup
Please correct this note to reference the 2017 edition of the A117.1 Standard.
|
|
|
See Document Markup
The International Plumbing Code has not been adopted by the State of Washington. Please provide the relevant code section in the 2021 Uniform Plumbing Code.
|
|
|
See Document Markup
Please correct the floor transition notes to conform to the 2017 edition of the A117.1 Standard.
|
|
|
See Document Markup
Please provide a detail for the side-light at door #104.
|
|
|
See Document Markup
Please note the side lights as tempered or safety glazed.
|
|
Engineering Review
|
Approved
|
09/02/2025
|
08/21/2025
|
|
|
|
|
|
See Document Markup
Include the site address, suite number, and tax parcel number on the construction plan set.
|
|
|
See Document Markup
Update slab removal plan to reflect the accurate sewer connection path.
|
|
|
See Document Markup
Verify location of sanitary sewer connection provided by Landlord. There is no sanitary sewer at the northeast corner of the building. According to the PRUSR20241718 sewer as-builts, the sewer main was extended to the demising wall with Boot Barn at the southeast corner of the Planet Fitness space. The sewer is to be extended to the tenant space as described in permit application PRCTI20250870. Please note on the plans that the contractor shall verify the location of the sewer stub prior to installing any interior sanitary sewer plumbing.
|
|
Building Review
|
Failed
|
07/16/2025
|
07/14/2025
|
|
|
|
|
|
Other/Miscellaneous
|
|
|
See Document Markup
Structural work and documents cannot be deferred and must be part of the permit set.
|
|
|
See Document Markup
Attachment of TV Support System cannot be deferred. All relevant information, plans, and calculations must be included with this permit.
|
|
|
See Document Markup
Structural documents cannot be deferred.
|
|
|
See Document Markup
Please clarify how the signage will be attached. Typical at all wall signs.
|
|
|
See Document Markup
Please provide structural calculations and plans. These documents should include verification or corrections to the existing structure related to the support of the proposed mechanical units.
|
|
|
See Document Markup
Please provide the full Occupant Load Calculations. List each room, occupancy, occupant load factor, area, and occupant load.
|
|
|
See Document Markup
See the review comment on the Mixing Valve Schedule, sheet P 401, for maximum temperature at fixtures.
|
|
|
See Document Markup
The hot water temperature at showers and lavatories cannot exceed 120 degrees fahrenheit. Please verify compliance at the fixtures with the mixed water temperature at 125 degrees, or reduce the water temperature as needed.
|
|
|
See Document Markup
Please verify the Fixture Units for both supply and drainage. It appears that the values used are from the Public column of the relevant tables. However, gymnasiums would require the use of the Assembly columns. Please also ensure the provided supply and drainage line sizes and lengths comply with the correct Fixture Unit values.
|
|
|
See Document Markup
Please correct this note to reference the 2017 edition of the A117.1 Standard.
|
|
|
See Document Markup
The International Plumbing Code has not been adopted by the State of Washington. Please provide the relevant code section in the 2021 Uniform Plumbing Code.
|
|
|
See Document Markup
Please correct the floor transition notes to conform to the 2017 edition of the A117.1 Standard.
|
|
|
See Document Markup
Please provide a detail for the side-light at door #104.
|
|
|
See Document Markup
Please note the side lights as tempered or safety glazed.
|
|
Fire Review
|
Approved
|
07/16/2025
|
07/10/2025
|
|
|
|
|
Engineering Traffic Review
|
Failed
|
07/16/2025
|
07/09/2025
|
|
|
|
|
|
Other/Miscellaneous
A traffic scoping worksheet will be required for this project. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. In general, trip generation regression equations shall be used when the R2 value is 0.70 or greater.
Once the traffic scoping worksheet is reviewed, a written response would be sent to the applicant’s traffic engineer outlining the scope of the project’s Traffic Access and Impact Study
The City has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. Final fees will be calculated and assessed by the City at the time of building permit issuance. The City is currently performing a traffic impact fee rate study. Impact fee rates will be charged prior to building occupancy, meaning the current $4500 per PM Peak hour trip rate cannot be vested.
Expected current land use is bed/linen store, changing to a Health/Fitness club.
|
|
Engineering Review
|
Failed
|
07/16/2025
|
07/08/2025
|
|
|
|
|
|
See Document Markup
Include the site address, suite number, and tax parcel number on the construction plan set.
|
|
|
See Document Markup
Update slab removal plan to reflect the accurate sewer connection path.
|
|
|
See Document Markup
Verify location of sanitary sewer connection provided by Landlord. There is no sanitary sewer at the northeast corner of the building. According to the PRUSR20241718 sewer as-builts, the sewer main was extended to the demising wall with Boot Barn at the southeast corner of the Planet Fitness space. The sewer is to be extended to the tenant space as described in permit application PRCTI20250870. Please note on the plans that the contractor shall verify the location of the sewer stub prior to installing any interior sanitary sewer plumbing.
|
|
Planning Review
|
Approved
|
07/16/2025
|
07/07/2025
|
|
|
|