CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20250997
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 08/25/2025 |
| Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 08/25/2025 |
| Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $35.95 | $35.95 | Paid | 08/25/2025 |
| Exhaust Vent Fan (Bath) Fee | $56.40 | $56.40 | Paid | 08/25/2025 |
| Furnace (over 100,000 BTU) Fee | $24.00 | $24.00 | Paid | 08/25/2025 |
| Gas Piping (Mechanical) Fee | $6.30 | $6.30 | Paid | 07/23/2025 |
| Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 08/25/2025 |
| Building Permit Fee | $3,233.75 | $3,233.75 | Paid | 08/25/2025 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 08/25/2025 |
| Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $40.25 | Paid | 08/25/2025 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 08/25/2025 |
| Plumbing Fixtures Fee | $208.00 | $208.00 | Paid | 08/25/2025 |
| Water Heater Fee | $13.00 | $13.00 | Paid | 08/25/2025 |
| Building Plan Review Fee | $2,101.94 | $2,101.94 | Paid | 07/23/2025 |
| Mechanical Plan Review Fee | $130.49 | $130.49 | Paid | 07/23/2025 |
| Plumbing Plan Review Fee | $195.81 | $195.81 | Paid | 07/23/2025 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 08/25/2025 |
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $16,688.84 | $16,688.84 | Paid | 08/25/2025 |
| Water System Development Charge Fee - Tenant Improvment/Addition | $10,114.44 | $10,114.44 | Paid | 08/25/2025 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 08/13/2025 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 10/27/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $33,617.27 | $33,617.27 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Not Ready | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Below Slab Inspection | Passed | 9/15/2025 | 9/15/2025 | 09/15/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Re-Roof Inspection | Not Ready | 9/29/2025 | 9/29/2025 | 09/29/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Re-Roof Inspection | Partial Pass | 9/30/2025 | 9/30/2025 | 09/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/30/2025
rtu curb on roof ok
|
||||
| Mechanical Rough In Inspection | Partial Pass | 10/22/2025 | 10/22/2025 | 10/22/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/22/2025
will see duct work over top of office/bathroom walls
|
||||
| Plumbing Rough In Inspection | Passed | 10/22/2025 | 10/22/2025 | 10/22/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Frame Inspection | Partial Pass | 10/22/2025 | 10/22/2025 | 10/22/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/22/2025
interior walls ok minus demising wall between warehouse and offices/bathrooms, provide architects wall to beam detail
|
||||
| Frame Inspection | Partial Pass | 10/28/2025 | 10/28/2025 | 10/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Energy (Insulation) Inspection | Partial Pass | 10/30/2025 | 10/30/2025 | 10/30/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Passed | 10/31/2025 | 10/31/2025 | 10/31/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Combination Frame And Rough In Inspection | Passed | 12/2/2025 | 12/2/2025 | 12/02/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Ceiling Grid/T-Bar Inspection | Passed | 12/2/2025 | 12/2/2025 | 12/02/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Comment Building Div Inspection | Partial Pass | 12/4/2025 | 12/4/2025 | 12/04/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Final Inspection | Failed | 12/30/2025 | 12/30/2025 | 12/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/30/2025
1:insulate hw tank flex lines
2:install hammer arrestor at ice maker
|
||||
| Mechanical Final Inspection | Failed | 12/30/2025 | 12/30/2025 | 12/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/30/2025
provide osa on balance report
|
||||
| Plumbing Final Inspection | Passed | 1/6/2026 | 1/6/2026 | 01/06/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Mechanical Final Inspection | Passed | 1/6/2026 | 1/6/2026 | 01/06/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Building Final Inspection | Passed | 1/6/2026 | 1/6/2026 | 01/06/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Erosion And Sediment Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Comment Engineering Div Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Footing/Setback Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Foundation/Rebar Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Underfloor Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Slab/Insulation Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Block Wall Rebar Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Roof Sheathing Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Shear Wall Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Firewall/Firestop Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Exit Lighting Test Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Hydronic Piping Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Gas Test Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Refrigeration Line Test Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Exhaust Hood Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Light Test For Grease Duct Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Exhaust/Vent Fans Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Shower Pan Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Medical Gas Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Fire Or Smoke Damper Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Hydrostatic Test 200Lbs 2Hrs | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Emergency Radio Test Review Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Engineering Final Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Planning Final Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Fire Final Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Re-Roof Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Mechanical Rough In Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Frame Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Energy (Insulation) Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Comment Building Div Inspection | VOID | 01/06/2026 | ||
| James LaVergne ((253) 841-5590) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of Puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required contractor to provide light meter
• Separate permits required for fire alarm and fire sprinkler
• RTU’S will be required to be tested for shut down.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
| Date Uploaded | File Type | Name |
|---|---|---|
| 08/21/2025 | Plans | CONSTRUCTION PLAN SET - (Stamped) |
| 08/21/2025 | Form | PLUMB FIXTURE WORKSHEET (Stamped) |
| 08/21/2025 | Report | STRUCT CALCS (Stamped) |
| 08/21/2025 | Form | ENERGY CODE (Stamped) |
| 08/25/2025 | Letter | Permit - Detailed |
| 10/27/2025 | Receipt | Receipt for transaction:2025-002077 |
| 10/28/2025 | Report | Inspection Report (Re-Roof Inspection) |
| 10/28/2025 | Report | Inspection Report (Frame Inspection) |
| 10/30/2025 | Report | Inspection Report (Energy (Insulation) Inspection) |
| 10/31/2025 | Plans | CONSTRUCTION PLAN SET - M-1 REVISED WITH OFFICES - REV (1) (Stamped) |
| 10/31/2025 | Plans | CONSTRUCTION PLAN SET - REV (1) (Stamped) |
| 12/04/2025 | Report | Inspection Report (Comment Building Div Inspection) |
| 01/06/2026 | Report | Inspection Report (Plumbing Final Inspection) |
| 01/06/2026 | Report | Inspection Report (Mechanical Final Inspection) |
| 01/06/2026 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.